Well Details

Well ID: 1176091904000
Loading map...
Location: 00/04-19-117-09W6/0
Location Alias: 00/04-19-17-09 W6M
Location Alias 2: 00/04-19-117-09 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 09
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 4-19-117-9
Operator Name: Paramount Resources Ltd.
License Number: 0033830
License Date: 1968-03-05
License Status: Abandoned
Spud Date: 1968-03-06
Final Drill Date: 1968-05-04
Well Total Depth: 1938.50 m
Surface Hole Latitude: 59.171541
Surface Hole Longitude: -119.530654

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-03-05 Obtained License
1968-03-06 Direction Drilling Operation Performed - 98
1968-04-20 Production Casing Operation Performed
1968-04-23 Drill Stem Test Performed
1968-04-25 Drill Stem Test Performed
1968-05-02 Drill Stem Test Performed
1968-05-04 Finished Drilling
1968-05-04 Perforation Treatment Performed - Open-Hole Completion
1968-05-07 Drill Stem Test Performed
1969-06-30 Well Mode changed to Drilled and Cased
1971-01-07 Well Log Performed
1971-01-11 Perforation Treatment Performed - Jet Perforation
1971-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-01-14 Perforation Treatment Performed - Cement Squeeze
1971-01-18 Perforation Treatment Performed - Cement Squeeze
1990-03-29 Well Log Performed
1990-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-04-01 Plug Back Performed
1990-04-01 Well Mode changed to Abandoned Zone
2004-01-10 Well Log Performed
2004-02-07 Well Log Performed
2004-02-08 Perforation Treatment Performed - Jet Perforation
2004-02-08 Perforation Treatment Performed - Remedial Casing
2004-02-12 Well Log Performed
2004-02-13 Perforation Treatment Performed - Jet Perforation
2004-02-18 Perforation Treatment Performed - Fractured
2010-03-03 Well Log Performed
2010-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-04 Plug Back Performed
2010-03-11 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1968-03-06 1341.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-05-04 Open Hole/Barefoot Completion 1588.00 1607.50 0
2004-02-08 Remedial Casing Cementing 454.90 485.50 0
2004-02-13 Perforation 462.50 465.00 17
2004-02-18 Fracture 462.50 465.00 0
2010-03-04 Packing Device Capped w/Cement 470.00 478.00 0
2010-03-04 Packing Device Capped w/Cement 441.00 449.00 0
1971-01-11 Perforation 673.60 681.20 7
1971-01-11 Perforation 650.70 664.50 7
1971-01-12 Acid Treatment 650.70 681.20 0
1971-01-14 Cement Squeeze 650.70 681.20 0
1971-01-18 Cement Squeeze 650.70 681.20 0
1990-04-01 Packing Device Capped w/Cement 1557.00 1565.00 0
2004-02-08 Perforation 454.90 455.20 36
2004-02-08 Perforation 484.50 485.50 36

For data sources see[5]