If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166072601S02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.095909,"lon":-119.054795,"icon":""}]} |
| Location: S0/01-26-116-07W6/2 | |
| Location Alias: S0/01-26-16-07 W6M | |
| Location Alias 2: S0/01-26-116-07 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 26 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL AMBER 1-26-116-7 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0039462 | |
| License Date: 1970-12-29 | |
| License Status: Suspension | |
| Spud Date: 1971-01-19 | |
| Final Drill Date: 1971-02-07 | |
| Well Total Depth: 1661.20 m | |
| Surface Hole Latitude: 59.095909 | |
| Surface Hole Longitude: -119.054795 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1970-12-29 | Obtained License |
| 1971-01-27 | Drill Stem Test Performed |
| 1971-01-29 | Drill Stem Test Performed |
| 1971-02-01 | Intermediate Casing Operation Performed |
| 1971-02-07 | Finished Drilling |
| 1971-02-07 | Perforation Treatment Performed - Open-Hole Completion |
| 1971-02-07 | Well Mode changed to Drilled and Cased |
| 1971-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1971-02-08 | Perforation Treatment Performed - Open-Hole Completion |
| 1978-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1978-08-30 | Perforation Treatment Performed - Cement Squeeze |
| 1978-08-30 | Perforation Treatment Performed - Open-Hole Completion |
| 1978-11-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1978-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-11-27 | Perforation Treatment Performed - Jet Perforation |
| 1978-12-01 | Well Began Production |
| 1978-12-01 | Well Fluid changed to Gas |
| 1978-12-01 | Well Mode changed to Flowing |
| 1980-05-01 | Well Fluid changed to Gas |
| 1980-05-01 | Well Mode changed to Suspended |
| 1999-02-27 | Well Fluid changed to Gas |
| 1999-02-27 | Well Mode changed to Flowing |
| 2001-03-22 | Well Log Performed |
| 2001-03-25 | Perforation Treatment Performed - Cement Squeeze |
| 2001-03-25 | Production Casing Operation Performed |
| 2001-03-28 | Well Log Performed |
| 2001-03-29 | Perforation Treatment Performed - Jet Perforation |
| 2001-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-04-04 | Well Log Performed |
| 2001-04-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-06-15 | Perforation Treatment Performed - Jet Perforation |
| 2002-06-15 | Well Log Performed |
| 2002-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-06-19 | Well Fluid changed to Gas |
| 2002-06-19 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1971-02-07 | Open Hole/Barefoot Completion | 1516.40 | 1661.20 | 0 |
| 2001-03-25 | Cement Squeeze | 1416.00 | 1422.00 | 0 |
| 2001-03-29 | Perforation | 1406.30 | 1407.60 | 13 |
| 2001-03-29 | Perforation | 1409.40 | 1411.20 | 13 |
| 2001-03-29 | Perforation | 1416.10 | 1417.30 | 13 |
| 2001-03-29 | Perforation | 1419.20 | 1421.60 | 13 |
| 2001-03-30 | Acid Treatment | 1406.30 | 1421.60 | 0 |
| 2001-04-08 | Acid Treatment | 1406.30 | 1411.20 | 0 |
| 2002-06-15 | Perforation | 1338.70 | 1339.90 | 14 |
| 2002-06-15 | Perforation | 1345.10 | 1346.30 | 14 |
| 2002-06-16 | Acid Treatment | 1338.70 | 1346.30 | 0 |
| 1971-02-08 | Packing Device Capped w/Cement | 1569.70 | 1575.80 | 0 |
| 1971-02-08 | Open Hole/Barefoot Completion | 1516.40 | 1569.70 | 0 |
| 1978-08-30 | Cement Squeeze | 1540.00 | 1569.70 | 0 |
| 1978-08-30 | Packing Device Capped w/Cement | 1538.00 | 1540.00 | 0 |
| 1978-08-30 | Open Hole/Barefoot Completion | 1516.40 | 1538.00 | 0 |
| 1978-11-24 | Packing Device Capped w/Cement | 1501.40 | 1509.00 | 0 |
| 1978-11-27 | Perforation | 1416.00 | 1422.00 | 7 |
| 1978-11-27 | Acid Treatment | 1416.00 | 1422.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1978 | 744 | 0.0 | 0.0 | 0.0 |
| 1979 | 6409 | 0.0 | 0.0 | 0.0 |
| 1980 | 1740 | 0.0 | 0.0 | 0.0 |
| 1999 | 6988 | 0.0 | 0.0 | 0.0 |
| 2000 | 4461 | 0.0 | 0.0 | 0.0 |
| 2001 | 2543 | 0.0 | 0.0 | 0.0 |
For data sources see[5]