X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166060104003

Well Details

Well ID: 1166060104003
Loading map...
Location: 00/04-01-116-06W6/3
Location Alias: 00/04-01-16-06 W6M
Location Alias 2: 00/04-01-116-06 W6/03
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 01
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 4-1-116-6
Operator Name: Paramount Resources Ltd.
License Number: 0031894
License Date: 1967-03-01
License Status: Issued
Spud Date: 1967-03-01
Final Drill Date: 1967-04-07
Well Total Depth: 1618.50 m
Surface Hole Latitude: 59.040986
Surface Hole Longitude: -118.876859

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-03-01 Obtained License
1967-03-20 Drill Stem Test Performed
1967-03-23 Drill Stem Test Performed
1967-03-24 Well Log Performed
1967-04-03 Drill Stem Test Performed
1967-04-04 Drill Stem Test Performed
1967-04-05 Drill Stem Test Performed
1967-04-06 Drill Stem Test Performed
1967-04-07 Finished Drilling
1967-04-07 Well Log Performed
1967-04-07 Well Mode changed to Drilled and Cased
1967-04-08 Liner Casing Operation Performed
1967-04-10 Well Log Performed
1967-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-11 Perforation Treatment Performed - Acid Wash - No Pressure
1967-04-11 Perforation Treatment Performed - Jet Perforation
1967-04-13 Perforation Treatment Performed - Cement Squeeze
1967-04-14 Perforation Treatment Performed - Jet Perforation
1969-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-24 Perforation Treatment Performed - Jet Perforation
1970-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-10-04 Well Log Performed
1990-10-07 Well Log Performed
1990-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-08 Plug Back Performed
2001-05-19 Well Log Performed
2001-05-20 Perforation Treatment Performed - Jet Perforation
2001-05-20 Well Log Performed
2001-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-11 Well Began Production
2001-06-11 Well Fluid changed to Gas
2001-06-11 Well Mode changed to Flowing
2002-12-02 Well Log Performed
2002-12-04 Perforation Treatment Performed - Cement Squeeze
2002-12-04 Plug Back Performed
2002-12-04 Well Fluid changed to Gas
2002-12-04 Well Mode changed to Abandoned Zone
2002-12-11 Perforation Treatment Performed - Jet Perforation
2002-12-12 Well Log Performed
2002-12-13 Perforation Treatment Performed - Cement Squeeze
2002-12-13 Plug Back Performed
2002-12-21 Well Log Performed
2003-01-02 Perforation Treatment Performed - Jet Perforation
2003-01-04 Well Log Performed
2003-01-06 Well Log Performed
2003-01-14 Well Log Performed
2004-12-19 Well Log Performed
2004-12-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-30 Plug Back Performed
2004-12-30 Well Log Performed
2005-01-03 Perforation Treatment Performed - Jet Perforation
2005-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-04-02 Well Log Performed
2010-04-05 Production Casing Operation Performed
2010-04-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-04-11 Perforation 1551.40 1556.30 13
1967-04-14 Perforation 1518.50 1519.10 7
1967-04-14 Perforation 1519.70 1520.60 10
1969-09-24 Perforation 1592.30 1599.00 7
1969-09-24 Perforation 1600.80 1604.80 7
1969-09-24 Acid Treatment 1592.30 1604.80 0
1970-03-11 Acid Treatment 1592.30 1604.80 0
1985-10-04 Packing Device Capped w/Cement 1531.60 1535.00 0
1990-10-08 Packing Device Capped w/Cement 1467.00 1475.00 0
2001-05-20 Perforation 1330.80 1333.80 13
2001-05-20 Perforation 1322.20 1324.70 13
1967-04-11 Acid Wash 1551.40 1556.30 0
2001-05-20 Perforation 1315.50 1317.00 13
2001-05-20 Perforation 1306.40 1308.20 13
2001-05-20 Perforation 1294.20 1300.30 13
2001-05-21 Acid Treatment 1294.20 1333.80 0
2002-12-04 Cement Squeeze 1294.20 1333.80 0
2002-12-11 Perforation 1498.40 1499.60 7
2002-12-11 Perforation 1503.30 1503.90 7
2002-12-11 Perforation 1509.10 1510.00 10
2002-12-11 Perforation 1511.80 1512.40 7
2002-12-11 Perforation 1513.90 1514.60 7
1967-04-11 Acid Treatment 1551.40 1556.30 0
2002-12-11 Perforation 1518.50 1519.10 7
2002-12-11 Perforation 1519.70 1520.60 10
2002-12-13 Cement Squeeze 1498.40 1520.60 0
2003-01-02 Perforation 1592.30 1599.00 7
2003-01-02 Perforation 1600.80 1604.80 7
2004-12-30 Packing Device Capped w/Cement 1514.70 1523.10 0
2005-01-03 Perforation 1505.70 1508.70 13
2005-01-06 Acid Treatment 1505.70 1508.70 0
1967-04-13 Cement Squeeze 1551.40 1556.30 0
1967-04-14 Perforation 1498.40 1499.60 13
1967-04-14 Perforation 1503.30 1503.90 7
1967-04-14 Perforation 1509.10 1510.00 10
1967-04-14 Perforation 1511.80 1512.40 7
1967-04-14 Perforation 1513.90 1514.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4026 0.0 0.0 0.0

For data sources see[5]

References