X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040206002

Well Details

Well ID: 1166040206002
Loading map...
Location: 00/06-02-116-04W6/2
Location Alias: 00/06-02-16-04 W6M
Location Alias 2: 00/06-02-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 02
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 6-2-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0265638
License Date: 2002-01-07
License Status: Abandoned
Spud Date: 2002-01-19
Final Drill Date: 2002-02-01
Well Total Depth: 1440.00 m
Surface Hole Latitude: 59.043241
Surface Hole Longitude: -118.561518

For data sources see[1][2]

Well History

Date Event
2002-01-07 Obtained License
2002-01-23 Surface Casing Operation Performed
2002-01-29 Well Log Performed
2002-01-30 Production Casing Operation Performed
2002-02-01 Finished Drilling
2002-02-01 Lost Circulation Occurred
2002-02-01 Well Mode changed to Drilled and Cased
2002-02-02 Liner Casing Operation Performed
2002-02-02 Well Log Performed
2002-02-03 Rig Released
2002-02-03 Well Log Performed
2002-02-19 Well Log Performed
2002-02-20 Perforation Treatment Performed - Jet Perforation
2002-02-20 Well Log Performed
2002-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-13 Well Log Performed
2003-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-14 Perforation Treatment Performed - Cement Squeeze
2003-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-18 Perforation Treatment Performed - Jet Perforation
2003-08-18 Well Log Performed
2003-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-22 Perforation Treatment Performed - Jet Perforation
2003-08-22 Plug Back Performed
2003-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-03 Well Began Production
2003-10-03 Well Fluid changed to Gas
2003-10-03 Well Mode changed to Flowing
2008-03-16 Perforation Treatment Performed - Cement Plug
2008-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-18 Plug Back Performed
2008-03-18 Well Fluid changed to Gas
2008-03-18 Well Log Performed
2008-03-18 Well Mode changed to Abandoned Zone
2008-03-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-20 Perforation 1396.00 1399.00 13
2003-08-18 Acid Treatment 1396.00 1403.00 0
2003-08-22 Packing Device Capped w/Cement 1382.00 1390.00 0
2003-08-22 Perforation 1275.00 1276.00 13
2003-08-22 Perforation 1279.50 1280.50 13
2003-08-22 Perforation 1223.50 1225.50 13
2003-08-22 Perforation 1226.50 1228.00 13
2003-08-23 Acid Treatment 1275.00 1280.50 0
2003-08-25 Acid Treatment 1223.50 1228.00 0
2008-03-16 Cement Plug 1299.90 1375.00 0
2008-03-18 Packing Device Capped w/Cement 1262.00 1270.00 0
2002-02-20 Perforation 1402.00 1403.00 13
2008-03-18 Packing Device Capped w/Cement 1210.00 1218.00 0
2002-02-20 Perforation 1407.00 1410.50 13
2002-02-20 Perforation 1412.00 1414.00 13
2002-02-21 Acid Treatment 1396.00 1414.00 0
2003-08-14 Acid Treatment 1396.00 1414.00 0
2003-08-14 Cement Squeeze 1396.00 1414.00 0
2003-08-18 Perforation 1396.00 1399.00 13
2003-08-18 Perforation 1402.00 1403.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1989 0.0 0.0 0.0
2004 2903 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-02-01 Lost Circulation 1416.00 1440.00

For data sources see[6]

References