X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166043301003

Well Details

Well ID: 1166043301003
Loading map...
Location: 00/01-33-116-04W6/3
Location Alias: 00/01-33-16-04 W6M
Location Alias 2: 00/01-33-116-04 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 04
Section: 33
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 1-33-116-4
Operator Name: Paramount Resources Ltd.
License Number: 0091879
License Date: 1981-08-25
License Status: Abandoned
Spud Date: 1981-09-04
Final Drill Date: 1981-09-26
Well Total Depth: 1650.00 m
Surface Hole Latitude: 59.112149
Surface Hole Longitude: -118.600186

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-08-25 Obtained License
1981-09-04 Direction Drilling Operation Performed - 98
1981-09-26 Finished Drilling
1981-09-26 Well Mode changed to Drilled and Cased
1981-09-29 Well Log Performed
1981-10-03 Production Casing Operation Performed
1982-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-18 Perforation Treatment Performed - Jet Perforation
1982-11-21 Perforation Treatment Performed - Cement Squeeze
1982-11-21 Perforation Treatment Performed - Jet Perforation
1982-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-26 Perforation Treatment Performed - Cement Squeeze
1982-11-26 Perforation Treatment Performed - Jet Perforation
1982-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-13 Perforation Treatment Performed - Jet Perforation
1983-10-13 Well Log Performed
1987-11-21 Perforation Treatment Performed - Jet Perforation
1997-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-10 Plug Back Performed
1997-01-11 Perforation Treatment Performed - Jet Perforation
1997-01-11 Well Log Performed
1997-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-25 Perforation Treatment Performed - Jet Perforation
1999-11-25 Well Log Performed
1999-12-17 Well Began Production
1999-12-17 Well Fluid changed to Gas
1999-12-17 Well Mode changed to Flowing
1999-12-18 Well Fluid changed to Gas
1999-12-18 Well Mode changed to Flowing
2009-11-09 Well Log Performed
2009-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-10 Plug Back Performed
2009-11-10 Well Fluid changed to Gas
2009-11-10 Well Log Performed
2009-11-10 Well Mode changed to Abandoned Zone
2009-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-11 Plug Back Performed
2009-11-11 Well Log Performed
2009-11-12 Well Log Performed
2009-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-13 Perforation Treatment Performed - Jet Perforation
2009-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-14 Perforation Treatment Performed - Remedial Casing
2009-11-15 Perforation Treatment Performed - Jet Perforation
2009-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-16 Perforation Treatment Performed - Remedial Casing
2009-11-17 Well Log Performed
2009-11-18 Perforation Treatment Performed - Jet Perforation
2009-11-19 Perforation Treatment Performed - Remedial Casing
2009-11-28 Well Abandoned
2009-11-28 Well Fluid changed to Gas
2009-11-28 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1981-09-04 597.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-18 Perforation 1529.00 1535.00 13
1982-12-03 Acid Treatment 1508.00 1517.00 0
1983-08-15 Acid Treatment 1508.00 1517.00 0
1983-10-13 Perforation 1486.00 1490.00 13
1983-10-13 Perforation 1495.00 1500.00 13
1987-11-21 Perforation 1463.00 1465.00 13
1987-11-21 Perforation 1467.00 1469.00 13
1997-01-10 Packing Device Capped w/Cement 1452.00 1460.00 0
1997-01-11 Perforation 1280.00 1281.00 13
1997-01-11 Perforation 1282.00 1285.00 13
1997-01-11 Perforation 1289.50 1291.50 13
1982-11-18 Acid Treatment 1529.00 1535.00 0
1997-01-12 Acid Treatment 1280.00 1291.50 0
1999-11-25 Perforation 1338.00 1339.00 13
1999-11-25 Perforation 1341.00 1344.00 13
1999-11-25 Perforation 1349.50 1355.50 13
2009-11-10 Packing Device Capped w/Cement 1322.00 1330.00 0
2009-11-11 Packing Device Capped w/Cement 1267.00 1275.00 0
2009-11-13 Perforation 599.50 600.50 17
2009-11-13 Acid Treatment 599.50 600.50 0
2009-11-14 Packing Device Capped w/Cement 587.00 597.00 0
2009-11-14 Remedial Casing Cementing 599.50 600.50 0
1982-11-21 Perforation 1547.00 1549.00 13
2009-11-15 Perforation 398.00 399.00 17
2009-11-16 Acid Treatment 398.00 399.00 0
2009-11-16 Remedial Casing Cementing 398.00 399.00 0
2009-11-18 Perforation 335.00 336.00 13
2009-11-19 Remedial Casing Cementing 335.00 336.00 0
1982-11-21 Cement Squeeze 1547.00 1549.00 0
1982-11-25 Acid Treatment 1529.00 1535.00 0
1982-11-26 Cement Squeeze 1529.00 1535.00 0
1982-11-26 Perforation 1508.00 1517.00 14
1982-11-28 Acid Treatment 1508.00 1517.00 0
1982-11-30 Acid Treatment 1508.00 1517.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 349 0.0 0.0 0.0
2000 3249 0.0 0.0 0.0

For data sources see[6]

References