X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176083216000

Well Details

Well ID: 1176083216000
Loading map...
Location: 00/16-32-117-08W6/0
Location Alias: 00/16-32-17-08 W6M
Location Alias 2: 00/16-32-117-08 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 08
Section: 32
County/Municipality: Mackenzie County
Well Name: ACL ET AL SHEKILIE 16-32-117-8
Operator Name: Paramount Resources Ltd.
License Number: 0090512
License Date: 1981-06-04
License Status: Suspension
Spud Date: 1981-06-09
Final Drill Date: 1981-07-27
Well Total Depth: 1867.00 m
Surface Hole Latitude: 59.209452
Surface Hole Longitude: -119.311996

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-04 Obtained License
1981-06-12 Surface Casing Operation Performed
1981-06-28 Intermediate Casing Operation Performed
1981-07-01 Lost Circulation Occurred
1981-07-05 Drill Stem Test Performed
1981-07-06 Kick Occurred
1981-07-06 Lost Circulation Occurred
1981-07-27 Finished Drilling
1981-07-27 Well Mode changed to Drilled and Cased
1981-07-29 Lost Circulation Occurred
1981-07-31 Production Casing Operation Performed
1981-08-01 Lost Circulation Occurred
1981-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-19 Perforation Treatment Performed - Jet Perforation
1981-08-26 Well Began Production
1981-08-26 Well Fluid changed to Crude Oil
1981-08-26 Well Mode changed to Flowing
1981-08-29 Perforation Treatment Performed - Jet Perforation
1981-09-13 Perforation Treatment Performed - Cement Squeeze
1981-09-15 Perforation Treatment Performed - Jet Perforation
1981-12-13 Perforation Treatment Performed - Selective Jet Perforations
1981-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-17 Perforation Treatment Performed - Remedial Casing
1981-12-20 Perforation Treatment Performed - Jet Perforation
1981-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-27 Perforation Treatment Performed - Jet Perforation
1983-07-28 Perforation Treatment Performed - Cement Squeeze
1983-07-29 Perforation Treatment Performed - Jet Perforation
1985-05-24 Well Fluid changed to Crude Oil
1985-05-24 Well Mode changed to Pumping
1990-06-09 Well Log Performed
1990-06-11 Perforation Treatment Performed - Jet Perforation
1990-07-29 Well Log Performed
1990-07-30 Perforation Treatment Performed - Jet Perforation
1997-02-23 Perforation Treatment Performed - Jet Perforation
1997-02-24 Perforation Treatment Performed - Cement Squeeze
1997-02-27 Perforation Treatment Performed - Jet Perforation
1998-02-23 Well Log Performed
1998-02-27 Well Log Performed
2003-01-01 Well Fluid changed to Crude Oil
2003-01-01 Well Mode changed to Suspended
2004-12-16 Well Fluid changed to Crude Oil
2004-12-16 Well Mode changed to Pumping
2013-07-23 Well Fluid changed to Crude Oil
2013-07-23 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-19 Perforation 1742.70 1743.00 12
1981-12-20 Perforation 1724.00 1726.00 7
1981-12-22 Acid Treatment 1724.00 1726.00 0
1982-01-27 Perforation 1721.00 1724.00 7
1982-01-27 Acid Treatment 1721.00 1726.00 0
1983-07-28 Cement Squeeze 1721.00 1726.00 0
1983-07-29 Perforation 1706.00 1710.00 7
1990-06-11 Perforation 1692.00 1698.00 14
1990-07-30 Perforation 1700.00 1703.00 14
1997-02-23 Perforation 1692.00 1698.00 13
1997-02-24 Cement Squeeze 1692.00 1698.00 0
1981-08-19 Perforation 1742.20 1742.50 12
1997-02-24 Cement Squeeze 1700.00 1703.00 0
1997-02-24 Cement Squeeze 1706.00 1710.00 0
1997-02-27 Perforation 1692.00 1693.00 13
1997-02-27 Perforation 1685.00 1689.00 13
1997-02-27 Perforation 1682.00 1684.00 13
1981-08-19 Acid Treatment 1742.20 1743.00 0
1981-08-29 Perforation 1738.00 1742.20 7
1981-09-13 Cement Squeeze 1738.00 1743.00 0
1981-09-15 Perforation 1735.00 1738.00 7
1981-12-13 Selective Jet Perforations 1720.50 1720.50 0
1981-12-14 Acid Treatment 1720.50 1720.50 0
1981-12-17 Remedial Casing Cementing 1720.50 1720.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 2211 0.0 0.0 0.0
1982 6905 0.0 0.0 0.0
1983 7357 0.0 0.0 0.0
1984 7812 0.0 0.0 0.0
1985 8178 0.0 0.0 0.0
1986 7496 0.0 0.0 0.0
1987 7961 0.0 0.0 0.0
1988 8135 0.0 0.0 0.0
1989 7389 0.0 0.0 0.0
1990 5841 0.0 0.0 0.0
1991 7276 0.0 0.0 0.0
1992 7952 0.0 0.0 0.0
1993 6316 0.0 0.0 0.0
1994 3954 0.0 0.0 0.0
1998 3862 0.0 0.0 0.0
1999 7615 0.0 0.0 0.0
2000 5584 0.0 0.0 0.0
2001 7578 0.0 0.0 0.0
2002 2253 0.0 0.0 0.0
2004 360 0.0 0.0 0.0
2005 8033 0.0 0.0 0.0
2006 8448 0.0 0.0 0.0
2007 6925 0.0 0.0 0.0
2008 8079 0.0 0.0 0.0
2009 5742 0.0 0.0 0.0
2010 7866 0.0 0.0 0.0
2011 6019 0.0 0.0 0.0
2012 3987 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-07-01 Lost Circulation 1553.00 1553.00
1981-07-06 Kick 1733.00 1733.00
1981-07-06 Lost Circulation 1733.00 1733.00
1981-07-29 Lost Circulation 1867.00 1867.00
1981-08-01 Lost Circulation 1867.00 1867.00

For data sources see[6]

References