X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176053413002

Well Details

Well ID: 1176053413002
Loading map...
Location: 00/13-34-117-05W6/2
Location Alias: 00/13-34-17-05 W6M
Location Alias 2: 00/13-34-117-05 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 05
Section: 34
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 13-34-117-5
Operator Name: Paramount Resources Ltd.
License Number: 0031398
License Date: 1966-12-01
License Status: Abandoned
Spud Date: 1966-12-08
Final Drill Date: 1967-01-27
Well Total Depth: 1724.30 m
Surface Hole Latitude: 59.210858
Surface Hole Longitude: -118.763904

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-01 Obtained License
1966-12-25 Drill Stem Test Performed
1966-12-28 Drill Stem Test Performed
1966-12-30 Drill Stem Test Performed
1967-01-02 Drill Stem Test Performed
1967-01-11 Drill Stem Test Performed
1967-01-17 Drill Stem Test Performed
1967-01-18 Drill Stem Test Performed
1967-01-19 Drill Stem Test Performed
1967-01-22 Drill Stem Test Performed
1967-01-23 Drill Stem Test Performed
1967-01-24 Drill Stem Test Performed
1967-01-27 Finished Drilling
1967-01-27 Well Mode changed to Drilled and Cased
1967-01-29 Liner Casing Operation Performed
1967-02-12 Perforation Treatment Performed - Jet Perforation
1967-07-04 Perforation Treatment Performed - Jet Perforation
1995-05-11 Well Log Performed
1995-05-13 Well Log Performed
1995-05-15 Perforation Treatment Performed - Cement Squeeze
1995-05-16 Well Log Performed
1995-05-17 Perforation Treatment Performed - Jet Perforation
1995-05-17 Well Log Performed
1995-05-19 Perforation Treatment Performed - Cement Squeeze
1995-05-22 Well Log Performed
1995-05-23 Perforation Treatment Performed - Jet Perforation
1995-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-08-02 Well Log Performed
2001-07-09 Perforation Treatment Performed - Jet Perforation
2001-07-09 Well Log Performed
2001-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-31 Well Began Production
2001-10-31 Well Fluid changed to Gas
2001-10-31 Well Mode changed to Flowing
2002-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-02 Perforation Treatment Performed - Jet Perforation
2004-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-18 Well Log Performed
2010-01-21 Perforation Treatment Performed - Cement Squeeze
2010-01-21 Plug Back Performed
2010-01-21 Well Fluid changed to Gas
2010-01-21 Well Mode changed to Abandoned Zone
2010-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-03 Plug Back Performed
2010-02-04 Well Log Performed
2010-02-05 Well Log Performed
2010-02-06 Perforation Treatment Performed - Jet Perforation
2010-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-07 Perforation Treatment Performed - Remedial Casing
2010-02-07 Well Log Performed
2010-02-08 Perforation Treatment Performed - Jet Perforation
2010-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-10 Perforation Treatment Performed - Remedial Casing
2010-02-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-12 Perforation 1597.20 1600.20 7
1995-05-23 Perforation 1516.50 1521.00 13
1995-05-23 Perforation 1510.50 1512.50 13
1995-05-25 Acid Treatment 1510.50 1512.50 0
2001-07-09 Perforation 1346.00 1349.00 13
2001-07-09 Perforation 1352.00 1355.50 13
2001-07-09 Perforation 1360.00 1363.00 13
2001-07-10 Acid Treatment 1346.00 1363.00 0
2002-10-04 Acid Treatment 1346.00 1363.00 0
2004-11-02 Perforation 1412.40 1417.90 13
2004-11-06 Acid Treatment 1412.40 1417.90 0
1967-07-04 Perforation 1528.00 1529.50 13
2004-11-18 Acid Treatment 1412.40 1417.90 0
2010-01-21 Cement Squeeze 1346.00 1363.00 0
2010-01-21 Cement Squeeze 1412.40 1417.90 0
2010-02-03 Packing Device Capped w/Cement 1415.90 1505.10 0
2010-02-06 Perforation 708.00 709.00 17
2010-02-07 Packing Device Capped w/Cement 690.00 706.00 0
2010-02-07 Remedial Casing Cementing 708.00 709.00 0
2010-02-08 Perforation 354.50 355.50 17
2010-02-10 Remedial Casing Cementing 354.50 355.50 0
2010-02-10 Packing Device Capped w/Cement 341.00 349.90 0
1967-07-04 Perforation 1535.60 1536.80 13
1967-07-04 Perforation 1546.20 1548.70 13
1995-05-15 Cement Squeeze 1528.00 1546.70 0
1995-05-17 Perforation 1526.40 1526.90 13
1995-05-17 Perforation 1524.50 1525.00 13
1995-05-19 Cement Squeeze 1524.50 1526.90 0
1995-05-23 Perforation 1522.00 1524.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1456 0.0 0.0 0.0
2002 5607 0.0 0.0 0.0
2004 3788 0.0 0.0 0.0

For data sources see[5]

References