X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186062813000

Well Details

Well ID: 1186062813000
Loading map...
Location: 00/13-28-118-06W6/0
Location Alias: 00/13-28-18-06 W6M
Location Alias 2: 00/13-28-118-06 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 06
Section: 28
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 13-28-118-6
Operator Name: Paramount Resources Ltd.
License Number: 0282378
License Date: 2003-02-07
License Status: Abandoned
Spud Date: 2003-02-20
Final Drill Date: 2003-03-06
Well Total Depth: 1900.00 m
Surface Hole Latitude: 59.284816
Surface Hole Longitude: -118.967129

For data sources see[1][2]

Well History

Date Event
2003-02-07 Obtained License
2003-02-23 Surface Casing Operation Performed
2003-03-01 Well Log Performed
2003-03-03 Production Casing Operation Performed
2003-03-06 Finished Drilling
2003-03-06 Well Log Performed
2003-03-06 Well Mode changed to Drilled and Cased
2003-03-07 Well Log Performed
2003-03-08 Liner Casing Operation Performed
2003-03-08 Well Log Performed
2003-03-09 Rig Released
2003-03-20 Perforation Treatment Performed - Jet Perforation
2003-03-20 Well Log Performed
2003-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-04-20 Well Began Production
2003-04-20 Well Fluid changed to Crude Oil
2003-04-20 Well Mode changed to Pumping
2004-01-24 Well Log Performed
2004-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-25 Perforation Treatment Performed - Jet Perforation
2004-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-01 Perforation Treatment Performed - Cement Squeeze
2004-02-08 Well Log Performed
2004-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-13 Well Log Performed
2004-02-15 Well Log Performed
2004-02-16 Perforation Treatment Performed - Jet Perforation
2004-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-01-27 Perforation Treatment Performed - Jet Perforation
2008-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Suspended
2013-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-12 Plug Back Performed
2013-12-12 Well Fluid changed to Crude Oil
2013-12-12 Well Log Performed
2013-12-12 Well Mode changed to Abandoned Zone
2013-12-13 Well Log Performed
2013-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-14 Perforation Treatment Performed - Jet Perforation
2013-12-14 Well Log Performed
2013-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-12-16 Perforation Treatment Performed - Jet Perforation
2013-12-16 Well Log Performed
2013-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-17 Perforation Treatment Performed - Remedial Casing
2014-01-07 Perforation Treatment Performed - Jet Perforation
2014-01-07 Well Log Performed
2014-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-09 Perforation Treatment Performed - Remedial Casing
2014-01-09 Well Log Performed
2014-01-22 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2014-01-24 Perforation Treatment Performed - Cement Plug
2014-02-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-20 Perforation 1789.50 1794.50 14
2004-02-10 Acid Treatment 1816.00 1819.00 0
2004-02-13 Acid Treatment 1816.00 1819.00 0
2004-02-16 Perforation 1776.00 1780.00 13
2004-02-17 Acid Treatment 1776.00 1780.00 0
2008-01-27 Perforation 1785.00 1795.00 13
2008-01-28 Acid Treatment 1776.00 1795.00 0
2013-12-12 Packing Device Capped w/Cement 1760.00 1768.00 0
2013-12-14 Packing Device Capped w/Cement 1647.00 1655.00 0
2013-12-14 Perforation 587.00 588.00 99
2013-12-15 Acid Treatment 587.00 588.00 0
2003-03-20 Perforation 1810.00 1814.00 14
2013-12-16 Perforation 583.00 584.00 99
2013-12-17 Remedial Casing Cementing 583.00 588.00 0
2013-12-17 Packing Device Capped w/Cement 577.50 585.50 0
2014-01-07 Perforation 569.00 570.00 99
2014-01-08 Acid Treatment 569.00 570.00 0
2014-01-09 Remedial Casing Cementing 569.00 570.00 0
2014-01-22 Packing Dev Cpd w/Res-Gyp Cem 565.00 568.00 0
2014-01-24 Cement Plug 517.70 565.00 0
2003-03-20 Perforation 1816.00 1819.00 14
2003-03-20 Perforation 1837.00 1839.00 14
2003-03-21 Acid Treatment 1789.50 1839.00 0
2004-01-25 Acid Treatment 1837.00 1839.00 0
2004-01-25 Perforation 1857.00 1862.00 13
2004-01-27 Acid Treatment 1857.00 1862.00 0
2004-02-01 Cement Squeeze 1789.50 1814.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5109 0.0 0.0 0.0
2004 7327 0.0 0.0 0.0
2005 6509 0.0 0.0 0.0
2006 131 0.0 0.0 0.0
2008 3015 0.0 0.0 0.0
2009 1150 0.0 0.0 0.0
2010 7800 0.0 0.0 0.0
2011 2798 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References