X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040701002

Well Details

Well ID: 1166040701002
Loading map...
Location: 00/01-07-116-04W6/2
Location Alias: 00/01-07-16-04 W6M
Location Alias 2: 00/01-07-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 1-7-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0034409
License Date: 1968-07-05
License Status: Suspension
Spud Date: 1968-07-08
Final Drill Date: 1968-07-21
Well Total Depth: 1480.40 m
Surface Hole Latitude: 59.054236
Surface Hole Longitude: -118.659216

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-07-05 Obtained License
1968-07-18 Liner Casing Operation Performed
1968-07-21 Finished Drilling
1968-07-21 Well Mode changed to Drilled and Cased
1968-07-22 Perforation Treatment Performed - Open-Hole Completion
1968-09-10 Perforation Treatment Performed - Cement Plug
1968-09-10 Perforation Treatment Performed - Open-Hole Completion
1970-05-13 Perforation Treatment Performed - Cement Plug
1970-05-13 Perforation Treatment Performed - Open-Hole Completion
1970-08-18 Perforation Treatment Performed - Jet Perforation
1970-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-06 Perforation Treatment Performed - Jet Perforation
1989-02-06 Well Log Performed
1989-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-25 Well Log Performed
2000-06-30 Well Log Performed
2001-09-11 Well Log Performed
2001-09-13 Perforation Treatment Performed - Cement Squeeze
2001-09-24 Perforation Treatment Performed - Jet Perforation
2001-09-24 Well Log Performed
2001-09-27 Well Log Performed
2001-09-28 Well Log Performed
2001-09-29 Perforation Treatment Performed - Jet Perforation
2001-09-29 Well Log Performed
2001-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-03 Perforation Treatment Performed - Jet Perforation
2001-10-03 Well Log Performed
2001-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-06 Plug Back Performed
2001-10-06 Well Log Performed
2001-10-09 Perforation Treatment Performed - Jet Perforation
2001-10-09 Well Log Performed
2001-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-13 Perforation Treatment Performed - Jet Perforation
2001-10-13 Well Log Performed
2001-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-26 Well Began Production
2002-02-26 Well Fluid changed to Gas
2002-02-26 Well Mode changed to Flowing
2002-09-13 Well Fluid changed to Gas
2002-09-13 Well Mode changed to Suspended
2003-03-19 Well Fluid changed to Gas
2003-03-19 Well Mode changed to Flowing
2003-07-13 Perforation Treatment Performed - Cement Squeeze
2003-07-13 Plug Back Performed
2003-07-13 Well Fluid changed to Gas
2003-07-13 Well Mode changed to Abandoned Zone
2003-07-16 Perforation Treatment Performed - Jet Perforation
2003-07-20 Well Log Performed
2003-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-07-22 Open Hole/Barefoot Completion 1406.70 1453.90 0
2001-09-13 Cement Squeeze 1413.70 1425.50 0
2001-09-24 Perforation 1436.20 1440.20 13
2001-09-29 Perforation 1413.00 1416.10 13
2001-10-01 Acid Treatment 1413.00 1416.10 0
2001-10-03 Perforation 1416.00 1418.50 13
2001-10-03 Acid Treatment 1413.00 1418.50 0
2001-10-06 Packing Device Capped w/Cement 1400.00 1408.00 0
2001-10-09 Perforation 1296.50 1297.50 13
2001-10-09 Perforation 1299.00 1300.00 13
2001-10-09 Perforation 1307.00 1309.00 13
1968-09-10 Cement Plug 1447.80 1453.90 0
2001-10-10 Acid Treatment 1296.50 1309.00 0
2001-10-13 Perforation 1241.00 1243.00 14
2001-10-13 Perforation 1248.00 1250.00 14
2001-10-14 Acid Treatment 1241.00 1250.00 0
2003-07-13 Cement Squeeze 1296.50 1309.00 0
2003-07-13 Cement Squeeze 1241.00 1250.00 0
2003-07-16 Perforation 1413.00 1418.50 13
2003-07-16 Perforation 1436.20 1440.20 13
2003-07-23 Acid Treatment 1413.00 1440.20 0
1968-09-10 Open Hole/Barefoot Completion 1406.70 1447.80 0
1970-05-13 Cement Plug 1433.20 1447.80 0
1970-05-13 Open Hole/Barefoot Completion 1406.70 1433.20 0
1970-08-18 Perforation 1419.50 1425.50 7
1970-08-19 Acid Treatment 1419.50 1425.50 0
1989-02-06 Perforation 1413.70 1417.90 13
1989-02-07 Acid Treatment 1406.70 1433.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 4586 0.0 0.0 0.0
2003 96 0.0 0.0 0.0

For data sources see[5]

References