X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166040713003

Well Details

Well ID: 1166040713003
Loading map...
Location: 00/13-07-116-04W6/3
Location Alias: 00/13-07-16-04 W6M
Location Alias 2: 00/13-07-116-04 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 13-7-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0031044
License Date: 1966-09-26
License Status: Suspension
Spud Date: 1966-09-29
Final Drill Date: 1966-11-13
Well Total Depth: 1612.10 m
Surface Hole Latitude: 59.064507
Surface Hole Longitude: -118.681043

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-26 Obtained License
1966-10-14 Drill Stem Test Performed
1966-10-18 Drill Stem Test Performed
1966-10-23 Drill Stem Test Performed
1966-11-13 Finished Drilling
1966-11-13 Well Mode changed to Drilled and Cased
1966-11-17 Production Casing Operation Performed
1966-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-19 Perforation Treatment Performed - Jet Perforation
1966-11-19 Well Log Performed
1966-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-21 Perforation Treatment Performed - Cement Squeeze
1966-11-21 Perforation Treatment Performed - Jet Perforation
1966-11-25 Perforation Treatment Performed - Cement Squeeze
1967-02-08 Perforation Treatment Performed - Jet Perforation
1967-02-09 Perforation Treatment Performed - Cement Squeeze
1970-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-05-09 Perforation Treatment Performed - Cement Squeeze
1970-05-10 Perforation Treatment Performed - Cement Squeeze
1970-05-10 Perforation Treatment Performed - Jet Perforation
1970-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-29 Perforation Treatment Performed - Jet Perforation
1986-07-29 Well Log Performed
1986-07-30 Perforation Treatment Performed - Jet Perforation
1986-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-31 Perforation Treatment Performed - Jet Perforation
1995-11-01 Perforation Treatment Performed - Cement Squeeze
1995-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-19 Well Log Performed
2000-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-20 Plug Back Performed
2000-02-21 Perforation Treatment Performed - Jet Perforation
2000-02-21 Well Log Performed
2000-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-22 Well Log Performed
2001-11-24 Well Log Performed
2002-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-12 Plug Back Performed
2002-01-12 Well Log Performed
2002-01-13 Perforation Treatment Performed - Jet Perforation
2002-01-13 Well Log Performed
2002-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-19 Well Began Production
2002-01-19 Well Fluid changed to Gas
2002-01-19 Well Mode changed to Flowing
2004-05-06 Perforation Treatment Performed - Jet Perforation
2004-05-16 Well Fluid changed to Gas
2004-05-16 Well Mode changed to Flowing
2004-12-01 Well Fluid changed to Gas
2004-12-01 Well Mode changed to Pumping
2010-01-15 Well Fluid changed to Gas
2010-01-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-11-19 Perforation 1505.10 1506.00 7
1967-02-08 Perforation 1447.80 1449.60 13
1967-02-09 Cement Squeeze 1447.80 1464.90 0
1970-05-09 Acid Treatment 1447.80 1464.90 0
1970-05-09 Cement Squeeze 1447.80 1464.90 0
1970-05-10 Cement Squeeze 1447.80 1464.90 0
1970-05-10 Perforation 1438.70 1444.80 13
1970-05-11 Acid Treatment 1438.70 1444.80 0
1986-07-29 Perforation 1436.50 1438.50 13
1986-07-29 Perforation 1434.50 1435.50 13
1986-07-30 Perforation 1434.50 1435.50 13
1966-11-19 Acid Treatment 1505.10 1506.00 0
1986-07-31 Acid Treatment 1434.50 1438.50 0
1995-10-31 Perforation 1432.50 1434.40 13
1995-11-01 Cement Squeeze 1436.50 1444.80 0
1995-11-02 Acid Treatment 1432.50 1435.50 0
2000-02-20 Packing Device Capped w/Cement 1422.00 1430.00 0
2000-02-21 Perforation 1313.00 1315.00 13
2000-02-21 Perforation 1319.00 1321.00 13
2000-02-22 Acid Treatment 1313.00 1321.00 0
2002-01-12 Packing Device Capped w/Cement 1302.00 1310.00 0
2002-01-13 Perforation 1256.40 1259.70 13
1966-11-21 Cement Squeeze 1505.10 1506.00 0
2002-01-13 Perforation 1262.80 1267.40 13
2002-01-14 Acid Treatment 1256.40 1267.40 0
2004-05-06 Perforation 1313.00 1315.00 13
2004-05-06 Perforation 1319.00 1321.00 13
1966-11-21 Perforation 1494.10 1495.00 13
1966-11-21 Acid Treatment 1494.10 1495.00 0
1966-11-25 Cement Squeeze 1494.10 1495.00 0
1967-02-08 Perforation 1463.00 1464.90 13
1967-02-08 Perforation 1457.90 1459.70 13
1967-02-08 Perforation 1451.50 1452.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5106 0.0 0.0 0.0
2003 2945 0.0 0.0 0.0
2004 7464 0.0 0.0 0.0
2005 8608 0.0 0.0 0.0
2006 8152 0.0 0.0 0.0
2007 2148 0.0 0.0 0.0

For data sources see[5]

References