X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186040402002

Well Details

Well ID: 1186040402002
Loading map...
Location: 00/02-04-118-04W6/2
Location Alias: 00/02-04-18-04 W6M
Location Alias 2: 00/02-04-118-04 W6/02
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 04
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 2-4-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0032226
License Date: 1967-06-06
License Status: Abandoned
Spud Date: 1967-06-10
Final Drill Date: 1967-06-30
Well Total Depth: 1514.90 m
Surface Hole Latitude: 59.214159
Surface Hole Longitude: -118.611875

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-06-06 Obtained License
1967-06-21 Drill Stem Test Performed
1967-06-22 Drill Stem Test Performed
1967-06-29 Drill Stem Test Performed
1967-06-30 Finished Drilling
1967-06-30 Well Mode changed to Drilled and Cased
1967-07-01 Liner Casing Operation Performed
1967-07-02 Perforation Treatment Performed - Jet Perforation
1967-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-13 Perforation Treatment Performed - Cement Squeeze
1993-11-21 Well Log Performed
1993-11-22 Perforation Treatment Performed - Jet Perforation
1993-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-26 Perforation Treatment Performed - Cement Squeeze
1995-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-31 Plug Back Performed
1995-02-03 Perforation Treatment Performed - Jet Perforation
1995-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-01 Well Began Production
1996-08-01 Well Fluid changed to Gas
1996-08-01 Well Mode changed to Flowing
1996-09-08 Well Log Performed
2001-02-21 Well Fluid changed to Gas
2001-02-21 Well Mode changed to Flowing
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Suspended
2012-05-29 Well Log Performed
2012-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-31 Well Log Performed
2012-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-01 Plug Back Performed
2012-06-01 Well Fluid changed to Gas
2012-06-01 Well Mode changed to Abandoned Zone
2012-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-02 Perforation Treatment Performed - Jet Perforation
2012-06-02 Plug Back Performed
2012-06-02 Well Log Performed
2012-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-03 Perforation Treatment Performed - Remedial Casing
2012-06-04 Perforation Treatment Performed - Jet Perforation
2012-06-04 Well Log Performed
2012-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-05 Perforation Treatment Performed - Remedial Casing
2012-06-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-02 Perforation 1457.60 1463.00 7
1995-01-31 Packing Device Capped w/Cement 1442.00 1450.00 0
1995-02-03 Perforation 1373.30 1378.30 18
1995-02-03 Perforation 1360.90 1362.20 18
1995-02-03 Perforation 1357.00 1358.20 18
1995-02-03 Perforation 1363.70 1365.50 18
1995-02-03 Perforation 1370.40 1373.30 18
1995-02-03 Perforation 1348.70 1349.70 18
1995-02-03 Perforation 1345.70 1347.60 18
1995-02-03 Perforation 1302.40 1305.80 18
1995-02-03 Perforation 1298.90 1300.30 18
1967-07-02 Perforation 1467.60 1469.10 7
1995-02-03 Perforation 1293.90 1298.90 18
1995-02-04 Acid Treatment 1293.90 1378.30 0
2012-05-31 Packing Device Capped w/Cement 1386.70 1394.70 0
2012-06-01 Packing Device Capped w/Cement 1332.00 1340.00 0
2012-06-02 Packing Device Capped w/Cement 1282.00 1290.00 0
2012-06-02 Perforation 640.00 641.00 17
2012-06-02 Packing Device Capped w/Cement 902.00 910.00 0
2012-06-03 Packing Device Capped w/Cement 620.50 638.50 0
2012-06-03 Remedial Casing Cementing 640.00 641.00 0
2012-06-04 Perforation 293.00 294.00 17
1967-07-03 Acid Treatment 1457.60 1463.00 0
2012-06-05 Remedial Casing Cementing 293.00 294.00 0
2012-06-05 Packing Device Capped w/Cement 283.00 291.00 0
1967-07-03 Acid Treatment 1467.60 1469.10 0
1993-11-13 Cement Squeeze 1457.60 1469.10 0
1993-11-22 Perforation 1457.60 1458.20 13
1993-11-22 Perforation 1460.00 1461.20 13
1993-11-23 Acid Treatment 1457.60 1461.20 0
1995-01-26 Cement Squeeze 1460.00 1461.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2859 0.0 0.0 0.0
1997 7650 0.0 0.0 0.0
1998 7831 0.0 0.0 0.0
1999 4316 0.0 0.0 0.0
2000 7940 0.0 0.0 0.0
2001 1297 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-20 No Incident Encountered 0.00 0.00
2012-06-20 No Incident Encountered 0.00 0.00
2012-06-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References