X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176051716000

Well Details

Well ID: 1176051716000
Loading map...
Location: 00/16-17-117-05W6/0
Location Alias: 00/16-17-17-05 W6M
Location Alias 2: 00/16-17-117-05 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 17
County/Municipality: Mackenzie County
Well Name: PPRL ZAMA 16-17-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0137868
License Date: 1988-12-23
License Status: Abandoned
Spud Date: 1989-01-05
Final Drill Date: 1989-01-26
Well Total Depth: 1571.00 m
Surface Hole Latitude: 59.167001
Surface Hole Longitude: -118.801170

For data sources see[1][2]

Well History

Date Event
1988-01-19 Well Log Performed
1988-12-23 Obtained License
1989-01-05 Well Log Performed
1989-01-07 Surface Casing Operation Performed
1989-01-11 Direction Drilling Operation Performed - Deviate
1989-01-19 Well Log Performed
1989-01-21 Intermediate Casing Operation Performed
1989-01-26 Finished Drilling
1989-01-26 Well Log Performed
1989-01-26 Well Mode changed to Drilled and Cased
1989-01-27 Drill Stem Test Performed
1989-01-27 Well Log Performed
1989-01-28 Liner Casing Operation Performed
1989-01-28 Rig Released
1989-02-03 Well Log Performed
1989-02-04 Perforation Treatment Performed - Jet Perforation
1989-02-06 Well Log Performed
1989-02-07 Perforation Treatment Performed - Jet Perforation
1989-02-08 Well Began Production
1989-02-08 Well Fluid changed to Crude Oil
1989-02-08 Well Mode changed to Flowing
1989-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-30 Perforation Treatment Performed - Jet Perforation
1994-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-02 Well Fluid changed to Crude Oil
1994-12-02 Well Mode changed to Pumping
1995-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-27 Plug Back Performed
1995-07-27 Well Fluid changed to Crude Oil
1995-07-27 Well Mode changed to Abandoned
1995-08-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-01-11 801.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-04 Perforation 1537.00 1539.00 13
1989-02-07 Perforation 1541.00 1542.50 13
1989-09-12 Acid Treatment 1537.00 1542.50 0
1994-11-30 Perforation 1543.80 1546.80 13
1994-11-30 Perforation 1547.40 1552.70 13
1994-12-01 Acid Treatment 1543.80 1552.70 0
1995-07-27 Packing Device Capped w/Cement 1522.00 1530.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 6537 0.0 0.0 0.0
1990 7685 0.0 0.0 0.0
1991 1767 0.0 0.0 0.0
1994 112 0.0 0.0 0.0

For data sources see[6]

References