X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166052012002

Well Details

Well ID: 1166052012002
Loading map...
Location: 00/12-20-116-05W6/2
Location Alias: 00/12-20-16-05 W6M
Location Alias 2: 00/12-20-116-05 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 05
Section: 20
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 12-20-116-5
Operator Name: Paramount Resources Ltd.
License Number: 0031438
License Date: 1966-12-13
License Status: Suspension
Spud Date: 1966-12-17
Final Drill Date: 1967-01-26
Well Total Depth: 1671.80 m
Surface Hole Latitude: 59.089793
Surface Hole Longitude: -118.822349

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-13 Obtained License
1966-12-30 Drill Stem Test Performed
1966-12-31 Drill Stem Test Performed
1967-01-03 Drill Stem Test Performed
1967-01-06 Well Log Performed
1967-01-13 Drill Stem Test Performed
1967-01-15 Drill Stem Test Performed
1967-01-17 Drill Stem Test Performed
1967-01-18 Drill Stem Test Performed
1967-01-20 Drill Stem Test Performed
1967-01-26 Finished Drilling
1967-01-26 Well Log Performed
1967-01-26 Well Mode changed to Drilled and Cased
1967-01-27 Liner Casing Operation Performed
1967-02-02 Perforation Treatment Performed - Jet Perforation
1967-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-02-09 Perforation Treatment Performed - Jet Perforation
1967-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-10 Perforation Treatment Performed - Jet Perforation
1967-09-20 Well Log Performed
1967-09-21 Perforation Treatment Performed - Jet Perforation
1967-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-24 Well Log Performed
1984-02-26 Perforation Treatment Performed - Cement Squeeze
1984-03-01 Perforation Treatment Performed - Jet Perforation
1984-03-02 Perforation Treatment Performed - Jet Perforation
1984-03-02 Well Log Performed
1984-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-23 Perforation Treatment Performed - Jet Perforation
1988-03-23 Well Log Performed
1990-11-04 Well Log Performed
1990-11-05 Perforation Treatment Performed - Jet Perforation
1990-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-08 Well Log Performed
2000-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-09 Perforation Treatment Performed - Jet Perforation
2000-03-09 Plug Back Performed
2000-03-09 Well Log Performed
2000-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-05-07 Well Began Production
2000-05-07 Well Fluid changed to Gas
2000-05-07 Well Mode changed to Flowing
2010-04-12 Well Fluid changed to Gas
2010-04-12 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-02 Perforation 1579.20 1579.50 13
1967-09-21 Perforation 1551.70 1555.40 13
1967-09-22 Acid Treatment 1540.50 1555.40 0
1984-02-26 Cement Squeeze 1501.40 1555.40 0
1984-03-01 Perforation 1579.20 1579.50 13
1984-03-02 Perforation 1585.00 1588.00 13
1984-03-02 Perforation 1591.00 1598.50 13
1984-03-02 Perforation 1600.00 1604.00 13
1984-03-03 Acid Treatment 1579.20 1604.00 0
1988-03-23 Perforation 1500.00 1503.40 13
1988-03-23 Perforation 1506.10 1508.40 13
1967-02-04 Acid Treatment 1579.20 1579.50 0
1990-11-05 Perforation 1491.70 1494.70 13
1990-11-05 Perforation 1496.00 1503.60 13
1990-11-07 Acid Treatment 1491.70 1492.70 0
1990-11-09 Acid Treatment 1491.70 1503.40 0
2000-03-09 Packing Device Capped w/Cement 1482.00 1490.00 0
2000-03-09 Perforation 1306.00 1307.50 13
2000-03-09 Perforation 1308.50 1313.00 13
2000-03-09 Perforation 1318.50 1321.50 13
2000-03-09 Perforation 1327.70 1328.70 13
2000-03-09 Perforation 1330.00 1331.50 13
1967-02-07 Packing Device Capped w/Cement 1567.60 1574.30 13
2000-03-10 Acid Treatment 1306.00 1331.50 0
1967-02-09 Perforation 1501.40 1504.50 13
1967-02-10 Perforation 1505.70 1507.20 13
1967-02-10 Perforation 1513.90 1518.50 13
1967-02-10 Acid Treatment 1501.40 1518.50 0
1967-09-21 Perforation 1540.50 1542.90 13
1967-09-21 Perforation 1544.40 1545.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5667 0.0 0.0 0.0
2001 5970 0.0 0.0 0.0
2002 1112 0.0 0.0 0.0

For data sources see[5]

References