X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186080902033

Well Details

Well ID: 1186080902033
Loading map...
Location: 03/02-09-118-08W6/3
Location Alias: 03/02-09-18-08 W6M
Location Alias 2: 03/02-09-118-08 W6/03
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 09
County/Municipality: Mackenzie County
Well Name: ACL 103A SHEKILIE 2-9-118-8
Operator Name: Paramount Resources Ltd.
License Number: 0042388
License Date: 1972-04-04
License Status: Suspension
Spud Date: 1972-04-20
Final Drill Date: 1972-05-13
Well Total Depth: 1828.80 m
Surface Hole Latitude: 59.227262
Surface Hole Longitude: -119.292880

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-04-04 Obtained License
1972-05-13 Finished Drilling
1972-05-13 Well Mode changed to Drilled and Cased
1972-05-15 Drill Stem Test Performed
1972-05-17 Drill Stem Test Performed
1972-05-18 Liner Casing Operation Performed
1972-05-20 Perforation Treatment Performed - Jet Perforation
1972-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-09 Well Log Performed
1982-02-10 Perforation Treatment Performed - Jet Perforation
1982-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-13 Well Log Performed
1987-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-02-14 Perforation Treatment Performed - Jet Perforation
1987-02-14 Plug Back Performed
1987-02-15 Well Log Performed
1987-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-06 Perforation Treatment Performed - Jet Perforation
1999-02-06 Plug Back Performed
1999-02-06 Well Log Performed
1999-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-07 Perforation Treatment Performed - Acid Wash - No Pressure
1999-02-08 Well Log Performed
2003-09-17 Perforation Treatment Performed - Jet Perforation
2003-09-19 Well Log Performed
2003-09-21 Perforation Treatment Performed - Cement Squeeze
2003-09-21 Plug Back Performed
2003-09-21 Well Log Performed
2003-09-27 Perforation Treatment Performed - Cement Squeeze
2003-10-03 Perforation Treatment Performed - Jet Perforation
2003-10-04 Perforation Treatment Performed - Jet Perforation
2003-10-04 Well Log Performed
2003-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-07 Well Log Performed
2003-10-15 Well Log Performed
2003-10-17 Well Log Performed
2004-01-17 Well Began Injection
2004-01-17 Well Fluid changed to Water
2004-01-17 Well Type changed to Injection
2011-07-01 Well Fluid changed to Water
2011-07-01 Well Mode changed to Suspended
2011-07-01 Well Type changed to Injection
2013-02-23 Well Log Performed
2013-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-24 Plug Back Performed
2013-02-24 Well Fluid changed to Water
2013-02-24 Well Mode changed to Abandoned Zone
2013-02-24 Well Type changed to Injection
2013-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-27 Well Log Performed
2013-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-01 Perforation Treatment Performed - Jet Perforation
2013-03-01 Well Log Performed
2013-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-02 Perforation Treatment Performed - Remedial Casing
2013-03-02 Well Log Performed
2013-03-03 Perforation Treatment Performed - Jet Perforation
2013-03-04 Perforation Treatment Performed - Jet Perforation
2013-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-07 Perforation Treatment Performed - Jet Perforation
2013-03-07 Well Log Performed
2013-03-08 Perforation Treatment Performed - Remedial Casing
2013-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-09 Perforation Treatment Performed - Jet Perforation
2013-03-09 Well Log Performed
2013-03-13 Perforation Treatment Performed - Remedial Casing
2013-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-14 Perforation Treatment Performed - Jet Perforation
2013-03-14 Well Log Performed
2013-03-15 Perforation Treatment Performed - Remedial Casing
2013-03-17 Well Log Performed
2013-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-05-20 Perforation 1756.90 1764.50 13
1987-02-14 Perforation 1735.50 1738.00 13
1987-02-14 Perforation 1744.50 1747.50 13
1987-02-18 Acid Treatment 1699.50 1747.50 0
1999-02-06 Packing Device Capped w/Cement 1685.00 1693.00 0
1999-02-06 Perforation 1570.30 1573.40 13
1999-02-06 Perforation 1567.60 1569.10 13
1999-02-06 Perforation 1562.40 1564.20 13
1999-02-07 Acid Wash 1562.40 1573.40 0
1999-02-07 Acid Treatment 1562.40 1573.40 0
2003-09-17 Perforation 1699.50 1701.00 13
1972-05-21 Acid Treatment 1756.90 1764.50 0
2003-09-17 Perforation 1704.00 1707.00 13
2003-09-17 Perforation 1717.00 1719.00 13
2003-09-17 Perforation 1728.50 1730.50 13
2003-09-17 Perforation 1735.50 1738.00 13
2003-09-17 Perforation 1744.50 1747.50 13
2003-09-21 Cement Squeeze 1562.40 1573.40 0
2003-09-27 Cement Squeeze 1699.50 1747.50 0
2003-10-03 Perforation 1756.90 1764.50 13
2003-10-03 Perforation 1776.00 1779.00 14
2003-10-04 Perforation 1805.50 1810.50 14
1982-02-10 Perforation 1776.00 1779.00 14
2003-10-06 Acid Treatment 1805.50 1810.50 0
2013-02-24 Packing Device Capped w/Cement 1748.30 1756.30 0
2013-02-25 Packing Device Capped w/Cement 1687.00 1695.00 0
2013-02-26 Packing Device Capped w/Cement 1546.00 1554.00 0
2013-03-01 Perforation 1444.00 1445.00 17
2013-03-01 Perforation 885.00 886.00 17
2013-03-01 Packing Device Capped w/Cement 1434.00 1442.00 0
2013-03-02 Packing Device Capped w/Cement 870.00 882.00 0
2013-03-02 Remedial Casing Cementing 885.00 886.00 0
2013-03-03 Perforation 530.00 531.00 17
1982-02-12 Acid Treatment 1776.00 1779.00 0
2013-03-04 Perforation 523.00 524.00 17
2013-03-06 Packing Device Capped w/Cement 504.00 520.00 0
2013-03-07 Perforation 500.00 501.00 17
2013-03-08 Remedial Casing Cementing 500.00 501.00 0
2013-03-09 Packing Device Capped w/Cement 480.00 488.00 0
2013-03-09 Perforation 374.00 375.00 17
2013-03-13 Remedial Casing Cementing 374.00 375.00 0
2013-03-14 Packing Device Capped w/Cement 360.00 368.00 0
2013-03-14 Perforation 245.00 246.00 17
2013-03-15 Remedial Casing Cementing 245.00 246.00 0
1987-02-14 Packing Device Capped w/Cement 1752.50 1756.00 0
2013-03-18 Packing Device Capped w/Cement 228.00 236.00 0
1987-02-14 Perforation 1699.50 1701.00 13
1987-02-14 Perforation 1704.00 1707.00 13
1987-02-14 Perforation 1717.00 1719.00 13
1987-02-14 Perforation 1728.50 1730.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References