X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176052004020

Well Details

Well ID: 1176052004020
Loading map...
Location: 02/04-20-117-05W6/0
Location Alias: 02/04-20-17-05 W6M
Location Alias 2: 02/04-20-117-05 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 20
County/Municipality: Mackenzie County
Well Name: ACL 102 KR ZAMA 4-20-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0156545
License Date: 1993-02-16
License Status: Abandoned
Spud Date: 1993-02-27
Final Drill Date: 1993-03-09
Well Total Depth: 1535.00 m
Surface Hole Latitude: 59.169934
Surface Hole Longitude: -118.821739

For data sources see[1][2]

Well History

Date Event
1993-02-16 Obtained License
1993-02-28 Lost Circulation Occurred
1993-02-28 Surface Casing Operation Performed
1993-03-05 Well Log Performed
1993-03-06 Intermediate Casing Operation Performed
1993-03-09 Finished Drilling
1993-03-09 Liner Casing Operation Performed
1993-03-09 Well Log Performed
1993-03-09 Well Mode changed to Drilled and Cased
1993-03-10 Rig Released
1993-03-29 Perforation Treatment Performed - Jet Perforation
1993-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-01 Perforation Treatment Performed - Jet Perforation
1993-04-01 Well Began Production
1993-04-01 Well Fluid changed to Crude Oil
1993-04-01 Well Mode changed to Flowing
1994-12-05 Perforation Treatment Performed - Jet Perforation
1994-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-01 Well Fluid changed to Crude Oil
2004-08-01 Well Mode changed to Suspended
2009-03-22 Well Log Performed
2009-03-24 Well Log Performed
2009-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-25 Perforation Treatment Performed - Cement Plug
2009-03-25 Plug Back Performed
2009-03-25 Well Fluid changed to Crude Oil
2009-03-25 Well Mode changed to Abandoned Zone
2009-03-27 Well Log Performed
2009-03-28 Perforation Treatment Performed - Jet Perforation
2009-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-29 Perforation Treatment Performed - Remedial Casing
2009-03-29 Well Log Performed
2009-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-30 Perforation Treatment Performed - Jet Perforation
2009-04-03 Well Abandoned
2009-04-03 Well Fluid changed to Crude Oil
2009-04-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-29 Perforation 1520.00 1523.00 13
2009-03-28 Perforation 697.00 698.00 13
2009-03-29 Remedial Casing Cementing 697.00 698.00 0
2009-03-29 Packing Device Capped w/Cement 670.00 693.00 0
2009-03-30 Perforation 346.00 347.00 13
2009-03-30 Packing Device Capped w/Cement 332.00 340.00 0
1993-03-30 Acid Treatment 1520.00 1523.00 0
1993-04-01 Perforation 1525.00 1527.00 13
1993-04-01 Acid Treatment 1525.00 1527.00 0
1994-12-05 Perforation 1527.00 1529.00 13
1994-12-05 Perforation 1531.00 1533.00 13
1994-12-06 Acid Treatment 1527.00 1533.00 0
2009-03-25 Packing Device Capped w/Cement 1502.00 1510.00 0
2009-03-25 Cement Plug 1305.00 1424.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5127 0.0 0.0 0.0
1994 8158 0.0 0.0 0.0
1995 8388 0.0 0.0 0.0
1996 8572 0.0 0.0 0.0
1997 372 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-02-28 Lost Circulation 286.00 286.00

For data sources see[6]

References