X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176073105000

Well Details

Well ID: 1176073105000
Loading map...
Location: 00/05-31-117-07W6/0
Location Alias: 00/05-31-17-07 W6M
Location Alias 2: 00/05-31-117-07 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 07
Section: 31
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 5-31-117-7
Operator Name: Paramount Resources Ltd.
License Number: 0143407
License Date: 1990-02-23
License Status: Abandoned
Spud Date: 1990-03-02
Final Drill Date: 1990-03-24
Well Total Depth: 1825.00 m
Surface Hole Latitude: 59.202720
Surface Hole Longitude: -119.190441

For data sources see[1][2]

Well History

Date Event
1990-02-23 Obtained License
1990-03-04 Surface Casing Operation Performed
1990-03-14 Well Log Performed
1990-03-15 Drill Stem Test Performed
1990-03-15 Well Log Performed
1990-03-16 Drill Stem Test Performed
1990-03-17 Production Casing Operation Performed
1990-03-24 Finished Drilling
1990-03-25 Well Log Performed
1990-03-26 Plug Back Performed
1990-03-27 Plug Back Performed
1990-03-27 Rig Released
1990-03-27 Well Mode changed to Drilled and Cased
1990-04-09 Well Log Performed
1990-04-17 Well Log Performed
1992-08-11 Well Log Performed
1992-08-18 Perforation Treatment Performed - Open-Hole Completion
1992-08-20 Well Log Performed
1992-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-08-25 Well Log Performed
1993-01-04 Liner Casing Operation Performed
1993-01-04 Perforation Treatment Performed - Cement Squeeze
1993-01-04 Perforation Treatment Performed - Open-Hole Completion
1993-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-14 Well Began Injection
1994-01-14 Well Fluid changed to Water
1994-01-14 Well Type changed to Injection
2000-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-10-24 Well Fluid changed to Water
2016-10-24 Well Mode changed to Suspended
2016-10-24 Well Type changed to Injection
2017-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-27 Perforation Treatment Performed - Cement Squeeze
2017-03-27 Plug Back Performed
2017-03-27 Well Fluid changed to Water
2017-03-27 Well Mode changed to Abandoned Zone
2017-03-27 Well Type changed to Injection
2017-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-30 Perforation Treatment Performed - Jet Perforation
2017-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-04-01 Perforation Treatment Performed - Jet Perforation
2017-04-01 Perforation Treatment Performed - Remedial Casing
2017-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-04-02 Perforation Treatment Performed - Jet Perforation
2017-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-04-03 Perforation Treatment Performed - Remedial Casing
2017-05-30 Well Abandoned
2017-05-30 Well Fluid changed to Water
2017-05-30 Well Mode changed to Abandoned
2017-05-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-08-18 Open Hole/Barefoot Completion 1612.00 1808.50 0
2017-03-30 Packing Device Capped w/Cement 1280.00 1288.00 0
2017-03-30 Perforation 840.00 841.00 99
2017-03-31 Acid Treatment 840.00 841.00 0
2017-04-01 Remedial Casing Cementing 840.00 841.00 0
2017-04-01 Packing Device Capped w/Cement 824.30 834.80 0
2017-04-01 Perforation 479.00 480.00 20
2017-04-02 Perforation 479.00 480.00 99
2017-04-02 Acid Treatment 479.00 480.00 0
2017-04-03 Remedial Casing Cementing 479.00 480.00 0
2017-04-03 Packing Device Capped w/Cement 465.80 473.80 0
1992-08-21 Acid Treatment 1715.50 1718.50 0
1993-01-04 Cement Squeeze 1612.00 1745.00 0
1993-01-04 Open Hole/Barefoot Completion 1745.00 1808.50 0
1993-01-10 Acid Treatment 1745.00 1808.50 0
2000-03-22 Acid Treatment 1745.00 1808.50 0
2017-03-27 Cement Squeeze 1745.00 1808.50 0
2017-03-27 Packing Device Capped w/Cement 1529.00 1713.80 0
2017-03-29 Packing Device Capped w/Cement 1467.00 1475.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-31 No Incident Encountered 0.00 0.00

For data sources see[6]

References