X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176042503002

Well Details

Well ID: 1176042503002
Loading map...
Location: 00/03-25-117-04W6/2
Location Alias: 00/03-25-17-04 W6M
Location Alias 2: 00/03-25-117-04 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 25
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 3-25-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0033637
License Date: 1968-02-09
License Status: Abandoned
Spud Date: 1968-02-12
Final Drill Date: 1968-02-24
Well Total Depth: 1493.20 m
Surface Hole Latitude: 59.185842
Surface Hole Longitude: -118.532685

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-02-09 Obtained License
1968-02-24 Finished Drilling
1968-02-26 Drill Stem Test Performed
1968-02-27 Drill Stem Test Performed
1968-02-28 Production Casing Operation Performed
1968-03-05 Perforation Treatment Performed - Jet Perforation
1977-12-03 Well Log Performed
1977-12-04 Perforation Treatment Performed - Jet Perforation
1977-12-04 Well Log Performed
1978-12-01 Well Mode changed to Drilled and Cased
1979-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-01-30 Plug Back Performed
1979-02-15 Perforation Treatment Performed - Jet Perforation
1979-02-27 Well Mode changed to Drilled and Cased
1982-05-01 Well Began Production
1982-05-01 Well Fluid changed to Gas
1982-05-01 Well Mode changed to Flowing
1985-07-26 Perforation Treatment Performed - Jet Perforation
1985-07-26 Well Log Performed
1986-01-14 Well Log Performed
1986-02-02 Well Log Performed
1986-02-05 Perforation Treatment Performed - Cement Squeeze
1986-02-06 Perforation Treatment Performed - Jet Perforation
1986-02-06 Well Log Performed
1986-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-11 Well Log Performed
1986-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-12 Perforation Treatment Performed - Cement Squeeze
1986-02-17 Perforation Treatment Performed - Abrasa-Jet Perforation
1986-02-17 Well Log Performed
1987-01-09 Well Fluid changed to Gas
1987-01-09 Well Mode changed to Suspended
1997-09-01 Well Fluid changed to Gas
1997-09-01 Well Mode changed to Flowing
2009-02-15 Well Log Performed
2009-02-16 Well Log Performed
2009-02-17 Well Log Performed
2009-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-18 Perforation Treatment Performed - Jet Perforation
2009-02-18 Plug Back Performed
2009-02-18 Well Fluid changed to Gas
2009-02-18 Well Mode changed to Abandoned Zone
2009-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-19 Perforation Treatment Performed - Remedial Casing
2009-02-19 Well Log Performed
2009-02-20 Perforation Treatment Performed - Jet Perforation
2009-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-21 Perforation Treatment Performed - Remedial Casing
2009-03-07 Well Abandoned
2009-03-07 Well Fluid changed to Gas
2009-03-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-03-05 Perforation 1425.20 1427.70 7
1985-07-26 Perforation 1308.50 1309.80 13
1985-07-26 Perforation 1310.40 1311.00 13
1985-07-26 Perforation 1312.20 1313.40 13
1986-02-05 Cement Squeeze 1305.50 1309.50 0
1986-02-06 Perforation 1305.50 1306.10 13
1986-02-06 Perforation 1308.50 1309.50 13
1986-02-07 Acid Treatment 1305.50 1309.50 0
1986-02-12 Acid Treatment 1305.50 1309.50 0
1986-02-12 Cement Squeeze 1305.50 1309.50 0
1986-02-17 Hydra Jet Perforation 1308.50 1309.10 0
1968-03-05 Perforation 1431.60 1432.60 7
2009-02-18 Packing Device Capped w/Cement 1285.00 1293.00 0
2009-02-18 Perforation 593.00 594.00 17
2009-02-19 Remedial Casing Cementing 593.00 594.00 0
2009-02-19 Packing Device Capped w/Cement 522.00 581.00 0
2009-02-20 Perforation 258.00 259.00 17
2009-02-21 Remedial Casing Cementing 258.00 259.00 0
2009-02-21 Packing Device Capped w/Cement 70.00 250.00 0
2009-02-21 Packing Device Capped w/Cement 48.80 63.80 0
1968-03-05 Perforation 1433.50 1434.10 7
1968-03-05 Perforation 1435.00 1435.60 7
1968-03-05 Perforation 1436.50 1437.40 7
1977-12-04 Perforation 1445.40 1451.50 13
1977-12-04 Perforation 1457.60 1462.40 13
1979-01-30 Packing Device Capped w/Cement 1413.00 1420.00 0
1979-02-15 Perforation 1308.50 1312.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1952 0.0 0.0 0.0
1983 58 0.0 0.0 0.0
1984 1595 0.0 0.0 0.0
1985 2324 0.0 0.0 0.0
1986 1405 0.0 0.0 0.0
1997 2480 0.0 0.0 0.0
1998 8166 0.0 0.0 0.0
1999 6021 0.0 0.0 0.0
2000 4227 0.0 0.0 0.0
2001 7830 0.0 0.0 0.0
2002 3212 0.0 0.0 0.0

For data sources see[5]

References