X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176051109002

Well Details

Well ID: 1176051109002
Loading map...
Location: 00/09-11-117-05W6/2
Location Alias: 00/09-11-17-05 W6M
Location Alias 2: 00/09-11-117-05 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 9-11-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0034509
License Date: 1968-07-22
License Status: Abandoned
Spud Date: 1968-08-27
Final Drill Date: 1968-10-05
Well Total Depth: 1554.50 m
Surface Hole Latitude: 59.149230
Surface Hole Longitude: -118.717468

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-07-22 Obtained License
1968-08-27 Direction Drilling Operation Performed - 98
1968-09-25 Drill Stem Test Performed
1968-10-01 Intermediate Casing Operation Performed
1968-10-05 Finished Drilling
1968-10-05 Perforation Treatment Performed - Open-Hole Completion
1968-10-05 Well Mode changed to Drilled and Cased
1968-10-16 Well Began Production
1968-10-16 Well Fluid changed to Crude Oil
1968-10-16 Well Mode changed to Pumping
1970-12-01 Well Fluid changed to Crude Oil
1970-12-01 Well Mode changed to Suspended
1983-06-23 Well Log Performed
1983-06-24 Perforation Treatment Performed - Jet Perforation
1983-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-05 Well Fluid changed to Crude Oil
1983-08-05 Well Mode changed to Pumping
1990-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-06 Well Log Performed
1994-10-23 Perforation Treatment Performed - Cement Squeeze
1994-10-23 Plug Back Performed
1994-10-23 Production Casing Operation Performed
1994-10-23 Well Fluid changed to Crude Oil
1994-10-23 Well Mode changed to Abandoned Zone
1994-10-26 Perforation Treatment Performed - Jet Perforation
1994-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-13 Well Log Performed
1996-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-08-14 Plug Back Performed
2001-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-30 Plug Back Performed
2011-12-03 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1968-08-27 1049.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-05 Open Hole/Barefoot Completion 1484.40 1554.50 0
1996-08-14 Packing Device Capped w/Cement 1335.00 1343.00 0
1996-08-14 Perforation 1294.20 1296.60 13
1996-08-14 Perforation 1287.50 1289.30 13
2001-10-19 Acid Treatment 1287.50 1289.30 0
2011-11-30 Packing Device Capped w/Cement 1273.00 1282.00 0
1983-06-24 Perforation 1472.20 1475.20 7
1983-07-30 Acid Treatment 1472.20 1475.20 0
1990-08-10 Acid Treatment 1472.20 1475.20 0
1994-10-23 Cement Squeeze 1472.20 1475.20 0
1994-10-26 Perforation 1349.00 1349.70 13
1994-10-26 Perforation 1351.50 1352.70 13
1994-10-26 Perforation 1355.10 1356.40 13
1994-10-31 Acid Treatment 1349.00 1356.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 633 0.0 0.0 0.0
1969 6442 0.0 0.0 0.0
1970 693 0.0 0.0 0.0
1983 3425 0.0 0.0 0.0
1984 4640 0.0 0.0 0.0
1985 8237 0.0 0.0 0.0
1986 5023 0.0 0.0 0.0
1987 8602 0.0 0.0 0.0
1988 8688 0.0 0.0 0.0
1989 8303 0.0 0.0 0.0
1990 5226 0.0 0.0 0.0
1992 216 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-12-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References