X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040312002

Well Details

Well ID: 1166040312002
Loading map...
Location: 00/12-03-116-04W6/2
Location Alias: 00/12-03-16-04 W6M
Location Alias 2: 00/12-03-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 03
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 12-3-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0033328
License Date: 1967-12-21
License Status: Suspension
Spud Date: 1967-12-30
Final Drill Date: 1968-01-19
Well Total Depth: 1478.30 m
Surface Hole Latitude: 59.046066
Surface Hole Longitude: -118.596035

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-12-21 Obtained License
1968-01-14 Drill Stem Test Performed
1968-01-19 Finished Drilling
1968-01-19 Well Mode changed to Drilled and Cased
1968-01-21 Drill Stem Test Performed
1968-01-22 Drill Stem Test Performed
1968-01-23 Liner Casing Operation Performed
1968-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-01-29 Perforation Treatment Performed - Jet Perforation
1968-08-21 Perforation Treatment Performed - Cement Squeeze
1968-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-24 Perforation Treatment Performed - Jet Perforation
1968-08-24 Well Log Performed
1968-09-02 Well Log Performed
1968-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-12-09 Well Log Performed
1969-02-02 Perforation Treatment Performed - Cement Squeeze
1969-02-03 Well Log Performed
1969-02-04 Perforation Treatment Performed - Jet Perforation
1969-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-25 Perforation Treatment Performed - Open-Hole Completion
1974-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-18 Perforation Treatment Performed - Cement Squeeze
1986-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-19 Perforation Treatment Performed - Jet Perforation
1993-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-18 Well Log Performed
1996-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-19 Plug Back Performed
1996-10-19 Well Log Performed
1996-10-20 Perforation Treatment Performed - Jet Perforation
1996-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-23 Well Log Performed
1997-01-02 Well Began Production
1997-01-02 Well Fluid changed to Gas
1997-01-02 Well Mode changed to Flowing
1997-01-03 Well Fluid changed to Gas
1997-01-03 Well Mode changed to Flowing
1999-11-28 Well Log Performed
1999-11-30 Well Log Performed
1999-12-02 Perforation Treatment Performed - Cement Squeeze
1999-12-04 Perforation Treatment Performed - Jet Perforation
1999-12-04 Well Log Performed
1999-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-28 Well Log Performed
2004-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-04-30 Perforation Treatment Performed - Jet Perforation
2004-04-30 Plug Back Performed
2004-04-30 Well Fluid changed to Gas
2004-04-30 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-29 Perforation 1398.40 1401.50 10
1968-09-15 Acid Treatment 1398.10 1401.80 0
1969-02-02 Cement Squeeze 1398.10 1410.90 0
1969-02-04 Perforation 1409.10 1410.90 7
1969-02-08 Acid Treatment 1409.10 1410.90 0
1973-03-25 Open Hole/Barefoot Completion 1452.40 1478.30 0
1974-07-20 Acid Treatment 1452.40 1478.30 0
1986-06-18 Cement Squeeze 1409.10 1410.90 0
1986-06-19 Perforation 1398.50 1401.50 13
1986-06-19 Acid Treatment 1398.50 1401.50 0
1993-10-31 Acid Treatment 1398.50 1401.50 0
1968-01-29 Perforation 1408.20 1410.60 10
1996-10-19 Packing Device Capped w/Cement 1388.00 1396.00 0
1996-10-20 Perforation 1281.10 1282.00 13
1996-10-20 Perforation 1283.20 1284.40 13
1996-10-20 Perforation 1285.00 1289.90 13
1996-10-20 Perforation 1295.70 1297.50 13
1996-10-21 Acid Treatment 1281.10 1297.50 0
1999-12-02 Cement Squeeze 1281.10 1297.50 0
1999-12-04 Perforation 1281.60 1282.60 13
1999-12-04 Perforation 1283.20 1284.40 13
1999-12-05 Acid Treatment 1281.60 1284.40 0
1968-01-29 Perforation 1411.80 1413.70 10
2004-04-30 Packing Device Capped w/Cement 1267.00 1275.00 0
2004-04-30 Perforation 1231.40 1232.60 13
2004-04-30 Acid Treatment 1231.40 1232.60 0
1968-01-29 Acid Treatment 1398.40 1413.70 0
1968-08-21 Cement Squeeze 1398.40 1413.70 0
1968-08-24 Perforation 1398.10 1399.00 7
1968-08-24 Perforation 1399.60 1401.80 7
1968-08-24 Perforation 1406.70 1410.90 7
1968-08-24 Acid Treatment 1398.10 1410.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 5939 0.0 0.0 0.0
1999 1 0.0 0.0 0.0

For data sources see[5]

References