X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166063609022

Well Details

Well ID: 1166063609022
Loading map...
Location: 02/09-36-116-06W6/2
Location Alias: 02/09-36-16-06 W6M
Location Alias 2: 02/09-36-116-06 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 06
Section: 36
County/Municipality: Mackenzie County
Well Name: ACL 102 ZAMA 9-36-116-6
Operator Name: Paramount Resources Ltd.
License Number: 0045100
License Date: 1973-02-13
License Status: Suspension
Spud Date: 1973-02-15
Final Drill Date: 1973-03-01
Well Total Depth: 1548.40 m
Surface Hole Latitude: 59.118964
Surface Hole Longitude: -118.855734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-13 Obtained License
1973-03-01 Finished Drilling
1973-03-01 Perforation Treatment Performed - Open-Hole Completion
1990-11-18 Well Log Performed
1995-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-01 Plug Back Performed
1995-03-03 Perforation Treatment Performed - Jet Perforation
1995-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-13 Perforation Treatment Performed - Cement Squeeze
1995-03-13 Plug Back Performed
1995-03-14 Perforation Treatment Performed - Jet Perforation
1995-03-14 Well Mode changed to Drilled and Cased
1995-04-01 Well Began Production
1995-04-01 Well Fluid changed to Gas
1995-04-01 Well Mode changed to Flowing
1995-08-18 Perforation Treatment Performed - Jet Perforation
2011-07-01 Well Fluid changed to Gas
2011-07-01 Well Mode changed to Suspended
2018-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-02 Plug Back Performed
2018-12-03 Well Log Performed
2018-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-04 Perforation Treatment Performed - Jet Perforation
2018-12-04 Plug Back Performed
2018-12-04 Well Fluid changed to Gas
2018-12-04 Well Log Performed
2018-12-04 Well Mode changed to Abandoned Zone
2018-12-05 Perforation Treatment Performed - Cement Plug
2018-12-05 Perforation Treatment Performed - Cement Squeeze
2018-12-05 Plug Back Performed
2018-12-05 Well Log Performed
2018-12-06 Perforation Treatment Performed - Jet Perforation
2018-12-06 Well Log Performed
2018-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-12-07 Perforation Treatment Performed - Jet Perforation
2018-12-07 Well Log Performed
2018-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-12-08 Perforation Treatment Performed - Cement Plug
2018-12-08 Perforation Treatment Performed - Cement Squeeze
2018-12-08 Plug Back Performed
2018-12-09 Perforation Treatment Performed - Jet Perforation
2018-12-09 Well Log Performed
2018-12-10 Perforation Treatment Performed - Cement Plug
2018-12-10 Perforation Treatment Performed - Cement Squeeze
2018-12-10 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-03-01 Open Hole/Barefoot Completion 1484.70 1548.40 0
1995-08-18 Perforation 1339.50 1342.00 13
2018-12-02 Packing Device Capped w/Cement 1289.00 1297.00 0
2018-12-04 Perforation 676.00 677.00 99
2018-12-04 Perforation 676.00 677.00 17
2018-12-04 Packing Device Capped w/Cement 1289.00 1297.00 0
2018-12-05 Cement Plug 511.90 667.00 0
2018-12-05 Cement Squeeze 676.00 677.00 0
2018-12-06 Perforation 319.00 320.00 17
2018-12-07 Acid Treatment 300.00 301.00 0
2018-12-07 Perforation 300.00 301.00 99
1995-03-01 Packing Device Capped w/Cement 1467.00 1475.00 0
2018-12-07 Perforation 300.00 301.00 17
2018-12-08 Cement Plug 288.00 297.00 0
2018-12-08 Cement Squeeze 300.00 301.00 0
2018-12-08 Acid Treatment 300.00 301.00 0
2018-12-09 Perforation 257.00 258.00 17
2018-12-10 Cement Plug 245.00 254.00 0
2018-12-10 Cement Squeeze 257.00 258.00 0
1995-03-03 Perforation 1386.00 1387.50 13
1995-03-03 Perforation 1389.00 1390.50 13
1995-03-13 Cement Squeeze 1386.00 1390.50 0
1995-03-13 Packing Device Capped w/Cement 1362.00 1370.00 0
1995-03-14 Perforation 1311.50 1312.50 13
1995-03-14 Perforation 1314.00 1318.00 13
1995-08-18 Perforation 1321.50 1324.50 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-13 No Incident Encountered 0.00 0.00

For data sources see[5]

References