X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166060610000

Well Details

Well ID: 1166060610000
Loading map...
Location: 00/10-06-116-06W6/0
Location Alias: 00/10-06-16-06 W6M
Location Alias 2: 00/10-06-116-06 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 06
County/Municipality: Mackenzie County
Well Name: ACL AMBER 10-6-116-6
Operator Name: Paramount Resources Ltd.
License Number: 0155883
License Date: 1993-01-22
License Status: Suspension
Spud Date: 1994-12-31
Final Drill Date: 1995-01-12
Well Total Depth: 1588.00 m
Surface Hole Latitude: 59.045731
Surface Hole Longitude: -119.005215

For data sources see[1][2]

Well History

Date Event
1993-01-22 Obtained License
1994-12-31 Lost Circulation Occurred
1995-01-02 Surface Casing Operation Performed
1995-01-07 Lost Circulation Occurred
1995-01-08 Well Log Performed
1995-01-09 Intermediate Casing Operation Performed
1995-01-11 Lost Circulation Occurred
1995-01-12 Finished Drilling
1995-01-12 Well Mode changed to Drilled and Cased
1995-01-13 Perforation Treatment Performed - Open-Hole Completion
1995-01-13 Rig Released
1995-01-19 Well Log Performed
1995-01-20 Liner Casing Operation Performed
1995-01-20 Perforation Treatment Performed - Cement Squeeze
1995-01-23 Well Log Performed
1995-01-24 Perforation Treatment Performed - Jet Perforation
1995-01-25 Perforation Treatment Performed - Cement Squeeze
1995-01-25 Perforation Treatment Performed - Jet Perforation
1995-01-25 Well Log Performed
1995-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-15 Well Began Production
1995-04-15 Well Fluid changed to Crude Oil
1995-04-15 Well Mode changed to Flowing
2003-07-20 Well Log Performed
2003-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-07-22 Perforation Treatment Performed - Jet Perforation
2005-01-04 Well Log Performed
2007-02-14 Perforation Treatment Performed - Cement Squeeze
2007-02-16 Perforation Treatment Performed - Jet Perforation
2007-02-17 Well Log Performed
2007-02-19 Perforation Treatment Performed - Jet Perforation
2007-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-02-21 Well Log Performed
2007-10-24 Well Began Injection
2007-10-24 Well Fluid changed to Water
2007-10-24 Well Type changed to Disposal
2013-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-31 Well Fluid changed to Water
2019-08-31 Well Mode changed to Suspended
2019-08-31 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-13 Open Hole/Barefoot Completion 1472.00 1588.00 0
2007-02-14 Cement Squeeze 1550.00 1553.00 0
2007-02-16 Perforation 1565.00 1567.00 13
2007-02-19 Perforation 1572.00 1578.00 14
2007-02-20 Acid Treatment 1565.00 1578.00 0
2013-08-24 Acid Treatment 1565.00 1578.00 0
1995-01-20 Cement Squeeze 1472.00 1588.00 0
1995-01-24 Perforation 1586.00 1586.30 13
1995-01-25 Cement Squeeze 1586.00 1586.30 0
1995-01-25 Perforation 1565.00 1567.00 13
1995-01-26 Acid Treatment 1565.00 1567.00 0
2003-07-21 Packing Device Capped w/Cement 1556.00 1560.00 0
2003-07-22 Perforation 1550.00 1553.00 13
2003-07-22 Acid Treatment 1550.00 1553.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 2821 0.0 0.0 0.0
1996 1058 0.0 0.0 0.0
1997 1361 0.0 0.0 0.0
1998 2407 0.0 0.0 0.0
2004 836 0.0 0.0 0.0
2005 1229 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-12-31 Lost Circulation 214.00 214.00
1995-01-07 Lost Circulation 1431.00 1445.00
1995-01-11 Lost Circulation 1573.00 1588.00
2013-08-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References