X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176042608000

Well Details

Well ID: 1176042608000
Loading map...
Location: 00/08-26-117-04W6/0
Location Alias: 00/08-26-17-04 W6M
Location Alias 2: 00/08-26-117-04 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 26
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 8-26-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0031474
License Date: 1966-12-16
License Status: Abandoned
Spud Date: 1966-12-20
Final Drill Date: 1967-01-06
Well Total Depth: 1554.50 m
Surface Hole Latitude: 59.188310
Surface Hole Longitude: -118.543400

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-16 Obtained License
1966-12-26 Drill Stem Test Performed
1966-12-28 Drill Stem Test Performed
1967-01-01 Drill Stem Test Performed
1967-01-01 Well Log Performed
1967-01-06 Finished Drilling
1967-01-06 Well Log Performed
1967-01-06 Well Mode changed to Drilled and Cased
1967-01-07 Liner Casing Operation Performed
1967-02-25 Perforation Treatment Performed - Jet Perforation
1967-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-27 Well Began Production
1967-02-27 Well Fluid changed to Crude Oil
1967-02-27 Well Mode changed to Flowing
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1991-09-09 Perforation Treatment Performed - Jet Perforation
1991-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-27 Plug Back Performed
1997-06-27 Well Fluid changed to Crude Oil
1997-06-27 Well Log Performed
1997-06-27 Well Mode changed to Abandoned Zone
1997-06-28 Perforation Treatment Performed - Jet Perforation
1997-06-28 Well Log Performed
1997-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-11 Perforation Treatment Performed - Jet Perforation
1997-07-11 Well Log Performed
1997-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-25 Well Log Performed
2000-01-26 Well Log Performed
2002-03-02 Well Log Performed
2002-03-03 Perforation Treatment Performed - Jet Perforation
2002-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-22 Perforation Treatment Performed - Cement Squeeze
2009-10-22 Plug Back Performed
2009-10-28 Perforation Treatment Performed - Jet Perforation
2009-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-02 Plug Back Performed
2009-11-02 Well Log Performed
2009-11-03 Well Log Performed
2009-11-04 Perforation Treatment Performed - Jet Perforation
2009-11-04 Well Log Performed
2009-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-05 Perforation Treatment Performed - Jet Perforation
2009-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-06 Perforation Treatment Performed - Remedial Casing
2009-11-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-25 Perforation 1428.30 1430.70 10
1997-06-28 Perforation 1308.20 1309.40 13
1997-06-28 Perforation 1306.40 1307.00 13
1997-06-29 Acid Treatment 1306.40 1309.40 0
1997-07-11 Perforation 1316.70 1318.50 13
1997-07-11 Perforation 1311.20 1312.50 13
1997-07-13 Acid Treatment 1308.20 1318.50 0
2002-03-03 Perforation 1248.00 1250.00 13
2002-03-03 Perforation 1255.50 1257.50 13
2002-03-03 Perforation 1262.00 1265.50 13
2002-03-04 Acid Treatment 1248.00 1265.50 0
1967-02-25 Perforation 1435.90 1437.10 10
2009-10-22 Cement Squeeze 1306.40 1318.50 0
2009-10-22 Cement Squeeze 1248.00 1265.50 0
2009-10-28 Perforation 1438.00 1438.70 10
2009-10-28 Perforation 1428.00 1432.50 13
2009-10-28 Perforation 1435.90 1437.10 10
2009-10-28 Perforation 1436.00 1441.70 13
2009-10-28 Perforation 1440.20 1441.70 10
2009-10-28 Perforation 1428.30 1430.70 10
2009-11-02 Packing Device Capped w/Cement 1351.00 1424.00 0
2009-11-04 Perforation 596.00 597.00 20
1967-02-25 Perforation 1438.00 1438.70 10
2009-11-05 Perforation 257.00 258.00 20
2009-11-05 Packing Device Capped w/Cement 582.00 590.00 0
2009-11-06 Packing Device Capped w/Cement 238.00 254.00 0
2009-11-06 Remedial Casing Cementing 257.00 258.00 0
1967-02-25 Perforation 1440.20 1441.70 10
1967-02-26 Acid Treatment 1428.30 1441.70 0
1991-09-09 Perforation 1428.00 1432.50 13
1991-09-09 Perforation 1436.00 1441.70 13
1991-09-10 Acid Treatment 1428.00 1441.70 0
1997-06-27 Packing Device Capped w/Cement 1350.00 1358.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 166 0.0 0.0 0.0
1968 2460 0.0 0.0 0.0
1969 3675 0.0 0.0 0.0
1970 2724 0.0 0.0 0.0
1971 2473 0.0 0.0 0.0
1972 3384 0.0 0.0 0.0
1973 7240 0.0 0.0 0.0
1974 8436 0.0 0.0 0.0
1975 8165 0.0 0.0 0.0
1976 8264 0.0 0.0 0.0
1977 8444 0.0 0.0 0.0
1978 8227 0.0 0.0 0.0
1979 8284 0.0 0.0 0.0
1980 8448 0.0 0.0 0.0
1981 7974 0.0 0.0 0.0
1982 8653 0.0 0.0 0.0
1983 8222 0.0 0.0 0.0
1984 8764 0.0 0.0 0.0
1985 8659 0.0 0.0 0.0
1986 7324 0.0 0.0 0.0
1987 7922 0.0 0.0 0.0
1988 8204 0.0 0.0 0.0
1989 7624 0.0 0.0 0.0
1990 8652 0.0 0.0 0.0
1991 8437 0.0 0.0 0.0
1992 8625 0.0 0.0 0.0
1993 7667 0.0 0.0 0.0
1994 8732 0.0 0.0 0.0
1995 5585 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References