If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1176033003002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.185078,"lon":-118.500353,"icon":""}]} |
| Location: 00/03-30-117-03W6/2 | |
| Location Alias: 00/03-30-17-03 W6M | |
| Location Alias 2: 00/03-30-117-03 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 117 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 30 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 3-30-117-3 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0153340 | |
| License Date: 1992-08-04 | |
| License Status: Abandoned | |
| Spud Date: 1992-09-06 | |
| Final Drill Date: 1992-09-17 | |
| Well Total Depth: 1510.00 m | |
| Surface Hole Latitude: 59.185078 | |
| Surface Hole Longitude: -118.500353 |
| Date | Event |
|---|---|
| 1992-08-04 | Obtained License |
| 1992-09-07 | Surface Casing Operation Performed |
| 1992-09-10 | Direction Drilling Operation Performed - Deviate |
| 1992-09-14 | Well Log Performed |
| 1992-09-15 | Intermediate Casing Operation Performed |
| 1992-09-17 | Finished Drilling |
| 1992-09-17 | Well Log Performed |
| 1992-09-17 | Well Mode changed to Drilled and Cased |
| 1992-09-18 | Liner Casing Operation Performed |
| 1992-09-18 | Rig Released |
| 1992-10-13 | Well Log Performed |
| 1992-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-10-20 | Perforation Treatment Performed - Jet Perforation |
| 1997-11-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-11-23 | Plug Back Performed |
| 1997-11-23 | Well Log Performed |
| 1997-11-24 | Perforation Treatment Performed - Jet Perforation |
| 1997-11-24 | Well Log Performed |
| 1997-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-12-21 | Well Began Production |
| 1997-12-21 | Well Fluid changed to Gas |
| 1997-12-21 | Well Mode changed to Flowing |
| 2003-03-01 | Well Fluid changed to Gas |
| 2003-03-01 | Well Mode changed to Suspended |
| 2003-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-09-08 | Perforation Treatment Performed - Jet Perforation |
| 2003-09-08 | Plug Back Performed |
| 2003-09-08 | Well Fluid changed to Gas |
| 2003-09-08 | Well Mode changed to Abandoned Zone |
| 2003-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2003-09-17 | Plug Back Performed |
| 2010-01-03 | Well Log Performed |
| 2010-02-09 | Well Log Performed |
| 2010-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-02-11 | Perforation Treatment Performed - Remedial Casing |
| 2010-02-19 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1992-09-10 | 940.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1992-10-20 | Perforation | 1444.00 | 1446.50 | 13 |
| 2003-09-17 | Packing Device Capped w/Cement | 1246.00 | 1254.00 | 0 |
| 2010-02-10 | Perforation | 581.50 | 582.50 | 13 |
| 2010-02-11 | Remedial Casing Cementing | 581.50 | 582.50 | 0 |
| 2010-02-11 | Packing Device Capped w/Cement | 570.00 | 579.50 | 0 |
| 1992-10-20 | Acid Treatment | 1444.00 | 1446.50 | 0 |
| 1997-11-23 | Packing Device Capped w/Cement | 1432.00 | 1440.00 | 0 |
| 1997-11-24 | Perforation | 1317.00 | 1325.00 | 13 |
| 1997-11-25 | Acid Treatment | 1317.00 | 1325.00 | 0 |
| 2003-09-08 | Packing Device Capped w/Cement | 1301.00 | 1309.00 | 0 |
| 2003-09-08 | Perforation | 1259.00 | 1260.00 | 13 |
| 2003-09-08 | Perforation | 1261.00 | 1263.00 | 13 |
| 2003-09-09 | Acid Treatment | 1259.00 | 1263.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1997 | 260 | 0.0 | 0.0 | 0.0 |
| 1998 | 7972 | 0.0 | 0.0 | 0.0 |
| 1999 | 7002 | 0.0 | 0.0 | 0.0 |
| 2000 | 7435 | 0.0 | 0.0 | 0.0 |
| 2001 | 4333 | 0.0 | 0.0 | 0.0 |
For data sources see[6]