X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176031810000

Well Details

Well ID: 1176031810000
Loading map...
Location: 00/10-18-117-03W6/0
Location Alias: 00/10-18-17-03 W6M
Location Alias 2: 00/10-18-117-03 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 03
Section: 18
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-18-117-3
Operator Name: Paramount Resources Ltd.
License Number: 0162951
License Date: 1993-12-07
License Status: Abandoned
Spud Date: 1994-01-08
Final Drill Date: 1994-01-23
Well Total Depth: 1557.00 m
Surface Hole Latitude: 59.161570
Surface Hole Longitude: -118.497374

For data sources see[1][2]

Well History

Date Event
1993-12-07 Obtained License
1994-01-09 Surface Casing Operation Performed
1994-01-13 Direction Drilling Operation Performed - Deviate
1994-01-19 Well Log Performed
1994-01-21 Intermediate Casing Operation Performed
1994-01-23 Finished Drilling
1994-01-23 Well Log Performed
1994-01-23 Well Mode changed to Drilled and Cased
1994-01-24 Well Log Performed
1994-01-25 Drill Stem Test Performed
1994-01-25 Well Log Performed
1994-01-26 Plug Back Performed
1994-01-27 Liner Casing Operation Performed
1994-01-28 Rig Released
1994-02-07 Perforation Treatment Performed - Jet Perforation
1994-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-14 Well Began Production
1994-02-14 Well Fluid changed to Crude Oil
1994-02-14 Well Mode changed to Pumping
1995-11-25 Perforation Treatment Performed - Jet Perforation
1995-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-03 Perforation Treatment Performed - Cement Squeeze
2000-06-03 Well Log Performed
2000-06-05 Perforation Treatment Performed - Jet Perforation
2000-06-05 Well Log Performed
2000-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-08 Plug Back Performed
2000-06-08 Well Fluid changed to Crude Oil
2000-06-08 Well Mode changed to Abandoned Zone
2000-06-13 Perforation Treatment Performed - Jet Perforation
2000-06-13 Well Log Performed
2000-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-25 Perforation Treatment Performed - Cement Squeeze
2004-05-25 Plug Back Performed
2004-05-28 Perforation Treatment Performed - Jet Perforation
2004-06-08 Well Fluid changed to Crude Oil
2004-06-08 Well Mode changed to Pumping
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Suspended
2012-09-10 Well Log Performed
2012-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-11 Plug Back Performed
2012-09-11 Well Fluid changed to Crude Oil
2012-09-11 Well Log Performed
2012-09-11 Well Mode changed to Abandoned Zone
2012-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-12 Perforation Treatment Performed - Jet Perforation
2012-09-12 Perforation Treatment Performed - Remedial Casing
2012-09-12 Plug Back Performed
2012-09-12 Well Log Performed
2012-09-26 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-01-13 1160.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-07 Perforation 1494.00 1496.00 13
2000-06-14 Acid Treatment 1308.50 1310.50 0
2004-05-25 Cement Squeeze 1308.50 1310.50 0
2004-05-28 Perforation 1482.00 1490.00 26
2012-09-11 Packing Device Capped w/Cement 1469.00 1477.00 0
2012-09-12 Packing Device Capped w/Cement 1310.00 1318.00 0
2012-09-12 Perforation 578.00 579.00 17
2012-09-12 Remedial Casing Cementing 578.00 579.00 0
2012-09-12 Packing Device Capped w/Cement 565.00 575.00 0
2012-09-12 Packing Device Capped w/Cement 1296.00 1304.00 0
1994-02-09 Acid Treatment 1494.00 1496.00 0
1995-11-25 Perforation 1482.00 1490.00 26
1995-11-26 Acid Treatment 1482.00 1490.00 0
2000-06-03 Cement Squeeze 1494.00 1496.00 0
2000-06-05 Perforation 1482.00 1490.00 13
2000-06-06 Acid Treatment 1482.00 1490.00 0
2000-06-08 Packing Device Capped w/Cement 1471.50 1479.50 0
2000-06-13 Perforation 1308.50 1310.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6727 0.0 0.0 0.0
1995 8070 0.0 0.0 0.0
1996 8320 0.0 0.0 0.0
1997 7220 0.0 0.0 0.0
1998 8114 0.0 0.0 0.0
1999 6494 0.0 0.0 0.0
2004 4829 0.0 0.0 0.0
2005 8652 0.0 0.0 0.0
2006 8334 0.0 0.0 0.0
2007 8355 0.0 0.0 0.0
2008 7682 0.0 0.0 0.0
2009 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-26 No Incident Encountered 0.00 0.00
2012-09-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References