If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1186063216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.303452,"lon":-118.981156,"icon":""}]} |
| Location: 00/16-32-118-06W6/0 | |
| Location Alias: 00/16-32-18-06 W6M | |
| Location Alias 2: 00/16-32-118-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 118 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 32 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL SHEKILIE 16-32-118-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0280436 | |
| License Date: 2003-01-13 | |
| License Status: Abandoned | |
| Spud Date: 2003-02-11 | |
| Final Drill Date: 2003-02-28 | |
| Well Total Depth: 2029.00 m | |
| Surface Hole Latitude: 59.303452 | |
| Surface Hole Longitude: -118.981156 |
| Date | Event |
|---|---|
| 2003-01-13 | Obtained License |
| 2003-02-13 | Surface Casing Operation Performed |
| 2003-02-14 | Well Log Performed |
| 2003-02-15 | Direction Drilling Operation Performed - Deviate |
| 2003-02-23 | Well Log Performed |
| 2003-02-24 | Production Casing Operation Performed |
| 2003-02-27 | Well Log Performed |
| 2003-02-28 | Finished Drilling |
| 2003-02-28 | Perforation Treatment Performed - Open-Hole Completion |
| 2003-02-28 | Well Mode changed to Drilled and Cased |
| 2003-03-02 | Rig Released |
| 2003-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-04-21 | Well Began Production |
| 2003-04-21 | Well Fluid changed to Crude Oil |
| 2003-04-21 | Well Mode changed to Pumping |
| 2009-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-02-28 | Plug Back Performed |
| 2009-02-28 | Well Fluid changed to Crude Oil |
| 2009-02-28 | Well Mode changed to Abandoned Zone |
| 2009-03-05 | Well Log Performed |
| 2009-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-06 | Well Log Performed |
| 2009-03-07 | Perforation Treatment Performed - Jet Perforation |
| 2009-03-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-09-11 | Well Log Performed |
| 2013-09-12 | Well Log Performed |
| 2013-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-13 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-13 | Plug Back Performed |
| 2013-09-13 | Well Log Performed |
| 2013-09-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-15 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-15 | Well Log Performed |
| 2013-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-26 | Perforation Treatment Performed - Remedial Casing |
| 2013-09-27 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-27 | Well Log Performed |
| 2013-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2013-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-29 | Perforation Treatment Performed - Remedial Casing |
| 2013-11-24 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2003-02-15 | 654.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-02-28 | Open Hole/Barefoot Completion | 1856.00 | 2029.00 | 0 |
| 2013-09-14 | Acid Treatment | 1554.00 | 1555.00 | 0 |
| 2013-09-15 | Packing Device Capped w/Cement | 1540.00 | 1550.00 | 0 |
| 2013-09-15 | Perforation | 944.00 | 945.00 | 99 |
| 2013-09-16 | Acid Treatment | 944.00 | 945.00 | 0 |
| 2013-09-26 | Remedial Casing Cementing | 944.00 | 945.00 | 0 |
| 2013-09-26 | Packing Device Capped w/Cement | 929.00 | 939.00 | 0 |
| 2013-09-27 | Perforation | 578.00 | 579.00 | 99 |
| 2013-09-28 | Acid Treatment | 578.00 | 579.00 | 0 |
| 2013-09-29 | Remedial Casing Cementing | 578.00 | 579.00 | 0 |
| 2013-09-29 | Packing Device Capped w/Cement | 567.50 | 576.00 | 0 |
| 2003-03-10 | Acid Treatment | 1856.00 | 2029.00 | 0 |
| 2009-02-28 | Packing Device Capped w/Cement | 1795.00 | 1973.00 | 0 |
| 2009-03-06 | Packing Device Capped w/Cement | 1784.00 | 1792.00 | 0 |
| 2009-03-07 | Perforation | 1761.50 | 1763.50 | 20 |
| 2009-03-07 | Perforation | 1768.00 | 1772.00 | 20 |
| 2009-03-08 | Acid Treatment | 1761.50 | 1772.00 | 0 |
| 2013-09-13 | Packing Device Capped w/Cement | 1745.00 | 1755.00 | 0 |
| 2013-09-13 | Perforation | 1554.00 | 1555.00 | 99 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 5674 | 0.0 | 0.0 | 0.0 |
| 2004 | 8466 | 0.0 | 0.0 | 0.0 |
| 2005 | 5976 | 0.0 | 0.0 | 0.0 |
| 2006 | 7050 | 0.0 | 0.0 | 0.0 |
| 2007 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-11-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]