1176040403002

Well Details

Well ID: 1176040403002
Loading map...
Location: 00/03-04-117-04W6/2
Location Alias: 00/03-04-17-04 W6M
Location Alias 2: 00/03-04-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 04
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 3-4-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0032442
License Date: 1967-07-10
License Status: Suspension
Spud Date: 1967-07-24
Final Drill Date: 1967-08-13
Well Total Depth: 1563.60 m
Surface Hole Latitude: 59.126255
Surface Hole Longitude: -118.614806

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-10 Obtained License
1967-07-31 Drill Stem Test Performed
1967-08-03 Drill Stem Test Performed
1967-08-07 Production Casing Operation Performed
1967-08-09 Drill Stem Test Performed
1967-08-13 Finished Drilling
1967-08-13 Well Mode changed to Drilled and Cased
1967-08-17 Perforation Treatment Performed - Open-Hole Completion
1987-11-03 Well Log Performed
1987-11-18 Well Log Performed
1987-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-11-19 Plug Back Performed
1987-11-19 Well Log Performed
1989-11-13 Perforation Treatment Performed - Jet Perforation
1989-11-13 Well Log Performed
1990-01-01 Well Began Production
1990-01-01 Well Fluid changed to Gas
1990-01-01 Well Mode changed to Flowing
1991-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-18 Plug Back Performed
1991-03-18 Well Fluid changed to Gas
1991-03-18 Well Mode changed to Abandoned Zone
1991-03-19 Perforation Treatment Performed - Jet Perforation
1996-10-03 Well Log Performed
1996-10-05 Perforation Treatment Performed - Cement Squeeze
1996-10-12 Well Log Performed
1996-10-19 Well Log Performed
1997-10-23 Perforation Treatment Performed - Jet Perforation
1997-10-23 Well Log Performed
1997-10-28 Perforation Treatment Performed - Jet Perforation
1997-10-28 Well Log Performed
2001-10-12 Perforation Treatment Performed - Jet Perforation
2001-10-13 Well Log Performed
2001-10-14 Perforation Treatment Performed - Cement Squeeze
2001-10-16 Perforation Treatment Performed - Jet Perforation
2001-10-17 Well Log Performed
2001-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-31 Well Fluid changed to Gas
2001-10-31 Well Mode changed to Flowing
2004-01-26 Well Log Performed
2004-01-31 Perforation Treatment Performed - Cement Squeeze
2004-01-31 Plug Back Performed
2004-01-31 Well Fluid changed to Gas
2004-01-31 Well Mode changed to Abandoned Zone
2004-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-03 Perforation Treatment Performed - Cement Squeeze
2004-02-03 Plug Back Performed
2012-02-29 Perforation Treatment Performed - Open-Hole Completion
2012-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-02 Perforation Treatment Performed - Cement Squeeze
2012-03-02 Plug Back Performed
2012-03-02 Well Log Performed
2012-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-03 Perforation Treatment Performed - Jet Perforation
2012-03-03 Well Log Performed
2012-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-05 Perforation Treatment Performed - Remedial Casing
2012-03-06 Perforation Treatment Performed - Jet Perforation
2012-03-06 Well Log Performed
2012-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-07 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-17 Open Hole/Barefoot Completion 1416.70 1484.70 0
1997-10-28 Perforation 1273.40 1276.50 13
2001-10-12 Perforation 1319.70 1329.50 13
2001-10-14 Cement Squeeze 1319.70 1329.50 0
2001-10-16 Perforation 1319.70 1322.70 13
2001-10-19 Acid Treatment 1319.70 1322.70 0
2004-01-31 Cement Squeeze 1319.70 1322.70 0
2004-02-01 Acid Treatment 1263.70 1276.50 0
2004-02-03 Cement Squeeze 1263.70 1276.50 0
2012-02-29 Open Hole/Barefoot Completion 1416.70 1484.70 0
2012-03-02 Packing Device Capped w/Cement 1307.00 1315.00 0
1987-11-19 Packing Device Capped w/Cement 1404.00 1412.00 0
2012-03-02 Packing Device Capped w/Cement 1400.00 1410.00 0
2012-03-02 Cement Squeeze 1416.70 1484.70 0
2012-03-03 Packing Device Capped w/Cement 1252.00 1260.00 0
2012-03-03 Perforation 602.00 607.00 17
2012-03-05 Packing Device Capped w/Cement 589.00 599.00 0
2012-03-05 Remedial Casing Cementing 602.00 607.00 0
2012-03-06 Perforation 256.00 257.00 17
2012-03-07 Remedial Casing Cementing 256.00 257.00 0
2012-03-07 Packing Device Capped w/Cement 244.00 254.00 0
1989-11-13 Perforation 1320.00 1329.50 13
1991-03-18 Packing Device Capped w/Cement 1305.00 1313.00 0
1991-03-19 Perforation 1263.40 1267.70 13
1991-03-19 Perforation 1272.80 1276.50 13
1996-10-05 Cement Squeeze 1263.40 1276.50 0
1997-10-23 Perforation 1319.70 1322.70 13
1997-10-28 Perforation 1263.70 1267.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 5897 0.0 0.0 0.0
2001 1409 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References