X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186032909000

Well Details

Well ID: 1186032909000
Loading map...
Location: 00/09-29-118-03W6/0
Location Alias: 00/09-29-18-03 W6M
Location Alias 2: 00/09-29-118-03 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 03
Section: 29
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 9-29-118-3
Operator Name: Paramount Resources Ltd.
License Number: 0161283
License Date: 1993-09-30
License Status: Abandoned
Spud Date: 1994-02-23
Final Drill Date: 1994-03-02
Well Total Depth: 1536.00 m
Surface Hole Latitude: 59.279408
Surface Hole Longitude: -118.460365

For data sources see[1][2]

Well History

Date Event
1993-09-30 Obtained License
1994-02-24 Surface Casing Operation Performed
1994-02-28 Direction Drilling Operation Performed - Deviate
1994-03-02 Finished Drilling
1994-03-03 Well Log Performed
1994-03-04 Production Casing Operation Performed
1994-03-04 Rig Released
1994-03-14 Perforation Treatment Performed - Open-Hole Completion
1994-03-14 Well Log Performed
1994-03-14 Well Mode changed to Drilled and Cased
1994-03-15 Drill Stem Test Performed
1994-03-17 Perforation Treatment Performed - Cement Plug
1994-03-17 Perforation Treatment Performed - Open-Hole Completion
1994-03-17 Plug Back Performed
1994-06-24 Well Began Production
1994-06-24 Well Fluid changed to Crude Oil
1994-06-24 Well Mode changed to Pumping
1995-06-01 Well Fluid changed to Crude Oil
1995-06-01 Well Mode changed to Suspended
2002-09-07 Well Log Performed
2002-09-08 Well Fluid changed to Crude Oil
2002-09-08 Well Log Performed
2002-09-08 Well Mode changed to Abandoned and Whipstocked
2008-02-02 Well Log Performed
2008-02-03 Well Log Performed
2008-02-20 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-02-28 1177.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-14 Open Hole/Barefoot Completion 1393.00 1536.00 0
1994-03-17 Cement Plug 1405.00 1536.00 0
1994-03-17 Open Hole/Barefoot Completion 1393.00 1405.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3774 0.0 0.0 0.0
1995 2260 0.0 0.0 0.0

For data sources see[6]

References