X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166070213000

Well Details

Well ID: 1166070213000
Loading map...
Location: 00/13-02-116-07W6/0
Location Alias: 00/13-02-16-07 W6M
Location Alias 2: 00/13-02-116-07 W6/00
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 07
Section: 02
County/Municipality: Mackenzie County
Well Name: ACL AMBER 13-2-116-7
Operator Name: Paramount Resources Ltd.
License Number: 0220871
License Date: 1999-01-21
License Status: Suspension
Spud Date: 1999-02-10
Final Drill Date: 1999-02-21
Well Total Depth: 1590.00 m
Surface Hole Latitude: 59.051230
Surface Hole Longitude: -119.079139

For data sources see[1][2]

Well History

Date Event
1999-01-21 Obtained License
1999-02-11 Surface Casing Operation Performed
1999-02-19 Well Log Performed
1999-02-20 Production Casing Operation Performed
1999-02-20 Well Log Performed
1999-02-21 Finished Drilling
1999-02-22 Rig Released
1999-02-22 Well Log Performed
1999-02-22 Well Mode changed to Drilled and Cased
1999-02-23 Well Log Performed
1999-02-25 Well Log Performed
1999-04-10 Well Began Production
1999-04-10 Well Fluid changed to Crude Oil
1999-04-10 Well Mode changed to Flowing
1999-08-07 Liner Casing Operation Performed
1999-08-14 Well Log Performed
1999-08-15 Perforation Treatment Performed - Jet Perforation
1999-08-15 Well Log Performed
1999-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-17 Plug Back Performed
2002-07-17 Well Fluid changed to Crude Oil
2002-07-17 Well Log Performed
2002-07-17 Well Mode changed to Abandoned Zone
2002-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-18 Perforation Treatment Performed - Jet Perforation
2002-07-18 Well Log Performed
2002-09-30 Perforation Treatment Performed - Cement Squeeze
2002-09-30 Well Log Performed
2002-10-04 Perforation Treatment Performed - Cement Squeeze
2002-10-07 Perforation Treatment Performed - Jet Perforation
2002-10-07 Well Log Performed
2002-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-07 Well Log Performed
2009-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-08 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-08-15 Perforation 1546.50 1553.00 13
2002-10-04 Cement Squeeze 1424.00 1426.00 0
2002-10-07 Perforation 1424.00 1425.00 13
2002-10-08 Acid Treatment 1424.00 1425.00 0
2009-02-08 Packing Device Capped w/Cement 1412.00 1420.00 0
1999-08-15 Perforation 1555.00 1558.00 13
1999-08-15 Perforation 1560.00 1562.00 13
1999-09-16 Acid Treatment 1546.50 1562.00 0
2002-07-17 Packing Device Capped w/Cement 1532.00 1540.00 0
2002-07-18 Perforation 1424.00 1426.00 13
2002-07-18 Perforation 1431.00 1433.00 13
2002-07-18 Acid Treatment 1424.00 1433.00 0
2002-09-30 Cement Squeeze 1431.00 1433.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5450 0.0 0.0 0.0
2000 8343 0.0 0.0 0.0
2001 6865 0.0 0.0 0.0

For data sources see[5]

References