X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166060802002

Well Details

Well ID: 1166060802002
Loading map...
Location: 00/02-08-116-06W6/2
Location Alias: 00/02-08-16-06 W6M
Location Alias 2: 00/02-08-116-06 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 08
County/Municipality: Mackenzie County
Well Name: PPRL ET AL KR ZAMA 2-8-116-6
Operator Name: Paramount Resources Ltd.
License Number: 0033877
License Date: 1968-03-14
License Status: Abandoned
Spud Date: 1968-06-01
Final Drill Date: 1968-07-11
Well Total Depth: 1595.30 m
Surface Hole Latitude: 59.056263
Surface Hole Longitude: -118.974314

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-03-14 Obtained License
1968-07-06 Drill Stem Test Performed
1968-07-07 Drill Stem Test Performed
1968-07-09 Production Casing Operation Performed
1968-07-11 Finished Drilling
1968-07-11 Perforation Treatment Performed - Open-Hole Completion
1968-07-11 Well Mode changed to Drilled and Cased
1968-08-10 Well Began Production
1968-08-10 Well Fluid changed to Crude Oil
1968-08-10 Well Mode changed to Flowing
1968-11-15 Perforation Treatment Performed - Open-Hole Completion
1968-11-15 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1968-11-19 Perforation Treatment Performed - Acid Wash - No Pressure
1969-01-06 Perforation Treatment Performed - Acid Wash - No Pressure
1969-01-12 Perforation Treatment Performed - Cement Plug
1969-01-14 Perforation Treatment Performed - Bullet Perforation
1969-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-30 Well Fluid changed to Crude Oil
1969-11-30 Well Mode changed to Suspended
1995-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-15 Perforation Treatment Performed - Cement Plug
1995-12-15 Plug Back Performed
1995-12-15 Well Abandoned
1995-12-15 Well Fluid changed to Crude Oil
1995-12-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-07-11 Open Hole/Barefoot Completion 1562.40 1595.30 0
1969-01-20 Acid Treatment 1556.00 1557.50 0
1995-12-15 Packing Device Capped w/Cement 1539.00 1539.00 0
1995-12-15 Cement Plug 250.00 490.00 0
1968-11-15 Resin-Gypsum Squeeze or Plug 1578.30 1595.30 0
1968-11-15 Open Hole/Barefoot Completion 1562.40 1578.30 0
1968-11-19 Acid Wash 1562.40 1578.30 0
1969-01-06 Acid Wash 1562.40 1578.30 0
1969-01-12 Cement Plug 1563.60 1578.30 0
1969-01-14 Bullet Perforation 1556.00 1557.50 0
1969-01-15 Acid Treatment 1556.00 1557.50 0
1969-01-17 Acid Treatment 1556.00 1557.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1432 0.0 0.0 0.0
1969 2991 0.0 0.0 0.0

For data sources see[5]

References