If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1186033212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.295531,"lon":-118.481737,"icon":""}]} |
| Location: 00/12-32-118-03W6/0 | |
| Location Alias: 00/12-32-18-03 W6M | |
| Location Alias 2: 00/12-32-118-03 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 118 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 32 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ZAMA 12-32-118-3 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0164223 | |
| License Date: 1994-01-20 | |
| License Status: Abandoned | |
| Spud Date: 1994-02-05 | |
| Final Drill Date: 1994-02-16 | |
| Well Total Depth: 1647.00 m | |
| Surface Hole Latitude: 59.295531 | |
| Surface Hole Longitude: -118.481737 |
| Date | Event |
|---|---|
| 1994-01-20 | Obtained License |
| 1994-02-06 | Surface Casing Operation Performed |
| 1994-02-11 | Lost Circulation Occurred |
| 1994-02-12 | Well Log Performed |
| 1994-02-13 | Production Casing Operation Performed |
| 1994-02-16 | Finished Drilling |
| 1994-02-16 | Lost Circulation Occurred |
| 1994-02-16 | Well Log Performed |
| 1994-02-16 | Well Mode changed to Drilled and Cased |
| 1994-02-17 | Liner Casing Operation Performed |
| 1994-02-17 | Well Log Performed |
| 1994-02-18 | Drill Stem Test Performed |
| 1994-02-21 | Rig Released |
| 1994-02-25 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-11 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-13 | Perforation Treatment Performed - Cement Squeeze |
| 1994-03-13 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-16 | Perforation Treatment Performed - Cement Squeeze |
| 1994-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-03-20 | Perforation Treatment Performed - Jet Perforation |
| 1994-04-15 | Well Began Production |
| 1994-04-15 | Well Fluid changed to Crude Oil |
| 1994-04-15 | Well Mode changed to Pumping |
| 1996-11-16 | Well Log Performed |
| 1996-11-17 | Perforation Treatment Performed - Jet Perforation |
| 1996-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-02-25 | Plug Back Performed |
| 2010-02-25 | Well Fluid changed to Crude Oil |
| 2010-02-25 | Well Log Performed |
| 2010-02-25 | Well Mode changed to Abandoned Zone |
| 2010-02-26 | Well Log Performed |
| 2010-02-27 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-02-28 | Perforation Treatment Performed - Remedial Casing |
| 2010-03-18 | Well Abandoned |
| 2010-03-18 | Well Fluid changed to Crude Oil |
| 2010-03-18 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-02-25 | Perforation | 1611.60 | 1613.70 | 13 |
| 2010-02-25 | Packing Device Capped w/Cement | 1416.00 | 1590.00 | 0 |
| 2010-02-27 | Perforation | 731.00 | 732.00 | 17 |
| 2010-02-28 | Remedial Casing Cementing | 731.00 | 732.00 | 0 |
| 2010-02-28 | Packing Device Capped w/Cement | 709.50 | 729.00 | 0 |
| 1994-03-11 | Perforation | 1616.00 | 1616.30 | 13 |
| 1994-03-13 | Cement Squeeze | 1616.00 | 1616.30 | 0 |
| 1994-03-13 | Perforation | 1611.00 | 1611.10 | 2 |
| 1994-03-16 | Cement Squeeze | 1611.00 | 1611.10 | 0 |
| 1994-03-20 | Perforation | 1607.00 | 1609.00 | 13 |
| 1994-03-20 | Acid Treatment | 1607.00 | 1609.00 | 0 |
| 1996-11-17 | Perforation | 1595.00 | 1599.00 | 13 |
| 1996-11-18 | Acid Treatment | 1595.00 | 1599.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 3044 | 0.0 | 0.0 | 0.0 |
| 1995 | 6983 | 0.0 | 0.0 | 0.0 |
| 1996 | 8239 | 0.0 | 0.0 | 0.0 |
| 1997 | 7506 | 0.0 | 0.0 | 0.0 |
| 1998 | 4788 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1994-02-11 | Lost Circulation | 1468.00 | 1495.00 |
| 1994-02-16 | Lost Circulation | 1638.00 | 1647.00 |
For data sources see[6]