X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166042301002

Well Details

Well ID: 1166042301002
Loading map...
Location: 00/01-23-116-04W6/2
Location Alias: 00/01-23-16-04 W6M
Location Alias 2: 00/01-23-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 23
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 1-23-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0034200
License Date: 1968-05-31
License Status: Abandoned
Spud Date: 1968-06-05
Final Drill Date: 1968-06-25
Well Total Depth: 1445.10 m
Surface Hole Latitude: 59.083609
Surface Hole Longitude: -118.545514

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-05-31 Obtained License
1968-06-13 Drill Stem Test Performed
1968-06-17 Drill Stem Test Performed
1968-06-18 Well Log Performed
1968-06-22 Drill Stem Test Performed
1968-06-25 Finished Drilling
1968-06-25 Well Mode changed to Drilled and Cased
1968-06-26 Drill Stem Test Performed
1968-06-27 Liner Casing Operation Performed
1968-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-19 Perforation Treatment Performed - Jet Perforation
1968-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-23 Perforation Treatment Performed - Jet Perforation
1990-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-04-06 Plug Back Performed
1990-04-06 Well Log Performed
2000-02-25 Perforation Treatment Performed - Jet Perforation
2000-02-25 Well Log Performed
2000-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-15 Well Began Production
2000-03-15 Well Fluid changed to Gas
2000-03-15 Well Mode changed to Flowing
2002-08-25 Perforation Treatment Performed - Jet Perforation
2002-08-25 Well Log Performed
2002-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-28 Well Fluid changed to Gas
2002-08-28 Well Mode changed to Suspended
2002-10-24 Well Fluid changed to Gas
2002-10-24 Well Mode changed to Flowing
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Pumping
2015-07-09 Well Fluid changed to Gas
2015-07-09 Well Mode changed to Suspended
2017-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-07 Plug Back Performed
2017-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-08 Perforation Treatment Performed - Jet Perforation
2017-03-08 Plug Back Performed
2017-03-08 Well Fluid changed to Gas
2017-03-08 Well Mode changed to Abandoned Zone
2017-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-09 Perforation Treatment Performed - Remedial Casing
2017-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-10 Perforation Treatment Performed - Jet Perforation
2017-03-10 Perforation Treatment Performed - Remedial Casing
2017-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-03-12 Perforation Treatment Performed - Jet Perforation
2017-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-13 Perforation Treatment Performed - Remedial Casing
2017-03-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-19 Perforation 1426.80 1427.70 7
2002-08-25 Perforation 1291.90 1293.60 14
2002-08-25 Perforation 1297.20 1299.70 14
2002-08-26 Acid Treatment 1285.00 1299.70 0
2017-03-06 Packing Device Capped w/Cement 1362.00 1370.00 0
2017-03-07 Packing Device Capped w/Cement 1272.00 1280.00 0
2017-03-08 Perforation 569.00 570.00 20
2017-03-08 Packing Device Capped w/Cement 1187.00 1195.00 0
2017-03-09 Remedial Casing Cementing 569.00 570.00 0
2017-03-09 Packing Device Capped w/Cement 558.50 566.50 0
2017-03-10 Packing Device Capped w/Cement 219.50 227.50 0
1968-10-19 Acid Treatment 1426.80 1427.70 0
2017-03-10 Perforation 230.00 231.00 20
2017-03-10 Remedial Casing Cementing 230.00 231.00 0
2017-03-12 Perforation 203.00 204.00 99
2017-03-12 Acid Treatment 203.00 204.00 0
2017-03-13 Remedial Casing Cementing 203.00 204.00 0
2017-03-13 Packing Device Capped w/Cement 192.00 200.00 0
1968-10-21 Packing Device Capped w/Cement 1420.40 1420.40 0
1968-10-23 Perforation 1405.40 1407.60 7
1968-10-23 Acid Treatment 1405.40 1407.60 0
1990-04-06 Packing Device Capped w/Cement 1382.00 1390.00 0
2000-02-25 Perforation 1202.80 1208.80 13
2000-02-27 Acid Treatment 1202.80 1208.80 0
2002-08-25 Perforation 1285.00 1286.70 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6812 0.0 0.0 0.0
2001 7978 0.0 0.0 0.0
2002 6949 0.0 0.0 0.0
2003 8464 0.0 0.0 0.0
2004 8514 0.0 0.0 0.0
2005 8665 0.0 0.0 0.0
2006 8334 0.0 0.0 0.0
2007 8712 0.0 0.0 0.0
2008 7590 0.0 0.0 0.0
2009 8257 0.0 0.0 0.0
2010 7120 0.0 0.0 0.0
2011 5955 0.0 0.0 0.0
2012 7433 0.0 0.0 0.0
2013 5190 0.0 0.0 0.0
2014 7254 0.0 0.0 0.0
2015 360 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References