If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1186080902033 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.227262,"lon":-119.29288,"icon":""}]} |
| Location: 03/02-09-118-08W6/3 | |
| Location Alias: 03/02-09-18-08 W6M | |
| Location Alias 2: 03/02-09-118-08 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 118 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 09 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL 103A SHEKILIE 2-9-118-8 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0042388 | |
| License Date: 1972-04-04 | |
| License Status: Suspension | |
| Spud Date: 1972-04-20 | |
| Final Drill Date: 1972-05-13 | |
| Well Total Depth: 1828.80 m | |
| Surface Hole Latitude: 59.227262 | |
| Surface Hole Longitude: -119.292880 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1972-04-04 | Obtained License |
| 1972-05-13 | Finished Drilling |
| 1972-05-13 | Well Mode changed to Drilled and Cased |
| 1972-05-15 | Drill Stem Test Performed |
| 1972-05-17 | Drill Stem Test Performed |
| 1972-05-18 | Liner Casing Operation Performed |
| 1972-05-20 | Perforation Treatment Performed - Jet Perforation |
| 1972-05-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-02-09 | Well Log Performed |
| 1982-02-10 | Perforation Treatment Performed - Jet Perforation |
| 1982-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1987-02-13 | Well Log Performed |
| 1987-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1987-02-14 | Perforation Treatment Performed - Jet Perforation |
| 1987-02-14 | Plug Back Performed |
| 1987-02-15 | Well Log Performed |
| 1987-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-02-06 | Perforation Treatment Performed - Jet Perforation |
| 1999-02-06 | Plug Back Performed |
| 1999-02-06 | Well Log Performed |
| 1999-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-02-07 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1999-02-08 | Well Log Performed |
| 2003-09-17 | Perforation Treatment Performed - Jet Perforation |
| 2003-09-19 | Well Log Performed |
| 2003-09-21 | Perforation Treatment Performed - Cement Squeeze |
| 2003-09-21 | Plug Back Performed |
| 2003-09-21 | Well Log Performed |
| 2003-09-27 | Perforation Treatment Performed - Cement Squeeze |
| 2003-10-03 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-04 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-04 | Well Log Performed |
| 2003-10-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-10-07 | Well Log Performed |
| 2003-10-15 | Well Log Performed |
| 2003-10-17 | Well Log Performed |
| 2004-01-17 | Well Began Injection |
| 2004-01-17 | Well Fluid changed to Water |
| 2004-01-17 | Well Type changed to Injection |
| 2011-07-01 | Well Fluid changed to Water |
| 2011-07-01 | Well Mode changed to Suspended |
| 2011-07-01 | Well Type changed to Injection |
| 2013-02-23 | Well Log Performed |
| 2013-02-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-24 | Plug Back Performed |
| 2013-02-24 | Well Fluid changed to Water |
| 2013-02-24 | Well Mode changed to Abandoned Zone |
| 2013-02-24 | Well Type changed to Injection |
| 2013-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-02-27 | Well Log Performed |
| 2013-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-01 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-01 | Well Log Performed |
| 2013-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-02 | Perforation Treatment Performed - Remedial Casing |
| 2013-03-02 | Well Log Performed |
| 2013-03-03 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-04 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-07 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-07 | Well Log Performed |
| 2013-03-08 | Perforation Treatment Performed - Remedial Casing |
| 2013-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-09 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-09 | Well Log Performed |
| 2013-03-13 | Perforation Treatment Performed - Remedial Casing |
| 2013-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-03-14 | Perforation Treatment Performed - Jet Perforation |
| 2013-03-14 | Well Log Performed |
| 2013-03-15 | Perforation Treatment Performed - Remedial Casing |
| 2013-03-17 | Well Log Performed |
| 2013-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1972-05-20 | Perforation | 1756.90 | 1764.50 | 13 |
| 1987-02-14 | Perforation | 1735.50 | 1738.00 | 13 |
| 1987-02-14 | Perforation | 1744.50 | 1747.50 | 13 |
| 1987-02-18 | Acid Treatment | 1699.50 | 1747.50 | 0 |
| 1999-02-06 | Packing Device Capped w/Cement | 1685.00 | 1693.00 | 0 |
| 1999-02-06 | Perforation | 1570.30 | 1573.40 | 13 |
| 1999-02-06 | Perforation | 1567.60 | 1569.10 | 13 |
| 1999-02-06 | Perforation | 1562.40 | 1564.20 | 13 |
| 1999-02-07 | Acid Wash | 1562.40 | 1573.40 | 0 |
| 1999-02-07 | Acid Treatment | 1562.40 | 1573.40 | 0 |
| 2003-09-17 | Perforation | 1699.50 | 1701.00 | 13 |
| 1972-05-21 | Acid Treatment | 1756.90 | 1764.50 | 0 |
| 2003-09-17 | Perforation | 1704.00 | 1707.00 | 13 |
| 2003-09-17 | Perforation | 1717.00 | 1719.00 | 13 |
| 2003-09-17 | Perforation | 1728.50 | 1730.50 | 13 |
| 2003-09-17 | Perforation | 1735.50 | 1738.00 | 13 |
| 2003-09-17 | Perforation | 1744.50 | 1747.50 | 13 |
| 2003-09-21 | Cement Squeeze | 1562.40 | 1573.40 | 0 |
| 2003-09-27 | Cement Squeeze | 1699.50 | 1747.50 | 0 |
| 2003-10-03 | Perforation | 1756.90 | 1764.50 | 13 |
| 2003-10-03 | Perforation | 1776.00 | 1779.00 | 14 |
| 2003-10-04 | Perforation | 1805.50 | 1810.50 | 14 |
| 1982-02-10 | Perforation | 1776.00 | 1779.00 | 14 |
| 2003-10-06 | Acid Treatment | 1805.50 | 1810.50 | 0 |
| 2013-02-24 | Packing Device Capped w/Cement | 1748.30 | 1756.30 | 0 |
| 2013-02-25 | Packing Device Capped w/Cement | 1687.00 | 1695.00 | 0 |
| 2013-02-26 | Packing Device Capped w/Cement | 1546.00 | 1554.00 | 0 |
| 2013-03-01 | Perforation | 1444.00 | 1445.00 | 17 |
| 2013-03-01 | Perforation | 885.00 | 886.00 | 17 |
| 2013-03-01 | Packing Device Capped w/Cement | 1434.00 | 1442.00 | 0 |
| 2013-03-02 | Packing Device Capped w/Cement | 870.00 | 882.00 | 0 |
| 2013-03-02 | Remedial Casing Cementing | 885.00 | 886.00 | 0 |
| 2013-03-03 | Perforation | 530.00 | 531.00 | 17 |
| 1982-02-12 | Acid Treatment | 1776.00 | 1779.00 | 0 |
| 2013-03-04 | Perforation | 523.00 | 524.00 | 17 |
| 2013-03-06 | Packing Device Capped w/Cement | 504.00 | 520.00 | 0 |
| 2013-03-07 | Perforation | 500.00 | 501.00 | 17 |
| 2013-03-08 | Remedial Casing Cementing | 500.00 | 501.00 | 0 |
| 2013-03-09 | Packing Device Capped w/Cement | 480.00 | 488.00 | 0 |
| 2013-03-09 | Perforation | 374.00 | 375.00 | 17 |
| 2013-03-13 | Remedial Casing Cementing | 374.00 | 375.00 | 0 |
| 2013-03-14 | Packing Device Capped w/Cement | 360.00 | 368.00 | 0 |
| 2013-03-14 | Perforation | 245.00 | 246.00 | 17 |
| 2013-03-15 | Remedial Casing Cementing | 245.00 | 246.00 | 0 |
| 1987-02-14 | Packing Device Capped w/Cement | 1752.50 | 1756.00 | 0 |
| 2013-03-18 | Packing Device Capped w/Cement | 228.00 | 236.00 | 0 |
| 1987-02-14 | Perforation | 1699.50 | 1701.00 | 13 |
| 1987-02-14 | Perforation | 1704.00 | 1707.00 | 13 |
| 1987-02-14 | Perforation | 1717.00 | 1719.00 | 13 |
| 1987-02-14 | Perforation | 1728.50 | 1730.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
| 2006 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-03-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]