X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186072509000

Well Details

Well ID: 1186072509000
Loading map...
Location: 00/09-25-118-07W6/0
Location Alias: 00/09-25-18-07 W6M
Location Alias 2: 00/09-25-118-07 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 07
Section: 25
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 9-25-118-7
Operator Name: Paramount Resources Ltd.
License Number: 0031658
License Date: 1967-01-27
License Status: Abandoned
Spud Date: 1967-01-30
Final Drill Date: 1967-03-07
Well Total Depth: 2040.90 m
Surface Hole Latitude: 59.277656
Surface Hole Longitude: -119.025215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-01-27 Obtained License
1967-02-12 Drill Stem Test Performed
1967-02-18 Drill Stem Test Performed
1967-02-19 Production Casing Operation Performed
1967-02-25 Drill Stem Test Performed
1967-02-26 Drill Stem Test Performed
1967-03-07 Finished Drilling
1968-01-21 Perforation Treatment Performed - Jet Perforation
1968-01-27 Perforation Treatment Performed - Cement Squeeze
1968-01-27 Perforation Treatment Performed - Jet Perforation
1968-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-17 Perforation Treatment Performed - Jet Perforation
1968-02-17 Well Log Performed
1968-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-22 Perforation Treatment Performed - Cement Squeeze
1968-02-24 Perforation Treatment Performed - Jet Perforation
1968-03-22 Well Mode changed to Drilled and Cased
2003-03-04 Well Log Performed
2003-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-16 Plug Back Performed
2003-03-16 Well Log Performed
2003-03-16 Well Mode changed to Abandoned Zone
2010-02-19 Well Log Performed
2010-02-20 Well Log Performed
2010-02-21 Perforation Treatment Performed - Jet Perforation
2010-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-22 Perforation Treatment Performed - Remedial Casing
2010-02-22 Well Log Performed
2010-02-23 Well Log Performed
2010-02-24 Perforation Treatment Performed - Jet Perforation
2010-02-25 Well Log Performed
2010-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-26 Perforation Treatment Performed - Jet Perforation
2010-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-01 Perforation Treatment Performed - Remedial Casing
2010-03-02 Well Log Performed
2010-03-03 Well Log Performed
2010-03-04 Perforation Treatment Performed - Jet Perforation
2010-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-06 Perforation Treatment Performed - Remedial Casing
2010-03-06 Well Log Performed
2010-03-08 Well Log Performed
2010-03-09 Perforation Treatment Performed - Jet Perforation
2010-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-10 Perforation Treatment Performed - Remedial Casing
2010-03-17 Well Abandoned
2010-03-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-21 Perforation 1659.00 1662.70 0
1968-02-22 Cement Squeeze 1683.10 1684.90 0
1968-02-24 Perforation 1671.20 1672.40 7
2003-03-16 Packing Device Capped w/Cement 1657.00 1665.00 0
2010-02-21 Perforation 935.00 936.00 17
2010-02-22 Remedial Casing Cementing 935.00 936.00 0
2010-02-22 Packing Device Capped w/Cement 922.00 931.50 0
2010-02-24 Perforation 570.00 571.00 17
2010-02-26 Packing Device Capped w/Cement 557.00 565.00 0
2010-02-26 Perforation 483.00 484.00 17
2010-02-26 Acid Treatment 483.00 484.00 0
1968-01-27 Perforation 1671.50 1675.20 0
2010-03-01 Remedial Casing Cementing 483.00 484.00 0
2010-03-01 Packing Device Capped w/Cement 471.00 479.00 0
2010-03-04 Perforation 382.00 383.00 17
2010-03-05 Acid Treatment 382.00 383.00 0
2010-03-06 Remedial Casing Cementing 382.00 383.00 0
2010-03-06 Packing Device Capped w/Cement 360.00 370.00 0
2010-03-09 Perforation 228.00 229.00 17
2010-03-10 Remedial Casing Cementing 228.00 229.00 0
2010-03-10 Packing Device Capped w/Cement 210.00 220.00 0
1968-01-27 Perforation 1652.60 1656.60 0
1968-01-27 Cement Squeeze 1652.60 1656.60 0
1968-01-27 Cement Squeeze 1659.00 1662.70 0
1968-02-10 Acid Treatment 1671.50 1675.20 0
1968-02-17 Perforation 1683.10 1684.90 7
1968-02-19 Acid Treatment 1683.10 1684.90 0
1968-02-22 Cement Squeeze 1671.50 1675.20 0

For data sources see[4]



References