X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040116000

Well Details

Well ID: 1166040116000
Loading map...
Location: 00/16-01-116-04W6/0
Location Alias: 00/16-01-16-04 W6M
Location Alias 2: 00/16-01-116-04 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 01
County/Municipality: Mackenzie County
Well Name: ACL LARNE 16-1-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0040992
License Date: 1971-10-04
License Status: Abandoned
Spud Date: 1971-11-11
Final Drill Date: 1971-12-01
Well Total Depth: 1464.90 m
Surface Hole Latitude: 59.050659
Surface Hole Longitude: -118.515217

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-10-04 Obtained License
1971-11-17 Drill Stem Test Performed
1971-11-24 Drill Stem Test Performed
1971-12-01 Finished Drilling
1971-12-01 Well Mode changed to Drilled and Cased
1971-12-03 Drill Stem Test Performed
1971-12-04 Liner Casing Operation Performed
1972-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-23 Perforation Treatment Performed - Jet Perforation
1972-01-23 Well Began Production
1972-01-23 Well Fluid changed to Crude Oil
1972-01-23 Well Mode changed to Flowing
1972-03-27 Well Fluid changed to Crude Oil
1972-03-27 Well Mode changed to Pumping
1998-11-30 Well Log Performed
1998-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-01 Perforation Treatment Performed - Jet Perforation
1998-12-01 Plug Back Performed
1998-12-01 Well Fluid changed to Crude Oil
1998-12-01 Well Mode changed to Abandoned Zone
1998-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-03 Perforation Treatment Performed - Acid Wash - No Pressure
1998-12-03 Well Log Performed
2001-02-18 Perforation Treatment Performed - Jet Perforation
2001-02-19 Well Log Performed
2001-02-20 Well Log Performed
2001-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-26 Well Log Performed
2008-02-11 Well Log Performed
2008-03-05 Perforation Treatment Performed - Cement Plug
2008-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-07 Plug Back Performed
2008-03-07 Well Log Performed
2008-03-08 Well Log Performed
2008-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-09 Perforation Treatment Performed - Jet Perforation
2008-03-09 Plug Back Performed
2008-03-09 Well Log Performed
2008-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-10 Perforation Treatment Performed - Remedial Casing
2008-03-11 Perforation Treatment Performed - Jet Perforation
2008-03-11 Well Log Performed
2008-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-12 Perforation Treatment Performed - Jet Perforation
2008-03-12 Well Log Performed
2008-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-13 Perforation Treatment Performed - Remedial Casing
2008-03-13 Well Log Performed
2008-03-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-01-23 Perforation 1385.00 1386.80 7
2001-02-18 Perforation 1212.50 1213.50 13
2001-02-18 Perforation 1209.10 1210.60 13
2001-02-18 Perforation 1203.30 1207.60 13
2001-02-22 Acid Treatment 1203.30 1213.50 0
2008-03-05 Cement Plug 1310.40 1367.00 0
2008-03-07 Packing Device Capped w/Cement 1248.00 1256.00 0
2008-03-09 Perforation 1158.00 1159.00 14
2008-03-09 Packing Device Capped w/Cement 1190.00 1198.00 0
2008-03-10 Remedial Casing Cementing 1158.00 1159.00 0
2008-03-10 Packing Device Capped w/Cement 1043.00 1052.00 0
1972-01-23 Perforation 1388.40 1389.90 7
2008-03-11 Perforation 529.00 530.00 14
2008-03-12 Packing Device Capped w/Cement 514.00 522.00 0
2008-03-12 Perforation 224.00 225.00 14
2008-03-12 Acid Treatment 224.00 225.00 0
2008-03-13 Remedial Casing Cementing 224.00 225.00 0
2008-03-13 Packing Device Capped w/Cement 212.00 220.00 0
1972-01-23 Perforation 1392.30 1396.00 7
1972-01-23 Acid Treatment 1385.00 1396.00 0
1998-12-01 Packing Device Capped w/Cement 1367.00 1375.00 0
1998-12-01 Perforation 1267.00 1270.00 13
1998-12-01 Perforation 1277.70 1280.20 13
1998-12-03 Acid Wash 1267.00 1280.20 0
1998-12-03 Acid Treatment 1267.00 1280.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 2 0.0 0.0 0.0
1972 5961 0.0 0.0 0.0
1973 7777 0.0 0.0 0.0
1974 6900 0.0 0.0 0.0
1975 8535 0.0 0.0 0.0
1976 6648 0.0 0.0 0.0
1977 8064 0.0 0.0 0.0
1978 8215 0.0 0.0 0.0
1979 7941 0.0 0.0 0.0
1980 7754 0.0 0.0 0.0
1981 7084 0.0 0.0 0.0
1982 7646 0.0 0.0 0.0
1983 8325 0.0 0.0 0.0
1984 8344 0.0 0.0 0.0
1985 8399 0.0 0.0 0.0
1986 3120 0.0 0.0 0.0
1987 5273 0.0 0.0 0.0
1988 7523 0.0 0.0 0.0
1989 8609 0.0 0.0 0.0
1990 7730 0.0 0.0 0.0
1991 8326 0.0 0.0 0.0
1992 6300 0.0 0.0 0.0
1995 1442 0.0 0.0 0.0

For data sources see[5]

References