X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166051101000

Well Details

Well ID: 1166051101000
Loading map...
Location: 00/01-11-116-05W6/0
Location Alias: 00/01-11-16-05 W6M
Location Alias 2: 00/01-11-116-05 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 05
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 1-11-116-5
Operator Name: Paramount Resources Ltd.
License Number: 0392387
License Date: 2008-01-21
License Status: Abandoned
Spud Date: 2008-02-27
Final Drill Date: 2008-03-08
Well Total Depth: 1650.00 m
Surface Hole Latitude: 59.055655
Surface Hole Longitude: -118.718499

For data sources see[1][2]

Well History

Date Event
2008-01-21 Obtained License
2008-03-02 Surface Casing Operation Performed
2008-03-08 Finished Drilling
2008-03-08 Well Log Performed
2008-03-08 Well Mode changed to Drilled and Cased
2008-03-10 Production Casing Operation Performed
2008-03-10 Well Log Performed
2008-03-11 Rig Released
2008-03-18 Well Log Performed
2008-03-19 Perforation Treatment Performed - Jet Perforation
2008-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-04-01 Well Began Production
2008-04-01 Well Fluid changed to Crude Oil
2008-04-01 Well Mode changed to Pumping
2008-09-08 Perforation Treatment Performed - Chemical Squeeze
2009-12-01 Well Fluid changed to Crude Oil
2009-12-01 Well Mode changed to Suspended
2011-01-24 Well Log Performed
2011-01-25 Well Log Performed
2011-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-26 Plug Back Performed
2011-01-26 Well Fluid changed to Crude Oil
2011-01-26 Well Log Performed
2011-01-26 Well Mode changed to Abandoned Zone
2011-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-27 Plug Back Performed
2011-01-27 Well Log Performed
2011-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-28 Perforation Treatment Performed - Jet Perforation
2011-01-30 Perforation Treatment Performed - Remedial Casing
2011-01-31 Well Log Performed
2011-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-01 Perforation Treatment Performed - Jet Perforation
2011-02-03 Perforation Treatment Performed - Remedial Casing
2011-02-04 Perforation Treatment Performed - Jet Perforation
2011-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-05 Perforation Treatment Performed - Remedial Casing
2011-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-08 Perforation Treatment Performed - Jet Perforation
2011-02-09 Perforation Treatment Performed - Remedial Casing
2011-02-09 Well Log Performed
2011-02-10 Perforation Treatment Performed - Jet Perforation
2011-02-13 Perforation Treatment Performed - Remedial Casing
2011-02-23 Well Log Performed
2011-02-24 Well Log Performed
2011-02-25 Perforation Treatment Performed - Jet Perforation
2011-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-27 Perforation Treatment Performed - Remedial Casing
2011-02-28 Well Log Performed
2011-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-01 Perforation Treatment Performed - Jet Perforation
2011-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-02 Perforation Treatment Performed - Remedial Casing
2011-05-27 Well Abandoned
2011-05-27 Well Fluid changed to Crude Oil
2011-05-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-03-19 Perforation 1560.00 1578.00 13
2011-01-28 Acid Treatment 359.00 360.00 0
2011-01-30 Remedial Casing Cementing 359.00 360.00 0
2011-02-01 Perforation 271.00 272.00 99
2011-02-01 Acid Treatment 271.00 272.00 0
2011-02-03 Remedial Casing Cementing 271.00 272.00 0
2011-02-04 Perforation 259.00 260.00 99
2011-02-05 Acid Treatment 259.00 260.00 0
2011-02-05 Remedial Casing Cementing 259.00 260.00 0
2011-02-08 Acid Treatment 236.00 237.00 0
2011-02-08 Perforation 236.00 237.00 99
2008-03-19 Perforation 1523.00 1528.00 13
2011-02-09 Remedial Casing Cementing 236.00 237.00 0
2011-02-10 Perforation 213.00 214.00 99
2011-02-13 Remedial Casing Cementing 213.00 214.00 0
2011-02-25 Perforation 276.00 277.00 99
2011-02-26 Acid Treatment 276.00 277.00 0
2011-02-27 Remedial Casing Cementing 276.00 277.00 0
2011-03-01 Perforation 197.00 198.00 99
2011-03-01 Acid Treatment 197.00 198.00 0
2011-03-02 Remedial Casing Cementing 197.00 198.00 0
2011-03-02 Packing Device Capped w/Cement 187.00 195.00 0
2008-03-20 Acid Treatment 1560.00 1578.00 0
2008-03-20 Acid Treatment 1523.00 1528.00 0
2008-09-08 Chemical Squeeze 1560.00 1578.00 0
2008-09-08 Chemical Squeeze 1523.00 1528.00 0
2011-01-26 Packing Device Capped w/Cement 1546.00 1554.00 0
2011-01-27 Packing Device Capped w/Cement 1509.00 1517.00 0
2011-01-28 Perforation 359.00 360.00 99

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 6290 0.0 0.0 0.0
2009 444 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-05-27 No Incident Encountered 0.00 0.00
2011-05-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References