X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176060206000

Well Details

Well ID: 1176060206000
Loading map...
Location: 00/06-02-117-06W6/0
Location Alias: 00/06-02-17-06 W6M
Location Alias 2: 00/06-02-117-06 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 06
Section: 02
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 6-2-117-6
Operator Name: Paramount Resources Ltd.
License Number: 0210851
License Date: 1997-12-18
License Status: Abandoned
Spud Date: 1998-01-07
Final Drill Date: 1998-01-15
Well Total Depth: 1520.00 m
Surface Hole Latitude: 59.131348
Surface Hole Longitude: -118.900748

For data sources see[1][2]

Well History

Date Event
1997-12-18 Obtained License
1998-01-08 Surface Casing Operation Performed
1998-01-09 Direction Drilling Operation Performed - Deviate
1998-01-15 Finished Drilling
1998-01-15 Well Log Performed
1998-01-15 Well Mode changed to Drilled and Cased
1998-01-17 Production Casing Operation Performed
1998-01-17 Rig Released
1998-01-21 Well Log Performed
1998-01-24 Perforation Treatment Performed - Open-Hole Completion
1998-01-24 Well Log Performed
1998-01-26 Well Log Performed
1998-03-06 Well Began Production
1998-03-06 Well Fluid changed to Gas
1998-03-06 Well Mode changed to Flowing
1998-05-29 Perforation Treatment Performed - Open-Hole Completion
1999-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-22 Perforation Treatment Performed - Jet Perforation
1999-02-22 Plug Back Performed
1999-02-22 Well Fluid changed to Gas
1999-02-22 Well Log Performed
1999-02-22 Well Mode changed to Abandoned Zone
1999-02-23 Well Log Performed
1999-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-24 Perforation Treatment Performed - Jet Perforation
1999-02-24 Plug Back Performed
2010-10-16 Well Log Performed
2010-10-17 Well Log Performed
2010-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-18 Perforation Treatment Performed - Jet Perforation
2010-10-18 Plug Back Performed
2010-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-19 Well Log Performed
2010-10-20 Perforation Treatment Performed - Jet Perforation
2010-10-20 Perforation Treatment Performed - Remedial Casing
2010-10-20 Well Log Performed
2010-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-21 Perforation Treatment Performed - Jet Perforation
2010-10-21 Well Log Performed
2010-10-22 Perforation Treatment Performed - Jet Perforation
2010-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-23 Perforation Treatment Performed - Remedial Casing
2010-10-25 Well Log Performed
2010-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-26 Perforation Treatment Performed - Jet Perforation
2010-10-27 Perforation Treatment Performed - Remedial Casing
2010-10-28 Well Log Performed
2010-10-29 Perforation Treatment Performed - Jet Perforation
2010-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-30 Perforation Treatment Performed - Remedial Casing
2010-11-01 Well Log Performed
2010-11-02 Perforation Treatment Performed - Jet Perforation
2010-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-11-04 Perforation Treatment Performed - Remedial Casing
2010-11-06 Well Log Performed
2010-11-07 Perforation Treatment Performed - Jet Perforation
2010-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-11-08 Perforation Treatment Performed - Remedial Casing
2010-11-14 Well Log Performed
2010-11-15 Well Log Performed
2010-11-16 Well Log Performed
2010-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-11-17 Perforation Treatment Performed - Jet Perforation
2010-11-18 Perforation Treatment Performed - Remedial Casing
2010-11-19 Well Log Performed
2010-11-20 Perforation Treatment Performed - Jet Perforation
2010-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-11-24 Perforation Treatment Performed - Remedial Casing
2010-11-30 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-01-09 355.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-01-24 Open Hole/Barefoot Completion 1486.00 1510.00 0
1999-02-24 Perforation 1324.00 1329.00 14
1999-02-24 Acid Treatment 1324.00 1329.00 0
2010-10-18 Packing Device Capped w/Cement 1307.00 1315.00 0
2010-10-18 Perforation 1104.50 1105.50 17
2010-10-19 Acid Treatment 1104.50 1105.50 0
2010-10-20 Remedial Casing Cementing 1104.50 1105.50 0
2010-10-20 Perforation 687.00 688.00 17
2010-10-21 Perforation 452.00 453.00 17
2010-10-21 Perforation 523.00 524.00 17
2010-10-21 Packing Device Capped w/Cement 678.00 686.00 0
1998-05-29 Open Hole/Barefoot Completion 1486.00 1520.00 0
2010-10-21 Packing Device Capped w/Cement 510.00 518.00 0
2010-10-22 Perforation 452.00 452.90 99
2010-10-23 Packing Device Capped w/Cement 441.00 449.00 0
2010-10-23 Remedial Casing Cementing 452.00 453.00 0
2010-10-26 Perforation 369.50 370.50 17
2010-10-26 Acid Treatment 369.50 370.50 0
2010-10-27 Remedial Casing Cementing 369.50 370.50 0
2010-10-29 Perforation 357.00 358.00 17
2010-10-29 Perforation 357.00 357.90 99
2010-10-30 Acid Treatment 357.00 358.00 0
1999-02-22 Packing Device Capped w/Cement 1474.00 1482.00 0
2010-10-30 Remedial Casing Cementing 357.00 358.00 0
2010-11-02 Perforation 335.00 335.90 99
2010-11-02 Perforation 335.00 336.00 17
2010-11-03 Acid Treatment 335.00 336.00 0
2010-11-04 Remedial Casing Cementing 335.00 336.00 0
2010-11-07 Perforation 290.00 291.00 17
2010-11-07 Perforation 290.00 291.00 99
2010-11-08 Remedial Casing Cementing 290.00 291.00 0
2010-11-08 Acid Treatment 290.00 291.00 0
2010-11-17 Perforation 226.00 227.00 17
1999-02-22 Perforation 1382.50 1383.50 14
2010-11-17 Acid Treatment 226.00 227.00 0
2010-11-18 Remedial Casing Cementing 226.00 227.00 0
2010-11-20 Perforation 203.50 204.50 99
2010-11-20 Perforation 203.50 204.50 17
2010-11-21 Acid Treatment 203.50 204.50 0
2010-11-24 Remedial Casing Cementing 203.50 204.50 0
1999-02-22 Perforation 1385.50 1387.00 14
1999-02-22 Perforation 1388.50 1389.50 14
1999-02-22 Perforation 1396.00 1397.00 14
1999-02-22 Acid Treatment 1382.50 1397.00 0
1999-02-24 Packing Device Capped w/Cement 1367.00 1375.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5062 0.0 0.0 0.0
1999 680 0.0 0.0 0.0

For data sources see[6]

References