If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1176052004020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.169934,"lon":-118.821739,"icon":""}]} |
| Location: 02/04-20-117-05W6/0 | |
| Location Alias: 02/04-20-17-05 W6M | |
| Location Alias 2: 02/04-20-117-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 117 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 20 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL 102 KR ZAMA 4-20-117-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0156545 | |
| License Date: 1993-02-16 | |
| License Status: Abandoned | |
| Spud Date: 1993-02-27 | |
| Final Drill Date: 1993-03-09 | |
| Well Total Depth: 1535.00 m | |
| Surface Hole Latitude: 59.169934 | |
| Surface Hole Longitude: -118.821739 |
| Date | Event |
|---|---|
| 1993-02-16 | Obtained License |
| 1993-02-28 | Lost Circulation Occurred |
| 1993-02-28 | Surface Casing Operation Performed |
| 1993-03-05 | Well Log Performed |
| 1993-03-06 | Intermediate Casing Operation Performed |
| 1993-03-09 | Finished Drilling |
| 1993-03-09 | Liner Casing Operation Performed |
| 1993-03-09 | Well Log Performed |
| 1993-03-09 | Well Mode changed to Drilled and Cased |
| 1993-03-10 | Rig Released |
| 1993-03-29 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-04-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-04-01 | Perforation Treatment Performed - Jet Perforation |
| 1993-04-01 | Well Began Production |
| 1993-04-01 | Well Fluid changed to Crude Oil |
| 1993-04-01 | Well Mode changed to Flowing |
| 1994-12-05 | Perforation Treatment Performed - Jet Perforation |
| 1994-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-08-01 | Well Fluid changed to Crude Oil |
| 2004-08-01 | Well Mode changed to Suspended |
| 2009-03-22 | Well Log Performed |
| 2009-03-24 | Well Log Performed |
| 2009-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-25 | Perforation Treatment Performed - Cement Plug |
| 2009-03-25 | Plug Back Performed |
| 2009-03-25 | Well Fluid changed to Crude Oil |
| 2009-03-25 | Well Mode changed to Abandoned Zone |
| 2009-03-27 | Well Log Performed |
| 2009-03-28 | Perforation Treatment Performed - Jet Perforation |
| 2009-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-29 | Perforation Treatment Performed - Remedial Casing |
| 2009-03-29 | Well Log Performed |
| 2009-03-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-30 | Perforation Treatment Performed - Jet Perforation |
| 2009-04-03 | Well Abandoned |
| 2009-04-03 | Well Fluid changed to Crude Oil |
| 2009-04-03 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1993-03-29 | Perforation | 1520.00 | 1523.00 | 13 |
| 2009-03-28 | Perforation | 697.00 | 698.00 | 13 |
| 2009-03-29 | Remedial Casing Cementing | 697.00 | 698.00 | 0 |
| 2009-03-29 | Packing Device Capped w/Cement | 670.00 | 693.00 | 0 |
| 2009-03-30 | Perforation | 346.00 | 347.00 | 13 |
| 2009-03-30 | Packing Device Capped w/Cement | 332.00 | 340.00 | 0 |
| 1993-03-30 | Acid Treatment | 1520.00 | 1523.00 | 0 |
| 1993-04-01 | Perforation | 1525.00 | 1527.00 | 13 |
| 1993-04-01 | Acid Treatment | 1525.00 | 1527.00 | 0 |
| 1994-12-05 | Perforation | 1527.00 | 1529.00 | 13 |
| 1994-12-05 | Perforation | 1531.00 | 1533.00 | 13 |
| 1994-12-06 | Acid Treatment | 1527.00 | 1533.00 | 0 |
| 2009-03-25 | Packing Device Capped w/Cement | 1502.00 | 1510.00 | 0 |
| 2009-03-25 | Cement Plug | 1305.00 | 1424.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 5127 | 0.0 | 0.0 | 0.0 |
| 1994 | 8158 | 0.0 | 0.0 | 0.0 |
| 1995 | 8388 | 0.0 | 0.0 | 0.0 |
| 1996 | 8572 | 0.0 | 0.0 | 0.0 |
| 1997 | 372 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1993-02-28 | Lost Circulation | 286.00 | 286.00 |
For data sources see[6]