X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186033110003

Well Details

Well ID: 1186033110003
Loading map...
Location: 00/10-31-118-03W6/3
Location Alias: 00/10-31-18-03 W6M
Location Alias 2: 00/10-31-118-03 W6/03
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 03
Section: 31
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-31-118-3
Operator Name: Paramount Resources Ltd.
License Number: 0165418
License Date: 1994-02-25
License Status: Abandoned
Spud Date: 2005-01-14
Final Drill Date: 2005-01-20
Well Total Depth: 1629.00 m
Surface Hole Latitude: 59.295229
Surface Hole Longitude: -118.492292

For data sources see[1][2]

Well History

Date Event
1994-02-25 Obtained License
2005-01-20 Finished Drilling
2005-01-20 Well Mode changed to Drilled and Cased
2005-01-21 Perforation Treatment Performed - Jet Perforation
2005-01-23 Perforation Treatment Performed - Cement Squeeze
2005-01-23 Rig Released
2005-01-29 Well Log Performed
2005-01-30 Perforation Treatment Performed - Jet Perforation
2005-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-12 Well Began Production
2005-10-12 Well Fluid changed to Gas
2005-10-12 Well Mode changed to Flowing
2006-02-09 Well Fluid changed to Gas
2006-02-09 Well Mode changed to Flowing
2009-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-13 Plug Back Performed
2009-03-13 Well Fluid changed to Gas
2009-03-13 Well Mode changed to Abandoned Zone
2009-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-15 Perforation Treatment Performed - Jet Perforation
2009-03-15 Well Log Performed
2009-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-16 Perforation Treatment Performed - Jet Perforation
2009-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-17 Perforation Treatment Performed - Remedial Casing
2009-08-18 Well Abandoned
2009-08-18 Well Fluid changed to Gas
2009-08-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-21 Perforation 1466.00 1467.00 13
2009-03-16 Packing Device Capped w/Cement 734.00 742.00 0
2009-03-16 Perforation 432.00 433.00 20
2009-03-17 Remedial Casing Cementing 432.00 433.00 0
2009-03-17 Packing Device Capped w/Cement 407.00 422.50 0
2005-01-23 Cement Squeeze 1466.00 1467.00 0
2005-01-30 Perforation 1463.50 1467.00 13
2005-01-30 Perforation 1404.00 1407.00 13
2005-01-31 Acid Treatment 1463.50 1467.00 0
2005-02-03 Acid Treatment 1404.00 1407.00 0
2009-03-13 Packing Device Capped w/Cement 1324.60 1459.00 0
2009-03-15 Perforation 745.00 746.00 17
2009-03-15 Acid Treatment 745.00 746.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1933 0.0 0.0 0.0
2006 5107 0.0 0.0 0.0
2007 1596 0.0 0.0 0.0

For data sources see[5]

References