X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176051913000

Well Details

Well ID: 1176051913000
Loading map...
Location: 00/13-19-117-05W6/0
Location Alias: 00/13-19-17-05 W6M
Location Alias 2: 00/13-19-117-05 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 13-19-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0130182
License Date: 1987-11-19
License Status: Suspension
Spud Date: 1987-11-22
Final Drill Date: 1987-12-06
Well Total Depth: 1557.80 m
Surface Hole Latitude: 59.180901
Surface Hole Longitude: -118.847406

For data sources see[1][2]

Well History

Date Event
1987-11-19 Obtained License
1987-11-23 Lost Circulation Occurred
1987-11-24 Surface Casing Operation Performed
1987-12-03 Well Log Performed
1987-12-04 Intermediate Casing Operation Performed
1987-12-06 Finished Drilling
1987-12-06 Lost Circulation Occurred
1987-12-06 Well Mode changed to Drilled and Cased
1987-12-07 Well Log Performed
1987-12-08 Liner Casing Operation Performed
1987-12-08 Rig Released
1987-12-13 Well Log Performed
1987-12-14 Perforation Treatment Performed - Jet Perforation
1987-12-20 Well Began Production
1987-12-20 Well Fluid changed to Crude Oil
1987-12-20 Well Mode changed to Flowing
1987-12-31 Perforation Treatment Performed - Jet Perforation
1988-01-01 Perforation Treatment Performed - Jet Perforation
1988-10-29 Perforation Treatment Performed - Jet Perforation
1988-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-01 Well Fluid changed to Crude Oil
1988-11-01 Well Mode changed to Pumping
1995-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-20 Perforation Treatment Performed - Jet Perforation
1997-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-18 Plug Back Performed
1997-08-19 Perforation Treatment Performed - Jet Perforation
1997-08-19 Well Log Performed
1997-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Pumping
2007-04-03 Well Log Performed
2007-04-05 Well Log Performed
2007-04-07 Perforation Treatment Performed - Jet Perforation
2007-04-08 Perforation Treatment Performed - Remedial Casing
2010-12-01 Well Fluid changed to Crude Oil
2010-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-12-14 Perforation 1545.00 1546.00 13
1997-08-19 Perforation 1421.00 1422.00 13
1997-08-19 Perforation 1419.00 1419.50 13
1997-08-19 Perforation 1416.50 1418.00 13
1997-08-19 Perforation 1412.00 1413.00 13
1997-08-19 Perforation 1409.00 1411.00 13
1997-08-20 Acid Treatment 1409.00 1422.00 0
2007-04-07 Perforation 352.00 354.00 17
2007-04-08 Remedial Casing Cementing 352.00 354.00 0
1987-12-31 Perforation 1545.50 1546.50 13
1988-01-01 Perforation 1549.70 1550.70 13
1988-10-29 Perforation 1547.00 1551.50 13
1988-10-30 Acid Treatment 1545.00 1551.50 0
1995-07-20 Perforation 1535.00 1536.50 13
1995-07-20 Perforation 1538.00 1540.50 13
1995-07-20 Acid Treatment 1535.00 1551.50 0
1997-08-18 Packing Device Capped w/Cement 1522.00 1530.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 240 0.0 0.0 0.0
1988 6047 0.0 0.0 0.0
1989 6061 0.0 0.0 0.0
1990 7890 0.0 0.0 0.0
1991 8209 0.0 0.0 0.0
1992 8039 0.0 0.0 0.0
1993 7863 0.0 0.0 0.0
1994 8457 0.0 0.0 0.0
1995 7951 0.0 0.0 0.0
1996 7496 0.0 0.0 0.0
1997 1968 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-11-23 Lost Circulation 226.00 226.00
1987-12-06 Lost Circulation 1557.50 1557.50

For data sources see[6]

References