X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1166071106002

Well Details

Well ID: 1166071106002
Loading map...
Location: 00/06-11-116-07W6/2
Location Alias: 00/06-11-16-07 W6M
Location Alias 2: 00/06-11-116-07 W6/02
Country: Canada
Province: Alberta
Township: 116
Meridian: 6
Range: 07
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL AMBER 6-11-116-7
Operator Name: Paramount Resources Ltd.
License Number: 0212292
License Date: 1998-01-19
License Status: Abandoned
Spud Date: 1998-02-10
Final Drill Date: 1998-02-16
Well Total Depth: 1580.00 m
Surface Hole Latitude: 59.057569
Surface Hole Longitude: -119.073880

For data sources see[1][2]

Well History

Date Event
1998-01-19 Obtained License
1998-02-10 Well Log Performed
1998-02-12 Surface Casing Operation Performed
1998-02-16 Finished Drilling
1998-02-16 Well Log Performed
1998-02-16 Well Mode changed to Drilled and Cased
1998-02-17 Production Casing Operation Performed
1998-02-17 Rig Released
1998-02-22 Well Log Performed
1998-02-23 Perforation Treatment Performed - Open-Hole Completion
1998-02-25 Well Log Performed
2000-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-27 Well Log Performed
2001-07-31 Well Log Performed
2006-11-11 Well Log Performed
2006-11-14 Well Log Performed
2006-11-15 Well Log Performed
2006-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-16 Plug Back Performed
2006-11-16 Well Log Performed
2006-11-18 Perforation Treatment Performed - Jet Perforation
2006-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-02 Well Log Performed
2010-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-03 Perforation Treatment Performed - Jet Perforation
2010-12-03 Plug Back Performed
2010-12-03 Well Log Performed
2010-12-03 Well Mode changed to Abandoned Zone
2010-12-04 Perforation Treatment Performed - Remedial Casing
2010-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-07 Perforation Treatment Performed - Remedial Casing
2010-12-12 Well Log Performed
2010-12-13 Perforation Treatment Performed - Jet Perforation
2010-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-14 Perforation Treatment Performed - Remedial Casing
2010-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-15 Perforation Treatment Performed - Jet Perforation
2010-12-15 Well Log Performed
2010-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-17 Perforation Treatment Performed - Remedial Casing
2011-01-04 Perforation Treatment Performed - Jet Perforation
2011-01-04 Well Log Performed
2011-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-06 Perforation Treatment Performed - Remedial Casing
2011-01-11 Well Abandoned
2011-01-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-23 Open Hole/Barefoot Completion 1535.00 1580.00 0
2010-12-04 Remedial Casing Cementing 408.00 409.00 0
2010-12-05 Acid Treatment 374.50 375.50 0
2010-12-07 Remedial Casing Cementing 374.50 375.50 0
2010-12-13 Perforation 400.00 401.00 17
2010-12-13 Perforation 400.00 400.90 99
2010-12-14 Remedial Casing Cementing 400.00 401.00 0
2010-12-14 Acid Treatment 400.00 401.00 0
2010-12-15 Perforation 380.00 380.90 99
2010-12-15 Acid Treatment 380.00 381.00 0
2010-12-15 Perforation 380.00 381.00 17
2000-02-29 Acid Treatment 1556.00 1580.00 0
2010-12-17 Acid Treatment 380.00 381.00 0
2010-12-17 Packing Device Capped w/Cement 365.90 373.90 0
2010-12-17 Remedial Casing Cementing 380.00 381.00 0
2011-01-04 Perforation 361.00 362.00 17
2011-01-05 Acid Treatment 361.00 362.00 0
2011-01-06 Remedial Casing Cementing 361.00 362.00 0
2011-01-06 Packing Device Capped w/Cement 350.00 359.00 0
2006-11-16 Packing Device Capped w/Cement 1518.00 1526.00 0
2006-11-18 Perforation 744.00 748.00 17
2006-11-19 Acid Treatment 744.00 748.00 0
2010-12-03 Perforation 408.00 409.00 17
2010-12-03 Packing Device Capped w/Cement 732.50 740.50 0
2010-12-03 Perforation 374.50 375.50 99
2010-12-03 Perforation 374.50 375.50 17

For data sources see[4]



References