If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166050804002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.055671,"lon":-118.824095,"icon":""}]} |
| Location: 00/04-08-116-05W6/2 | |
| Location Alias: 00/04-08-16-05 W6M | |
| Location Alias 2: 00/04-08-116-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 08 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 4-8-116-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0297933 | |
| License Date: 2003-12-05 | |
| License Status: Abandoned | |
| Spud Date: 2003-12-03 | |
| Final Drill Date: 2003-12-09 | |
| Well Total Depth: 1559.40 m | |
| Surface Hole Latitude: 59.055671 | |
| Surface Hole Longitude: -118.824095 |
| Date | Event |
|---|---|
| 2003-12-05 | Obtained License |
| 2003-12-09 | Finished Drilling |
| 2003-12-09 | Perforation Treatment Performed - Open-Hole Completion |
| 2003-12-09 | Well Mode changed to Drilled and Cased |
| 2003-12-21 | Rig Released |
| 2003-12-24 | Well Began Production |
| 2003-12-24 | Well Fluid changed to Crude Oil |
| 2003-12-24 | Well Mode changed to Flowing |
| 2011-06-01 | Well Fluid changed to Crude Oil |
| 2011-06-01 | Well Mode changed to Suspended |
| 2011-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-06-12 | Plug Back Performed |
| 2011-06-13 | Well Log Performed |
| 2011-06-14 | Well Log Performed |
| 2011-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-06-15 | Perforation Treatment Performed - Jet Perforation |
| 2011-06-15 | Well Log Performed |
| 2011-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-06-16 | Perforation Treatment Performed - Jet Perforation |
| 2011-06-16 | Perforation Treatment Performed - Remedial Casing |
| 2011-06-16 | Well Log Performed |
| 2011-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-06-17 | Perforation Treatment Performed - Jet Perforation |
| 2011-06-17 | Perforation Treatment Performed - Remedial Casing |
| 2011-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-06-18 | Perforation Treatment Performed - Remedial Casing |
| 2011-06-18 | Well Log Performed |
| 2011-06-19 | Perforation Treatment Performed - Jet Perforation |
| 2011-06-20 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
| 2011-06-20 | Perforation Treatment Performed - Remedial Casing |
| 2011-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-06-21 | Perforation Treatment Performed - Jet Perforation |
| 2011-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-06-22 | Perforation Treatment Performed - Remedial Casing |
| 2011-06-22 | Well Fluid changed to Crude Oil |
| 2011-06-22 | Well Mode changed to Abandoned Zone |
| 2011-07-08 | Well Abandoned |
| 2011-07-08 | Well Fluid changed to Crude Oil |
| 2011-07-08 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-12-09 | Open Hole/Barefoot Completion | 1477.70 | 1559.40 | 0 |
| 2011-06-17 | Remedial Casing Cementing | 306.00 | 307.00 | 0 |
| 2011-06-17 | Packing Device Capped w/Cement | 293.00 | 303.00 | 0 |
| 2011-06-17 | Packing Device Capped w/Cement | 266.00 | 274.00 | 0 |
| 2011-06-17 | Perforation | 262.00 | 263.00 | 17 |
| 2011-06-18 | Acid Treatment | 262.00 | 263.00 | 0 |
| 2011-06-18 | Remedial Casing Cementing | 262.00 | 263.00 | 0 |
| 2011-06-18 | Packing Device Capped w/Cement | 245.00 | 254.00 | 0 |
| 2011-06-19 | Perforation | 226.00 | 227.00 | 17 |
| 2011-06-20 | Remedial Casing Cementing | 226.00 | 227.00 | 0 |
| 2011-06-20 | Packing Dev Cpd w/Res-Gyp Cem | 221.00 | 224.00 | 0 |
| 2011-06-12 | Packing Device Capped w/Cement | 1424.10 | 1528.00 | 0 |
| 2011-06-21 | Perforation | 203.00 | 204.00 | 99 |
| 2011-06-21 | Acid Treatment | 203.00 | 204.00 | 0 |
| 2011-06-22 | Remedial Casing Cementing | 203.00 | 204.00 | 0 |
| 2011-06-22 | Packing Device Capped w/Cement | 192.00 | 201.00 | 0 |
| 2011-06-15 | Packing Device Capped w/Cement | 747.00 | 755.00 | 0 |
| 2011-06-15 | Packing Device Capped w/Cement | 687.00 | 695.00 | 0 |
| 2011-06-15 | Perforation | 652.00 | 653.00 | 17 |
| 2011-06-16 | Remedial Casing Cementing | 652.00 | 653.00 | 0 |
| 2011-06-16 | Packing Device Capped w/Cement | 630.00 | 640.00 | 0 |
| 2011-06-16 | Perforation | 306.00 | 307.00 | 17 |
| 2011-06-17 | Acid Treatment | 306.00 | 307.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 184 | 0.0 | 0.0 | 0.0 |
| 2004 | 7725 | 0.0 | 0.0 | 0.0 |
| 2005 | 8652 | 0.0 | 0.0 | 0.0 |
| 2006 | 7297 | 0.0 | 0.0 | 0.0 |
| 2007 | 6841 | 0.0 | 0.0 | 0.0 |
| 2008 | 8724 | 0.0 | 0.0 | 0.0 |
| 2009 | 1215 | 0.0 | 0.0 | 0.0 |
For data sources see[5]