X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040202002

Well Details

Well ID: 1166040202002
Loading map...
Location: 00/02-02-116-04W6/2
Location Alias: 00/02-02-16-04 W6M
Location Alias 2: 00/02-02-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 02
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 2-2-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0100420
License Date: 1983-02-02
License Status: Abandoned
Spud Date: 1983-02-04
Final Drill Date: 1983-02-21
Well Total Depth: 1459.00 m
Surface Hole Latitude: 59.041455
Surface Hole Longitude: -118.554502

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-02-02 Obtained License
1983-02-07 Water Flow Occurred
1983-02-16 Drill Stem Test Performed
1983-02-19 Lost Circulation Occurred
1983-02-21 Finished Drilling
1983-02-21 Well Mode changed to Drilled and Cased
1983-02-24 Liner Casing Operation Performed
1983-03-07 Perforation Treatment Performed - Jet Perforation
1983-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-04 Perforation Treatment Performed - Jet Perforation
2001-04-04 Plug Back Performed
2001-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-30 Well Began Production
2001-07-30 Well Fluid changed to Gas
2001-07-30 Well Mode changed to Flowing
2002-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-18 Perforation Treatment Performed - Jet Perforation
2002-09-18 Plug Back Performed
2002-09-18 Well Fluid changed to Gas
2002-09-18 Well Log Performed
2002-09-18 Well Mode changed to Abandoned Zone
2002-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-27 Plug Back Performed
2007-01-28 Perforation Treatment Performed - Jet Perforation
2007-01-28 Well Log Performed
2007-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-29 Perforation Treatment Performed - Remedial Casing
2007-01-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-07 Perforation 1412.50 1413.50 7
2001-04-05 Acid Treatment 1277.50 1286.00 0
2002-09-18 Packing Device Capped w/Cement 1256.00 1264.00 0
2002-09-18 Perforation 1221.00 1226.00 13
2002-09-19 Acid Treatment 1221.00 1226.00 0
2002-09-27 Packing Device Capped w/Cement 1207.50 1215.50 0
2007-01-28 Perforation 227.00 228.00 14
2007-01-29 Remedial Casing Cementing 227.00 228.00 0
2007-01-29 Packing Device Capped w/Cement 217.00 225.00 0
1983-03-07 Perforation 1409.50 1411.00 7
1983-03-07 Perforation 1406.50 1408.50 7
1983-03-07 Perforation 1398.50 1400.00 7
1983-03-07 Perforation 1418.00 1419.50 7
1983-03-09 Acid Treatment 1418.00 1419.50 0
2001-04-04 Packing Device Capped w/Cement 1388.00 1396.00 0
2001-04-04 Perforation 1277.50 1279.00 13
2001-04-04 Perforation 1283.00 1286.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 3589 0.0 0.0 0.0
2002 564 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-02-07 Water Flow 48.00 0.00
1983-02-19 Lost Circulation 1431.00 1431.00

For data sources see[6]

References