If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1186081016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.237978,"lon":-119.258581,"icon":""}]} |
| Location: 00/16-10-118-08W6/0 | |
| Location Alias: 00/16-10-18-08 W6M | |
| Location Alias 2: 00/16-10-118-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 118 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 10 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL SHEKILIE 16-10-118-8 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0039424 | |
| License Date: 1970-12-21 | |
| License Status: Suspension | |
| Spud Date: 1971-01-03 | |
| Final Drill Date: 1971-02-06 | |
| Well Total Depth: 1881.50 m | |
| Surface Hole Latitude: 59.237978 | |
| Surface Hole Longitude: -119.258581 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1970-12-21 | Obtained License |
| 1971-01-16 | Drill Stem Test Performed |
| 1971-01-24 | Drill Stem Test Performed |
| 1971-02-06 | Finished Drilling |
| 1971-02-06 | Well Log Performed |
| 1971-02-06 | Well Mode changed to Drilled and Cased |
| 1971-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1971-02-18 | Perforation Treatment Performed - Open-Hole Completion |
| 1971-03-21 | Well Began Production |
| 1971-03-21 | Well Fluid changed to Crude Oil |
| 1971-03-21 | Well Mode changed to Flowing |
| 1974-11-01 | Well Fluid changed to Crude Oil |
| 1974-11-01 | Well Mode changed to Pumping |
| 1975-07-20 | Perforation Treatment Performed - Jet Perforation |
| 1975-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-04-04 | Well Fluid changed to Crude Oil |
| 1979-04-04 | Well Mode changed to Suspended |
| 1979-06-01 | Perforation Treatment Performed - Cement Squeeze |
| 1979-06-02 | Perforation Treatment Performed - Jet Perforation |
| 1980-02-09 | Well Fluid changed to Crude Oil |
| 1980-02-09 | Well Mode changed to Pumping |
| 1991-10-05 | Well Fluid changed to Crude Oil |
| 1991-10-05 | Well Mode changed to Suspended |
| 1994-03-06 | Perforation Treatment Performed - Remedial Casing |
| 1994-03-11 | Well Log Performed |
| 1994-04-16 | Well Log Performed |
| 1994-08-01 | Well Began Injection |
| 1994-08-01 | Well Fluid changed to Water |
| 1994-08-01 | Well Type changed to Injection |
| 1996-03-21 | Well Fluid changed to Water |
| 1996-03-21 | Well Mode changed to Closed |
| 1996-03-21 | Well Type changed to Injection |
| 1996-06-12 | Well Fluid changed to Water |
| 1996-06-12 | Well Type changed to Injection |
| 2002-08-26 | Well Log Performed |
| 2011-02-01 | Well Fluid changed to Water |
| 2011-02-01 | Well Mode changed to Suspended |
| 2011-02-01 | Well Type changed to Injection |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1971-02-07 | Packing Device Capped w/Cement | 1746.50 | 1746.50 | 0 |
| 1971-02-18 | Open Hole/Barefoot Completion | 1733.10 | 1740.40 | 0 |
| 1975-07-20 | Perforation | 1724.60 | 1727.60 | 7 |
| 1975-07-21 | Acid Treatment | 1724.60 | 1727.60 | 0 |
| 1979-06-01 | Cement Squeeze | 1724.60 | 1727.60 | 0 |
| 1979-06-02 | Perforation | 1717.80 | 1721.50 | 13 |
| 1994-03-06 | Remedial Casing Cementing | 1717.80 | 1721.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1971 | 3739 | 0.0 | 0.0 | 0.0 |
| 1972 | 4442 | 0.0 | 0.0 | 0.0 |
| 1973 | 7743 | 0.0 | 0.0 | 0.0 |
| 1974 | 6718 | 0.0 | 0.0 | 0.0 |
| 1975 | 6934 | 0.0 | 0.0 | 0.0 |
| 1976 | 6146 | 0.0 | 0.0 | 0.0 |
| 1977 | 7680 | 0.0 | 0.0 | 0.0 |
| 1978 | 7100 | 0.0 | 0.0 | 0.0 |
| 1979 | 2064 | 0.0 | 0.0 | 0.0 |
| 1980 | 3784 | 0.0 | 0.0 | 0.0 |
| 1981 | 5589 | 0.0 | 0.0 | 0.0 |
| 1982 | 8328 | 0.0 | 0.0 | 0.0 |
| 1983 | 7631 | 0.0 | 0.0 | 0.0 |
| 1984 | 8029 | 0.0 | 0.0 | 0.0 |
| 1985 | 7467 | 0.0 | 0.0 | 0.0 |
| 1986 | 8053 | 0.0 | 0.0 | 0.0 |
| 1987 | 8563 | 0.0 | 0.0 | 0.0 |
| 1988 | 7914 | 0.0 | 0.0 | 0.0 |
| 1989 | 8079 | 0.0 | 0.0 | 0.0 |
| 1990 | 7786 | 0.0 | 0.0 | 0.0 |
| 1991 | 5704 | 0.0 | 0.0 | 0.0 |
| 1994 | 0 | 0.0 | 0.0 | 0.0 |
| 1995 | 0 | 0.0 | 0.0 | 0.0 |
| 1996 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
| 1999 | 0 | 0.0 | 0.0 | 0.0 |
| 2000 | 0 | 0.0 | 0.0 | 0.0 |
| 2001 | 0 | 0.0 | 0.0 | 0.0 |
| 2002 | 0 | 0.0 | 0.0 | 0.0 |
| 2003 | 0 | 0.0 | 0.0 | 0.0 |
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]