X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186071113000

Well Details

Well ID: 1186071113000
Loading map...
Location: 00/13-11-118-07W6/0
Location Alias: 00/13-11-18-07 W6M
Location Alias 2: 00/13-11-118-07 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 07
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL SHEKIL 13-11-118-7
Operator Name: Paramount Resources Ltd.
License Number: 0093024
License Date: 1981-10-29
License Status: Suspension
Spud Date: 1981-11-02
Final Drill Date: 1981-11-25
Well Total Depth: 1853.00 m
Surface Hole Latitude: 59.238885
Surface Hole Longitude: -119.076150

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-29 Obtained License
1981-11-19 Production Casing Operation Performed
1981-11-25 Finished Drilling
1981-12-16 Perforation Treatment Performed - Jet Perforation
1982-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-29 Perforation Treatment Performed - Cement Squeeze
1982-02-01 Perforation Treatment Performed - Jet Perforation
1982-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-30 Well Mode changed to Drilled and Cased
2003-02-09 Well Log Performed
2003-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-10 Plug Back Performed
2003-02-10 Well Mode changed to Abandoned Zone
2003-02-11 Well Log Performed
2003-02-12 Well Log Performed
2003-02-14 Perforation Treatment Performed - Jet Perforation
2003-02-16 Perforation Treatment Performed - Remedial Casing
2003-02-16 Well Log Performed
2003-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-18 Perforation Treatment Performed - Jet Perforation
2003-02-18 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-16 Perforation 1566.00 1569.50 13
2003-02-10 Packing Device Capped w/Cement 1557.00 1557.40 0
2003-02-14 Perforation 505.00 506.00 17
2003-02-16 Remedial Casing Cementing 505.00 506.00 0
2003-02-18 Perforation 420.00 421.00 17
2003-02-18 Acid Treatment 420.00 421.00 0
2003-02-18 Remedial Casing Cementing 420.00 421.00 0
1981-12-16 Perforation 1570.50 1572.00 13
1981-12-16 Perforation 1588.00 1589.00 13
1981-12-16 Perforation 1590.00 1594.00 13
1982-01-06 Acid Treatment 1566.00 1594.00 0
1982-01-29 Cement Squeeze 1566.00 1594.00 0
1982-02-01 Perforation 1566.00 1569.50 13
1982-02-01 Perforation 1566.00 1567.00 13
1982-02-05 Acid Treatment 1566.00 1569.50 0

For data sources see[4]



References