X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186031814002

Well Details

Well ID: 1186031814002
Loading map...
Location: 00/14-18-118-03W6/2
Location Alias: 00/14-18-18-03 W6M
Location Alias 2: 00/14-18-118-03 W6/02
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 03
Section: 18
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 14-18-118-3
Operator Name: Paramount Resources Ltd.
License Number: 0034282
License Date: 1968-06-14
License Status: Abandoned
Spud Date: 1968-09-29
Final Drill Date: 1968-10-11
Well Total Depth: 1508.80 m
Surface Hole Latitude: 59.253714
Surface Hole Longitude: -118.502588

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-14 Obtained License
1968-10-11 Finished Drilling
1968-10-11 Well Mode changed to Drilled and Cased
1968-10-13 Drill Stem Test Performed
1968-10-14 Production Casing Operation Performed
1968-10-15 Perforation Treatment Performed - Jet Perforation
1968-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-19 Perforation Treatment Performed - Cement Squeeze
1968-11-21 Perforation Treatment Performed - Jet Perforation
1968-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-15 Perforation Treatment Performed - Jet Perforation
1980-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-07 Perforation Treatment Performed - Jet Perforation
1996-03-31 Perforation Treatment Performed - Jet Perforation
1996-03-31 Well Log Performed
1996-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-13 Perforation Treatment Performed - Jet Perforation
2002-02-13 Plug Back Performed
2002-02-13 Well Log Performed
2002-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-10 Well Began Production
2002-03-10 Well Fluid changed to Gas
2002-03-10 Well Mode changed to Flowing
2004-05-16 Well Log Performed
2004-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-20 Well Log Performed
2008-09-16 Perforation Treatment Performed - Cement Squeeze
2008-09-16 Plug Back Performed
2008-09-16 Well Fluid changed to Gas
2008-09-16 Well Mode changed to Abandoned Zone
2008-09-19 Perforation Treatment Performed - Jet Perforation
2010-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-29 Perforation Treatment Performed - Jet Perforation
2010-01-29 Plug Back Performed
2010-01-29 Well Log Performed
2010-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-31 Perforation Treatment Performed - Jet Perforation
2010-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-01 Perforation Treatment Performed - Jet Perforation
2010-02-01 Perforation Treatment Performed - Remedial Casing
2010-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-02 Perforation Treatment Performed - Remedial Casing
2010-02-21 Well Abandoned
2010-02-21 Well Fluid changed to Gas
2010-02-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-15 Perforation 1437.40 1439.30 7
1995-06-07 Perforation 1442.60 1444.10 13
1995-06-07 Acid Treatment 1437.40 1444.10 0
1996-03-31 Perforation 1424.60 1427.60 20
1996-04-02 Acid Treatment 1424.60 1439.30 0
2002-02-13 Packing Device Capped w/Cement 1418.00 1420.00 0
2002-02-13 Perforation 1326.50 1327.70 13
2002-02-13 Perforation 1328.90 1329.50 13
2002-02-13 Perforation 1330.80 1331.70 13
2002-02-14 Acid Treatment 1326.50 1331.70 0
2004-05-19 Acid Treatment 1326.50 1329.50 0
1968-10-15 Perforation 1447.80 1449.60 7
2008-09-16 Cement Squeeze 1326.50 1331.70 0
2008-09-19 Perforation 1424.60 1427.60 20
2008-09-19 Perforation 1437.40 1444.10 13
2010-01-29 Packing Device Capped w/Cement 1409.00 1417.00 0
2010-01-29 Perforation 1258.00 1259.00 17
2010-01-31 Packing Device Capped w/Cement 1242.00 1250.00 0
2010-01-31 Perforation 620.00 621.00 17
2010-02-01 Remedial Casing Cementing 620.00 621.00 0
2010-02-01 Packing Device Capped w/Cement 608.00 618.00 0
2010-02-01 Perforation 297.00 298.00 17
1968-10-16 Acid Treatment 1447.80 1449.60 0
2010-02-02 Acid Treatment 297.00 298.00 0
2010-02-02 Remedial Casing Cementing 297.00 298.00 0
2010-02-02 Packing Device Capped w/Cement 283.00 293.00 0
1968-11-19 Cement Squeeze 1437.40 1449.60 0
1968-11-21 Perforation 1463.00 1464.00 13
1968-11-22 Acid Treatment 1463.00 1464.00 0
1980-12-15 Perforation 1459.50 1461.00 6
1980-12-16 Acid Treatment 1459.50 1461.00 0
1995-06-07 Perforation 1437.40 1439.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6886 0.0 0.0 0.0
2003 8583 0.0 0.0 0.0
2004 6107 0.0 0.0 0.0
2005 4416 0.0 0.0 0.0
2006 6574 0.0 0.0 0.0
2007 7887 0.0 0.0 0.0
2008 2590 0.0 0.0 0.0

For data sources see[5]

References