X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186081616000

Well Details

Well ID: 1186081616000
Loading map...
Location: 00/16-16-118-08W6/0
Location Alias: 00/16-16-18-08 W6M
Location Alias 2: 00/16-16-118-08 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 16
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 16-16-118-8
Operator Name: Paramount Resources Ltd.
License Number: 0106711
License Date: 1984-04-09
License Status: Abandoned
Spud Date: 1984-07-27
Final Drill Date: 1984-08-21
Well Total Depth: 1883.00 m
Surface Hole Latitude: 59.253070
Surface Hole Longitude: -119.284072

For data sources see[1][2]

Well History

Date Event
1984-04-09 Obtained License
1984-07-28 Surface Casing Operation Performed
1984-08-08 Well Log Performed
1984-08-09 Intermediate Casing Operation Performed
1984-08-11 Kick Occurred
1984-08-11 Lost Circulation Occurred
1984-08-21 Finished Drilling
1984-08-21 Well Mode changed to Drilled and Cased
1984-09-03 Well Log Performed
1984-09-07 Liner Casing Operation Performed
1984-09-08 Rig Released
1984-09-09 Perforation Treatment Performed - Cement Squeeze
1984-09-09 Perforation Treatment Performed - Jet Perforation
1984-09-27 Well Log Performed
1984-10-21 Perforation Treatment Performed - Jet Perforation
1984-10-21 Well Log Performed
1984-10-22 Well Began Production
1984-10-22 Well Fluid changed to Crude Oil
1984-10-22 Well Mode changed to Flowing
1985-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-29 Well Fluid changed to Crude Oil
1987-04-29 Well Mode changed to Pumping
1987-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-01 Well Fluid changed to Crude Oil
1991-03-01 Well Mode changed to Suspended
2003-09-16 Well Log Performed
2003-09-18 Perforation Treatment Performed - Cement Squeeze
2003-09-26 Well Log Performed
2003-09-27 Perforation Treatment Performed - Jet Perforation
2003-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-28 Well Log Performed
2003-09-29 Well Log Performed
2003-09-30 Perforation Treatment Performed - Jet Perforation
2003-10-04 Well Log Performed
2003-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-20 Well Began Injection
2004-06-20 Well Fluid changed to Water
2004-06-20 Well Type changed to Injection
2008-03-21 Well Log Performed
2008-03-23 Perforation Treatment Performed - Cement Squeeze
2008-03-23 Plug Back Performed
2008-03-23 Well Log Performed
2008-03-24 Perforation Treatment Performed - Jet Perforation
2010-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-08 Plug Back Performed
2010-09-08 Well Fluid changed to Water
2010-09-08 Well Log Performed
2010-09-08 Well Mode changed to Abandoned Zone
2010-09-08 Well Type changed to Injection
2010-09-10 Perforation Treatment Performed - Jet Perforation
2010-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-14 Perforation Treatment Performed - Remedial Casing
2010-09-15 Perforation Treatment Performed - Jet Perforation
2010-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-16 Perforation Treatment Performed - Remedial Casing
2010-09-17 Perforation Treatment Performed - Jet Perforation
2010-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-18 Perforation Treatment Performed - Remedial Casing
2010-09-20 Perforation Treatment Performed - Jet Perforation
2010-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-21 Perforation Treatment Performed - Remedial Casing
2010-09-22 Perforation Treatment Performed - Jet Perforation
2010-09-22 Well Log Performed
2010-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-23 Perforation Treatment Performed - Remedial Casing
2010-10-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-09 Perforation 1841.50 1842.00 13
2003-09-30 Perforation 1752.00 1756.00 13
2003-09-30 Perforation 1758.00 1761.00 13
2003-10-06 Acid Treatment 1752.00 1761.00 0
2008-03-23 Cement Squeeze 1752.00 1761.00 0
2008-03-24 Perforation 1809.00 1814.00 14
2010-09-08 Packing Device Capped w/Cement 1737.00 1745.00 0
2010-09-08 Packing Device Capped w/Cement 1795.00 1803.00 0
2010-09-08 Packing Device Capped w/Cement 1462.00 1470.00 0
2010-09-10 Perforation 929.00 930.00 17
2010-09-14 Remedial Casing Cementing 929.00 930.00 0
1984-09-09 Cement Squeeze 1841.50 1842.00 0
2010-09-14 Packing Device Capped w/Cement 911.50 921.00 0
2010-09-15 Perforation 571.00 572.00 17
2010-09-16 Acid Treatment 571.00 572.00 0
2010-09-16 Remedial Casing Cementing 571.00 572.00 0
2010-09-16 Packing Device Capped w/Cement 553.10 562.70 0
2010-09-17 Perforation 475.00 476.00 17
2010-09-18 Acid Treatment 475.00 476.00 0
2010-09-18 Remedial Casing Cementing 475.00 476.00 0
2010-09-18 Packing Device Capped w/Cement 458.50 468.00 0
2010-09-20 Perforation 326.00 327.00 17
1984-09-09 Perforation 1834.50 1837.00 13
2010-09-21 Acid Treatment 326.00 327.00 0
2010-09-21 Remedial Casing Cementing 326.00 327.00 0
2010-09-21 Packing Device Capped w/Cement 310.30 319.70 0
2010-09-22 Perforation 186.50 187.50 17
2010-09-23 Remedial Casing Cementing 186.50 187.50 0
2010-09-23 Packing Device Capped w/Cement 174.50 184.40 0
1984-10-21 Perforation 1824.50 1829.50 13
1985-08-02 Acid Treatment 1824.50 1837.00 0
1987-12-01 Acid Treatment 1824.50 1837.00 0
2003-09-18 Cement Squeeze 1824.50 1837.00 0
2003-09-27 Perforation 1848.00 1853.00 13
2003-09-28 Acid Treatment 1848.00 1853.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1407 0.0 0.0 0.0
1985 7093 0.0 0.0 0.0
1986 3220 0.0 0.0 0.0
1987 3669 0.0 0.0 0.0
1988 7680 0.0 0.0 0.0
1989 7173 0.0 0.0 0.0
1990 1200 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-08-11 Lost Circulation 1581.00 1883.00
1984-08-11 Kick 1581.00 1883.00

For data sources see[6]

References