X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186081512000

Well Details

Well ID: 1186081512000
Loading map...
Location: 00/12-15-118-08W6/0
Location Alias: 00/12-15-18-08 W6M
Location Alias 2: 00/12-15-118-08 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL SHEKIL 12-15-118-8
Operator Name: Paramount Resources Ltd.
License Number: 0096719
License Date: 1982-07-19
License Status: Abandoned
Spud Date: 1982-07-29
Final Drill Date: 1982-08-20
Well Total Depth: 1860.00 m
Surface Hole Latitude: 59.249612
Surface Hole Longitude: -119.280152

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-07-19 Obtained License
1982-08-20 Finished Drilling
1982-08-20 Well Log Performed
1982-08-20 Well Mode changed to Drilled and Cased
1982-08-22 Liner Casing Operation Performed
1982-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-06 Perforation Treatment Performed - Jet Perforation
1982-09-07 Well Began Production
1982-09-07 Well Fluid changed to Crude Oil
1982-09-07 Well Mode changed to Flowing
1983-02-16 Well Fluid changed to Crude Oil
1983-02-16 Well Mode changed to Pumping
1999-12-07 Perforation Treatment Performed - Jet Perforation
1999-12-07 Well Log Performed
1999-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Suspended
2013-03-03 Well Log Performed
2013-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-04 Plug Back Performed
2013-03-04 Well Fluid changed to Crude Oil
2013-03-04 Well Log Performed
2013-03-04 Well Mode changed to Abandoned Zone
2013-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-05 Perforation Treatment Performed - Jet Perforation
2013-03-05 Perforation Treatment Performed - Remedial Casing
2013-03-05 Well Log Performed
2013-03-06 Perforation Treatment Performed - Jet Perforation
2013-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-07 Perforation Treatment Performed - Remedial Casing
2013-03-08 Perforation Treatment Performed - Jet Perforation
2013-03-08 Well Log Performed
2013-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-09 Perforation Treatment Performed - Remedial Casing
2013-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-10 Perforation Treatment Performed - Jet Perforation
2013-03-10 Well Log Performed
2013-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-11 Perforation Treatment Performed - Jet Perforation
2013-03-11 Well Log Performed
2013-03-14 Perforation Treatment Performed - Remedial Casing
2013-03-15 Well Log Performed
2013-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-16 Perforation Treatment Performed - Jet Perforation
2013-03-16 Well Log Performed
2013-03-17 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2013-03-17 Perforation Treatment Performed - Remedial Casing
2013-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-31 Well Abandoned
2014-03-31 Well Fluid changed to Crude Oil
2014-03-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-06 Perforation 1823.00 1827.00 13
2013-03-05 Packing Device Capped w/Cement 912.50 920.50 0
2013-03-06 Perforation 569.00 570.00 17
2013-03-07 Remedial Casing Cementing 569.00 570.00 0
2013-03-07 Packing Device Capped w/Cement 550.00 562.00 0
2013-03-08 Perforation 457.00 458.00 17
2013-03-09 Remedial Casing Cementing 457.00 458.00 0
2013-03-09 Packing Device Capped w/Cement 441.70 454.50 0
2013-03-10 Perforation 329.00 330.00 99
2013-03-10 Packing Device Capped w/Cement 316.00 324.00 0
2013-03-10 Perforation 292.00 293.00 99
1982-09-06 Acid Treatment 1823.00 1827.00 0
2013-03-11 Perforation 311.00 312.00 99
2013-03-11 Acid Treatment 292.00 312.00 0
2013-03-14 Remedial Casing Cementing 311.00 312.00 0
2013-03-14 Remedial Casing Cementing 292.00 293.00 0
2013-03-16 Perforation 279.00 279.90 99
2013-03-16 Acid Treatment 279.00 279.90 0
2013-03-17 Packing Dev Cpd w/Res-Gyp Cem 282.20 285.90 0
2013-03-17 Remedial Casing Cementing 279.00 279.90 0
2013-03-24 Packing Device Capped w/Cement 239.00 277.40 0
1999-12-07 Perforation 1815.00 1818.00 17
1999-12-07 Perforation 1806.50 1812.00 17
1999-12-08 Acid Treatment 1806.50 1827.00 0
2013-03-04 Packing Device Capped w/Cement 1789.50 1797.50 0
2013-03-05 Packing Device Capped w/Cement 1417.00 1425.00 0
2013-03-05 Perforation 924.00 925.00 17
2013-03-05 Remedial Casing Cementing 924.00 925.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2247 0.0 0.0 0.0
1983 6162 0.0 0.0 0.0
1984 5798 0.0 0.0 0.0
1985 4898 0.0 0.0 0.0
1986 6042 0.0 0.0 0.0
1987 7293 0.0 0.0 0.0
1988 4991 0.0 0.0 0.0
1989 6963 0.0 0.0 0.0
1990 5207 0.0 0.0 0.0
1991 3220 0.0 0.0 0.0
1999 292 0.0 0.0 0.0
2000 6074 0.0 0.0 0.0
2001 7478 0.0 0.0 0.0
2002 8044 0.0 0.0 0.0
2003 7152 0.0 0.0 0.0
2008 7035 0.0 0.0 0.0
2009 285 0.0 0.0 0.0
2010 8 0.0 0.0 0.0
2011 240 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-31 No Incident Encountered 0.00 0.00

For data sources see[6]

References