X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166042502002

Well Details

Well ID: 1166042502002
Loading map...
Location: 00/02-25-116-04W6/2
Location Alias: 00/02-25-16-04 W6M
Location Alias 2: 00/02-25-116-04 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 25
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 2-25-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0034424
License Date: 1968-07-09
License Status: Suspension
Spud Date: 1968-07-21
Final Drill Date: 1968-08-06
Well Total Depth: 1487.10 m
Surface Hole Latitude: 59.098392
Surface Hole Longitude: -118.523867

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-07-09 Obtained License
1968-07-29 Well Log Performed
1968-07-30 Drill Stem Test Performed
1968-07-31 Drill Stem Test Performed
1968-08-06 Finished Drilling
1968-08-06 Well Mode changed to Drilled and Cased
1968-08-07 Drill Stem Test Performed
1968-08-07 Well Log Performed
1968-08-08 Drill Stem Test Performed
1968-08-10 Liner Casing Operation Performed
1968-08-15 Perforation Treatment Performed - Jet Perforation
1968-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-07-17 Perforation Treatment Performed - Visqueeze
1969-08-18 Perforation Treatment Performed - Visqueeze
1969-08-21 Perforation Treatment Performed - Jet Perforation
1973-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-17 Well Log Performed
1991-09-19 Perforation Treatment Performed - Cement Squeeze
1991-09-20 Perforation Treatment Performed - Jet Perforation
1991-09-20 Well Log Performed
1991-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-19 Plug Back Performed
2000-01-19 Well Log Performed
2000-01-20 Perforation Treatment Performed - Jet Perforation
2000-01-20 Well Log Performed
2000-01-20 Well Mode changed to Drilled and Cased
2000-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-13 Well Began Production
2000-02-13 Well Fluid changed to Gas
2000-02-13 Well Mode changed to Flowing
2001-06-11 Well Log Performed
2001-06-12 Perforation Treatment Performed - Jet Perforation
2001-06-12 Well Log Performed
2001-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-20 Well Fluid changed to Gas
2001-06-20 Well Mode changed to Suspended
2001-06-21 Well Fluid changed to Gas
2001-06-21 Well Mode changed to Suspended
2001-09-02 Well Fluid changed to Gas
2001-09-02 Well Mode changed to Flowing
2003-09-12 Well Structure changed to Commingled
2013-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-18 Plug Back Performed
2013-12-18 Well Log Performed
2013-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-19 Plug Back Performed
2013-12-19 Well Log Performed
2013-12-19 Well Mode changed to Abandoned Zone
2013-12-19 Well Structure changed to Commingled
2014-01-04 Perforation Treatment Performed - Jet Perforation
2014-01-04 Well Log Performed
2014-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-05 Perforation Treatment Performed - Remedial Casing
2014-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-06 Perforation Treatment Performed - Jet Perforation
2014-01-06 Perforation Treatment Performed - Remedial Casing
2014-01-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-08-15 Perforation 1422.80 1425.50 7
1991-09-20 Perforation 1407.60 1409.20 13
1991-09-20 Perforation 1399.90 1404.90 13
1991-09-20 Perforation 1397.00 1398.30 13
1991-09-21 Acid Treatment 1397.00 1411.30 0
2000-01-19 Packing Device Capped w/Cement 1387.00 1395.00 0
2000-01-20 Perforation 1284.70 1286.20 20
2000-01-20 Perforation 1287.20 1289.20 20
2000-01-23 Acid Treatment 1284.70 1289.20 0
2001-06-12 Perforation 1205.20 1208.20 13
2001-06-12 Perforation 1209.40 1211.60 13
1968-08-15 Perforation 1427.70 1428.90 7
2001-06-13 Acid Treatment 1205.20 1211.60 0
2013-12-18 Packing Device Capped w/Cement 1266.50 1275.00 0
2013-12-19 Packing Device Capped w/Cement 1191.50 1200.00 0
2014-01-04 Perforation 571.00 572.00 17
2014-01-05 Remedial Casing Cementing 571.00 572.00 0
2014-01-05 Packing Device Capped w/Cement 559.00 567.00 0
2014-01-06 Perforation 236.00 237.00 17
2014-01-06 Remedial Casing Cementing 236.00 237.00 0
2014-01-06 Packing Device Capped w/Cement 222.00 234.00 0
1968-08-16 Acid Treatment 1422.80 1428.90 0
1969-07-17 Visqueeze 1422.80 1428.90 0
1969-08-18 Visqueeze 1422.80 1428.90 0
1969-08-21 Perforation 1415.20 1417.00 7
1973-05-22 Acid Treatment 1415.20 1428.90 0
1991-09-19 Cement Squeeze 1415.20 1417.00 0
1991-09-20 Perforation 1410.40 1411.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 7693 0.0 0.0 0.0
2001 5673 0.0 0.0 0.0
2002 4237 0.0 0.0 0.0
2003 2120 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References