X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186033212000

Well Details

Well ID: 1186033212000
Loading map...
Location: 00/12-32-118-03W6/0
Location Alias: 00/12-32-18-03 W6M
Location Alias 2: 00/12-32-118-03 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 03
Section: 32
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 12-32-118-3
Operator Name: Paramount Resources Ltd.
License Number: 0164223
License Date: 1994-01-20
License Status: Abandoned
Spud Date: 1994-02-05
Final Drill Date: 1994-02-16
Well Total Depth: 1647.00 m
Surface Hole Latitude: 59.295531
Surface Hole Longitude: -118.481737

For data sources see[1][2]

Well History

Date Event
1994-01-20 Obtained License
1994-02-06 Surface Casing Operation Performed
1994-02-11 Lost Circulation Occurred
1994-02-12 Well Log Performed
1994-02-13 Production Casing Operation Performed
1994-02-16 Finished Drilling
1994-02-16 Lost Circulation Occurred
1994-02-16 Well Log Performed
1994-02-16 Well Mode changed to Drilled and Cased
1994-02-17 Liner Casing Operation Performed
1994-02-17 Well Log Performed
1994-02-18 Drill Stem Test Performed
1994-02-21 Rig Released
1994-02-25 Perforation Treatment Performed - Jet Perforation
1994-03-11 Perforation Treatment Performed - Jet Perforation
1994-03-13 Perforation Treatment Performed - Cement Squeeze
1994-03-13 Perforation Treatment Performed - Jet Perforation
1994-03-16 Perforation Treatment Performed - Cement Squeeze
1994-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-20 Perforation Treatment Performed - Jet Perforation
1994-04-15 Well Began Production
1994-04-15 Well Fluid changed to Crude Oil
1994-04-15 Well Mode changed to Pumping
1996-11-16 Well Log Performed
1996-11-17 Perforation Treatment Performed - Jet Perforation
1996-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-25 Plug Back Performed
2010-02-25 Well Fluid changed to Crude Oil
2010-02-25 Well Log Performed
2010-02-25 Well Mode changed to Abandoned Zone
2010-02-26 Well Log Performed
2010-02-27 Perforation Treatment Performed - Jet Perforation
2010-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-28 Perforation Treatment Performed - Remedial Casing
2010-03-18 Well Abandoned
2010-03-18 Well Fluid changed to Crude Oil
2010-03-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-25 Perforation 1611.60 1613.70 13
2010-02-25 Packing Device Capped w/Cement 1416.00 1590.00 0
2010-02-27 Perforation 731.00 732.00 17
2010-02-28 Remedial Casing Cementing 731.00 732.00 0
2010-02-28 Packing Device Capped w/Cement 709.50 729.00 0
1994-03-11 Perforation 1616.00 1616.30 13
1994-03-13 Cement Squeeze 1616.00 1616.30 0
1994-03-13 Perforation 1611.00 1611.10 2
1994-03-16 Cement Squeeze 1611.00 1611.10 0
1994-03-20 Perforation 1607.00 1609.00 13
1994-03-20 Acid Treatment 1607.00 1609.00 0
1996-11-17 Perforation 1595.00 1599.00 13
1996-11-18 Acid Treatment 1595.00 1599.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3044 0.0 0.0 0.0
1995 6983 0.0 0.0 0.0
1996 8239 0.0 0.0 0.0
1997 7506 0.0 0.0 0.0
1998 4788 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-02-11 Lost Circulation 1468.00 1495.00
1994-02-16 Lost Circulation 1638.00 1647.00

For data sources see[6]

References