X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176041907022

Well Details

Well ID: 1176041907022
Loading map...
Location: 02/07-19-117-04W6/2
Location Alias: 02/07-19-17-04 W6M
Location Alias 2: 02/07-19-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL 102 ZAMA 7-19-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0088879
License Date: 1981-02-09
License Status: Suspension
Spud Date: 1981-02-12
Final Drill Date: 1981-03-06
Well Total Depth: 1605.00 m
Surface Hole Latitude: 59.173763
Surface Hole Longitude: -118.665984

For data sources see[1][2]

Well History

Date Event
1981-02-09 Obtained License
1981-03-01 Production Casing Operation Performed
1981-03-04 Lost Circulation Occurred
1981-03-06 Finished Drilling
1981-03-06 Perforation Treatment Performed - Open-Hole Completion
1981-03-06 Well Mode changed to Drilled and Cased
1996-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-26 Well Log Performed
2001-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-27 Plug Back Performed
2001-03-27 Well Log Performed
2001-03-28 Perforation Treatment Performed - Jet Perforation
2001-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-04 Well Began Production
2001-05-04 Well Fluid changed to Gas
2001-05-04 Well Mode changed to Flowing
2002-01-03 Perforation Treatment Performed - Jet Perforation
2002-01-05 Well Fluid changed to Gas
2002-01-05 Well Mode changed to Suspended
2003-10-05 Perforation Treatment Performed - Cement Squeeze
2003-10-05 Plug Back Performed
2003-10-07 Perforation Treatment Performed - Cement Squeeze
2003-10-07 Plug Back Performed
2003-10-12 Perforation Treatment Performed - Open-Hole Completion
2003-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-14 Perforation Treatment Performed - Open-Hole Completion
2003-10-14 Well Log Performed
2003-11-07 Well Fluid changed to Gas
2003-11-07 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-06 Open Hole/Barefoot Completion 1437.00 1605.00 0
2003-10-12 Open Hole/Barefoot Completion 1437.00 1605.00 0
2003-10-14 Packing Device Capped w/Cement 1510.00 1526.00 0
2003-10-14 Open Hole/Barefoot Completion 1437.00 1510.00 0
1996-05-16 Acid Treatment 1437.00 1605.00 0
2001-03-27 Packing Device Capped w/Cement 1413.00 1421.00 0
2001-03-28 Perforation 1343.00 1345.00 13
2001-03-28 Perforation 1338.00 1341.00 13
2001-03-29 Acid Treatment 1338.00 1345.00 0
2002-01-03 Perforation 1286.50 1290.00 13
2003-10-05 Cement Squeeze 1286.50 1290.00 0
2003-10-07 Cement Squeeze 1338.00 1345.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1683 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-03-04 Lost Circulation 1483.00 1483.00

For data sources see[6]

References