X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166042710000

Well Details

Well ID: 1166042710000
Loading map...
Location: 00/10-27-116-04W6/0
Location Alias: 00/10-27-16-04 W6M
Location Alias 2: 00/10-27-116-04 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 27
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-27-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0032017
License Date: 1967-04-07
License Status: Issued
Spud Date: 1967-04-07
Final Drill Date: 1967-05-06
Well Total Depth: 1472.20 m
Surface Hole Latitude: 59.105660
Surface Hole Longitude: -118.580494

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-04-07 Obtained License
1967-05-05 Drill Stem Test Performed
1967-05-06 Finished Drilling
1967-05-06 Well Mode changed to Drilled and Cased
1967-05-08 Drill Stem Test Performed
1967-05-09 Drill Stem Test Performed
1967-05-10 Liner Casing Operation Performed
1967-05-13 Perforation Treatment Performed - Jet Perforation
1967-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-05-14 Well Began Production
1967-05-14 Well Fluid changed to Crude Oil
1967-05-14 Well Mode changed to Flowing
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1986-08-19 Well Fluid changed to Crude Oil
1986-08-19 Well Mode changed to Suspended
1988-03-19 Well Log Performed
1988-09-21 Perforation Treatment Performed - Cement Squeeze
1988-09-25 Well Log Performed
1988-09-26 Perforation Treatment Performed - Jet Perforation
1988-09-26 Well Log Performed
1988-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-30 Well Log Performed
1988-11-21 Well Began Injection
1988-11-21 Well Fluid changed to Water
1988-11-21 Well Type changed to Injection
1994-12-15 Perforation Treatment Performed - Jet Perforation
1994-12-15 Well Fluid changed to Water
1994-12-15 Well Type changed to Injection
1996-06-01 Well Fluid changed to Water
1996-06-01 Well Mode changed to Suspended
1996-06-01 Well Type changed to Injection
1997-01-20 Well Log Performed
1997-01-21 Perforation Treatment Performed - Jet Perforation
1997-01-21 Well Log Performed
1997-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-25 Well Fluid changed to Water
1997-03-25 Well Mode changed to Suspended
1997-03-25 Well Type changed to Injection
2004-02-24 Perforation Treatment Performed - Cement Squeeze
2004-02-24 Plug Back Performed
2004-02-28 Perforation Treatment Performed - Cement Squeeze
2004-02-28 Plug Back Performed
2004-03-04 Well Log Performed
2004-03-07 Well Log Performed
2004-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-20 Well Log Performed
2005-01-05 Well Fluid changed to Water
2005-01-05 Well Type changed to Injection
2008-06-08 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-05-13 Perforation 1419.80 1425.90 7
1997-01-21 Perforation 1235.00 1239.60 13
1997-01-21 Perforation 1229.60 1231.40 13
1997-01-21 Perforation 1232.20 1233.50 13
1997-01-21 Perforation 1243.00 1244.00 13
1997-01-22 Acid Treatment 1229.60 1231.40 0
2004-02-24 Cement Squeeze 1229.60 1244.00 0
2004-02-28 Cement Squeeze 1294.50 1305.80 0
2004-03-08 Acid Treatment 1408.20 1471.20 0
2008-06-08 Chemical Squeeze 1458.50 1471.20 0
1967-05-14 Acid Treatment 1419.80 1425.90 0
1988-09-21 Cement Squeeze 1419.80 1425.90 0
1988-09-26 Perforation 1408.20 1411.20 8
1988-09-26 Perforation 1419.80 1425.90 8
1988-09-26 Perforation 1458.50 1471.20 8
1988-09-27 Acid Treatment 1408.20 1471.20 0
1994-12-15 Perforation 1294.50 1298.60 18
1994-12-15 Perforation 1304.50 1305.80 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 5101 0.0 0.0 0.0
1969 3123 0.0 0.0 0.0
1970 2571 0.0 0.0 0.0
1971 3046 0.0 0.0 0.0
1972 4167 0.0 0.0 0.0
1973 7985 0.0 0.0 0.0
1974 6798 0.0 0.0 0.0
1975 4182 0.0 0.0 0.0
1976 4855 0.0 0.0 0.0
1977 5313 0.0 0.0 0.0
1978 6291 0.0 0.0 0.0
1979 7738 0.0 0.0 0.0
1980 5448 0.0 0.0 0.0
1981 5855 0.0 0.0 0.0
1982 7718 0.0 0.0 0.0
1983 8486 0.0 0.0 0.0
1984 4402 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References