X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176052904000

Well Details

Well ID: 1176052904000
Loading map...
Location: 00/04-29-117-05W6/0
Location Alias: 00/04-29-17-05 W6M
Location Alias 2: 00/04-29-117-05 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 29
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 4-29-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0136933
License Date: 1988-10-13
License Status: Suspension
Spud Date: 1988-10-28
Final Drill Date: 1988-11-14
Well Total Depth: 1575.00 m
Surface Hole Latitude: 59.186635
Surface Hole Longitude: -118.823777

For data sources see[1][2]

Well History

Date Event
1988-10-13 Obtained License
1988-10-29 Surface Casing Operation Performed
1988-11-08 Well Log Performed
1988-11-09 Intermediate Casing Operation Performed
1988-11-13 Lost Circulation Occurred
1988-11-14 Finished Drilling
1988-11-14 Well Log Performed
1988-11-14 Well Mode changed to Drilled and Cased
1988-11-15 Liner Casing Operation Performed
1988-11-15 Rig Released
1988-11-21 Perforation Treatment Performed - Jet Perforation
1988-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-23 Well Began Production
1988-11-23 Well Fluid changed to Crude Oil
1988-11-23 Well Mode changed to Pumping
1988-12-02 Perforation Treatment Performed - Jet Perforation
1988-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-12-03 Perforation Treatment Performed - Cement Squeeze
1988-12-05 Perforation Treatment Performed - Jet Perforation
1991-01-09 Perforation Treatment Performed - Cement Squeeze
1991-01-09 Plug Back Performed
1991-02-20 Plug Back Performed
1991-02-23 Well Fluid changed to Crude Oil
1991-02-23 Well Mode changed to Abandoned and Whipstocked
1999-11-27 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-11-21 Perforation 1537.00 1544.00 13
1988-11-23 Acid Treatment 1537.00 1544.00 0
1988-12-02 Perforation 1551.50 1552.50 13
1988-12-03 Cement Squeeze 1551.50 1552.50 0
1988-12-03 Packing Device Capped w/Cement 1541.00 1549.50 0
1988-12-05 Perforation 1537.50 1539.00 13
1991-01-09 Cement Squeeze 1537.50 1539.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 470 0.0 0.0 0.0
1989 1939 0.0 0.0 0.0
1990 4243 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-11-13 Lost Circulation 1550.00 1573.40

For data sources see[6]

References