X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186040402000

Well Details

Well ID: 1186040402000
Loading map...
Location: 00/02-04-118-04W6/0
Location Alias: 00/02-04-18-04 W6M
Location Alias 2: 00/02-04-118-04 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 04
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 2-4-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0032226
License Date: 1967-06-06
License Status: Abandoned
Spud Date: 1967-06-10
Final Drill Date: 1967-06-30
Well Total Depth: 1514.90 m
Surface Hole Latitude: 59.214159
Surface Hole Longitude: -118.611875

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-06-06 Obtained License
1967-06-21 Drill Stem Test Performed
1967-06-22 Drill Stem Test Performed
1967-06-29 Drill Stem Test Performed
1967-06-30 Finished Drilling
1967-06-30 Well Mode changed to Drilled and Cased
1967-07-01 Liner Casing Operation Performed
1967-07-02 Perforation Treatment Performed - Jet Perforation
1967-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-04 Well Began Production
1967-07-04 Well Fluid changed to Crude Oil
1967-07-04 Well Mode changed to Flowing
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1993-11-13 Perforation Treatment Performed - Cement Squeeze
1993-11-21 Well Log Performed
1993-11-22 Perforation Treatment Performed - Jet Perforation
1993-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-26 Perforation Treatment Performed - Cement Squeeze
1995-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-31 Plug Back Performed
1995-01-31 Well Fluid changed to Crude Oil
1995-01-31 Well Mode changed to Abandoned Zone
1995-02-03 Perforation Treatment Performed - Jet Perforation
1995-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-08 Well Log Performed
2012-05-29 Well Log Performed
2012-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-31 Well Log Performed
2012-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-01 Plug Back Performed
2012-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-02 Perforation Treatment Performed - Jet Perforation
2012-06-02 Plug Back Performed
2012-06-02 Well Log Performed
2012-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-03 Perforation Treatment Performed - Remedial Casing
2012-06-04 Perforation Treatment Performed - Jet Perforation
2012-06-04 Well Log Performed
2012-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-05 Perforation Treatment Performed - Remedial Casing
2012-06-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-02 Perforation 1457.60 1463.00 7
1995-01-31 Packing Device Capped w/Cement 1442.00 1450.00 0
1995-02-03 Perforation 1373.30 1378.30 18
1995-02-03 Perforation 1360.90 1362.20 18
1995-02-03 Perforation 1357.00 1358.20 18
1995-02-03 Perforation 1363.70 1365.50 18
1995-02-03 Perforation 1370.40 1373.30 18
1995-02-03 Perforation 1348.70 1349.70 18
1995-02-03 Perforation 1345.70 1347.60 18
1995-02-03 Perforation 1302.40 1305.80 18
1995-02-03 Perforation 1298.90 1300.30 18
1967-07-02 Perforation 1467.60 1469.10 7
1995-02-03 Perforation 1293.90 1298.90 18
1995-02-04 Acid Treatment 1293.90 1378.30 0
2012-05-31 Packing Device Capped w/Cement 1386.70 1394.70 0
2012-06-01 Packing Device Capped w/Cement 1332.00 1340.00 0
2012-06-02 Packing Device Capped w/Cement 1282.00 1290.00 0
2012-06-02 Perforation 640.00 641.00 17
2012-06-02 Packing Device Capped w/Cement 902.00 910.00 0
2012-06-03 Packing Device Capped w/Cement 620.50 638.50 0
2012-06-03 Remedial Casing Cementing 640.00 641.00 0
2012-06-04 Perforation 293.00 294.00 17
1967-07-03 Acid Treatment 1457.60 1463.00 0
2012-06-05 Remedial Casing Cementing 293.00 294.00 0
2012-06-05 Packing Device Capped w/Cement 283.00 291.00 0
1967-07-03 Acid Treatment 1467.60 1469.10 0
1993-11-13 Cement Squeeze 1457.60 1469.10 0
1993-11-22 Perforation 1457.60 1458.20 13
1993-11-22 Perforation 1460.00 1461.20 13
1993-11-23 Acid Treatment 1457.60 1461.20 0
1995-01-26 Cement Squeeze 1460.00 1461.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 2126 0.0 0.0 0.0
1968 3261 0.0 0.0 0.0
1969 4302 0.0 0.0 0.0
1970 2492 0.0 0.0 0.0
1971 1284 0.0 0.0 0.0
1972 1938 0.0 0.0 0.0
1973 3388 0.0 0.0 0.0
1974 2104 0.0 0.0 0.0
1975 2958 0.0 0.0 0.0
1976 1756 0.0 0.0 0.0
1977 1554 0.0 0.0 0.0
1978 2662 0.0 0.0 0.0
1979 3013 0.0 0.0 0.0
1980 2346 0.0 0.0 0.0
1981 2285 0.0 0.0 0.0
1982 3764 0.0 0.0 0.0
1983 3595 0.0 0.0 0.0
1984 6551 0.0 0.0 0.0
1985 4374 0.0 0.0 0.0
1986 4627 0.0 0.0 0.0
1987 7930 0.0 0.0 0.0
1988 8307 0.0 0.0 0.0
1989 7879 0.0 0.0 0.0
1990 8683 0.0 0.0 0.0
1991 8702 0.0 0.0 0.0
1992 7879 0.0 0.0 0.0
1993 7157 0.0 0.0 0.0
1994 2275 0.0 0.0 0.0
1995 36 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-20 No Incident Encountered 0.00 0.00
2012-06-20 No Incident Encountered 0.00 0.00
2012-06-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References